Attachment 13 Boiler 3 Replacement.pdf
PDF 11 MB Posted
- Attached to
- C1DA--518-21-110 Steam Replacement and Distribution Federal contract opportunity
- Solicitation number
- 36C24122Q0614
About this file
This document is a sources sought notice for architectural and engineering design services for a steam replacement and distribution project at the Bedford VA Medical Center in Bedford, Massachusetts. Interested SDVOSB firms must provide SF-330 qualification statements and evidence of experience with similar medical facility projects by July 8, 2022 to be considered. The design effort is to cost between $2-5 million and be completed within 250 calendar days of notice to proceed. A two-stage evaluation process will first assess qualifications, then request pricing from the most qualified firm. The scope involves reviewing the existing energy distribution system and developing alternative upgrade scenarios and construction documents.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Architects Engineers Planners
Foxborough, Massachussetts 02035 33 Commercial Street, Suite #1
Maguire Group Inc.
AutoCAD SHX Text
GROUNDING MODIFICATIONS
22-E1
MFW
HDA
9/26/08
SKE-2
DEPT. OF VETERANS AFFAIRS
DRAWN BY:
CHK'D BY:
DATE:
REF:
DWG. NO.
SHEET OF
PROJ. NO.
E.N.R. MEM. VET. HOSPITAL REPLACE BOILER-BLDG. 22
17664
225A
125A
800A
300A
100A
175A
800A/3P MAIN
SPARE
EXISTING SWITCHBOARD; 800A, 277/480V, 3 , 4W,RATED 22,000 A.I.C.
%%UNORMAL
%%USTAND-BY
EXISTING GROUND BUS
NEW 1"C-#3/0 CU GROUND CABLE
PROVIDE A NEW GROUND CABLE AND CLAMP ON EXISTING WATER SERVICE ENTRANCE
400A
PROVIDE #3/0 CU JUMPER ACROSS FLANGE
T
2 SETS-3"C-4 #350KC MIL, 1 #2GND
NEW 600A/3P 600V "MAIN SERVICE ENTRANCE DISCONNECT SWITCH"
2 SETS-4"C-4 #350KC MIL,
NEW PADMOUNTED 500KVA TRANSFORMER 13.8KV-277/480V (601A OUTPUT)
SEE NOTE "E"
SEE NOTE "A"
NEW GROUND BUS
3/4" x 10'-0" LONG COPPERCLAD GROUND ROD. TOP OF ROD DRIVEN TO MINIMUM 6" BELOW GRADE
3/4"C-#6 COPPER GROUND CABLE
Sheets and Views
17664FE-SKE-2-SKE-2
GENERAL NOTES: DEMOLITION NOTES:
ABBREVIATIONS:
LEGEND: NOTES:
one-quarter inch=one foot one-eigth inch=one foot
0 8 16
VA FORM 08-6231A, JAN 1990
Revisions
Date
F three-eigths inch=one foot one-half inch=one foot
E one and one-half inches=one foot one inch=one foot three-quarters inch=one foot
D
C
B three inches=one foot
A
Approved: Chief, Eng. Svc
Drawing Title
Approved: Safety Manager
Approved: Project Engineer
Building Number
Project Title
Location
Checked
Dwg.
Of
518-04-106
Drawn
DRAWING NO.
06/18/07
Project No.
