Attachment 14 Replace Blrs 1 2.pdf

PDF 5 MB Posted

Attached to
C1DA--518-21-110 Steam Replacement and Distribution Federal contract opportunity
Solicitation number
36C24122Q0614
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This document is a sources sought notice from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 for architectural and engineering design services. The objective is an A/E design package consisting of a thorough review of the current Energy Distribution System at the Bedford VA Medical Center located in Bedford, Massachusetts, an overall energy and efficiency audit of the entire system, a minimum of two alternative upgrade scenarios, and construction drawings and cost estimates to implement each scenario. The scope of work includes Type A and B architectural and engineering services for a period of performance of 250 calendar days with a construction budget between $2,000,000 to $5,000,000. The notice requests SF-330 qualification statements from qualified SDVOSB firms by July 8, 2022. Responses should include experience with similar A/E and energy distribution system design projects, past performance, staff competency, and location within 200 miles of the Bedford VAMC. The selection process will occur in two stages with an initial evaluation of SF-330 statements followed by a request for price proposals to the most qualified firm.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--518-21-110 Steam Replacement and Distribution, newest first.
File Type Posted
36C24122Q0614 0002.docx DOCX document
36C24122Q0614 0001.docx DOCX document
Attachment 22 Steam Energy Distribution Specification section 33 63 00.docx DOCX document
Attachment 13 Boiler 3 Replacement.pdf PDF
Attachment 16 Steam Heating Hot Water Outside Distribution Sys Design Manual.pdf PDF
Attachment 12b Electrical Panel Drawings 480 120 volt.pdf PDF
Attachment 7 Upgrade Steam Distribution System Phase III.pdf PDF
Attachment 3 Facility Master Plan.pdf PDF
Attachment 2 Geographic Site Overview.pdf PDF
36C24122Q0614.docx DOCX document
Attachment 23 HVAC Design Manual.pdf PDF
Attachment 18 Outside Steam Heating Hot Water Distribution Systems Design Manual.pdf PDF
Attachment 17 Boiler Plant Piping System Specification section 23 2 111.docx DOCX document
Attachment 9 Repair Stacks Steam Lines.pdf PDF
Attachment 8 Alterations to Buildings 2 4 22 and Steam Distribution System.pdf PDF
Attachment 5 Upgrade Steam Distribution System Phase I.pdf PDF
Attachment 4 Steam Distribution Drawings.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx DOCX document
Attachment 24 Cleaver Brookes Package Boiler Model CBLE 125 800 hp.pdf PDF
Attachment 21 Boiler Plant Mechanical Equipment Specification section 23 50 11.docx DOCX document
Attachment 20 Steam Condensate Pumps for HVAC Specification section 23 22 23.docx DOCX document
Attachment 19 Steam and Condensate Heating Piping Spec section 23 22 13.docx DOCX document
Attachment 15 Boiler Plant Safety Improvement Bldg 22.pdf PDF
Attachment 12a Updated High Voltage Electrical One-Line Schematics.pdf PDF
Attachment 11 Steam Condensate Return System.pdf PDF
Attachment 10 Standard Plumbing Sheets.pdf PDF
Attachment 6 Upgrade Steam Distribution System Phase II.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B22 T-1 Title Sheet (12334+12335).PDF

B22 PD-1 Plumbing Demolition Plan (12336+12337+12338+12339).PDF
B22 P-1 Plumbing Plan (12340+12341).PDF
B22 P-2 Plumbing Legends and Details (12342+12343).PDF
B22 H-1 HVAC Plan (12344+12345).PDF
B22 G-D1 Boiler Room Demolition Plan (12346+12347).PDF
B22 G-D2 Demolition Sections 1 (12348+12349).PDF
B22 G-D3 Demolition Sections 2 (12350+12351).PDF
B22 G-1 Legend, Notes & Symbols (12352+12353).PDF
B22 G-2 Equipment Schedules (12354+12355).PDF
B22 G-3 Boiler Room - Lower Piping Plan (12356+12357).PDF
B22 G-4 Boiler Room - Upper Piping Plan (12358+12359).PDF

File details come from the government source that posted it. Updated .