Architects/Engineers/Planners
Foxborough, MA 02035
33 Commercial Street, Suite 1
REVIEWED BY:
CIVIL: INITIAL&DATE INITIAL&DATEINITIAL&DATE
ARCH: INITIAL&DATE INITIAL&DATEINITIAL&DATE
STRU: INITIAL&DATE INITIAL&DATEINITIAL&DATE
PLUM: INITIAL&DATE INITIAL&DATEINITIAL&DATE
FIRE: INITIAL&DATE INITIAL&DATEINITIAL&DATE
MECH: INITIAL&DATE INITIAL&DATEINITIAL&DATE
ELEC: INITIAL&DATE INITIAL&DATEINITIAL&DATE
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
BEDFORD, MASSACHUSETTS
22-E1
DLL
DRD
NOTES, ABBREVIATIONS, LEGEND, AND SINGLE-LINE DIAGRAM AND SCHEDULE
GFI
c wp
AFG
AFF
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
CIRCUIT BREAKER
C/B
FBO
GROUND
GND
GFI
FURNISHED BY OTHERS
GROUND-FAULT INTERRUPTER
RIGID GALVANIZED CONDUIT
REMOVE AND DISPOSE OF
RGC
UH
UNIT HEATER
NIC
R & D
PNL
NEC
NOT IN CONTRACT
PANEL
NATIONAL ELECTRIC CODE
MOUNTED
MAIN LUGS ONLY
MLO
MTD
NON-FUSED
NF
AMP
AMPERES
CONDUIT
MCB
MAIN CIRCUIT BREAKER
HOT WATER PUMP
HWP
S
M
ELECTRICAL CONTRACTOR
EC
SINGLE-POLE TOGGLE SWITCH, MOUNTED ON CENTERLINE 48" A.F.F.; TYPICAL FOR ALL TOGGLE SWITCHES.
J
MOTOR, NUMERAL DENOTES HORSEPOWER. WHERE MOTORS SHOW NO NUMERAL, HORSEPOWER IS OF 1/8 OR SMALLER; INSTALLED BY OTHERS, AND WIRED BY ELECTRICAL CONTRACTOR UNDER DIV. 16.
COMBINATION MAGNETIC STARTER WITH H-O-A SWITCH AND PILOT LIGHT FURNISHED UNDER DIV. 15, INSTALLED AND WIRED UNDER DIV. 16.
SPECIAL PURPOSE OUTLET, SIZE AND TYPE AS NOTED, VERIFY SIZE WITH EQUIPMENT.
1. CONTRACTOR SHALL VISIT SITE AND EXAMINE CONDITIONS UNDER WHICH WORK MUST BE CONTRACTOR SHALL VISIT SITE AND EXAMINE CONDITIONS UNDER WHICH WORK MUST BE PERFORMED. COMMENCEMENT OF WORK SHALL BE CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS INCLUDING PREPARATORY WORK DONE BY OTHERS. 2. PROVIDE MATERIALS, LABOR AND EQUIPMENT TO MAKE INSTALLATION COMPLETE IN EVERY PROVIDE MATERIALS, LABOR AND EQUIPMENT TO MAKE INSTALLATION COMPLETE IN EVERY DETAIL UNDER THIS CONTRACT WHETHER OR NOT SPECIFICALLY SHOWN ON DRAWINGS. 3. ALL ELECTRICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION ALL ELECTRICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND THE COMMONWEALTH OF MASSACHUSETTS BUILDING CODE, AND THE COMMONWEALTH OF MASSACHUSETTS ELECTRICAL CODE. MATERIAL AND EQUIPMENT SHALL BE UL LISTED FOR THE INTENDED SERVICE. 4. ADDITIONAL JUNCTION BOXES SHALL BE FURNISHED AND INSTALLED WHERE REQUIRED. ADDITIONAL JUNCTION BOXES SHALL BE FURNISHED AND INSTALLED WHERE REQUIRED. 5. ALL CONDUITS SHALL CONTAIN AN INSULATED GREEN SAFETY GROUND WIRE. BOND ALL ALL CONDUITS SHALL CONTAIN AN INSULATED GREEN SAFETY GROUND WIRE. BOND ALL PANELS, CABINETS, ENCLOSURES, CONDUITS, ETC., AS REQUIRED PER CODE. 6. PROVIDE CONDUIT SLEEVES FILLED WITH AN APPROVED FIRE RESISTANT MATERIAL WHERE PROVIDE CONDUIT SLEEVES FILLED WITH AN APPROVED FIRE RESISTANT MATERIAL WHERE FIRE RATED WALLS OR CEILINGS ARE PENETRATED. APPROVED WATERTIGHT CONDUIT SLEEVES SHALL BE PROVIDED WHERE WALLS ARE PENETRATED EITHER ENTERING OR LEAVING THE BUILDING. 7. WHERE CONDUITS ARE NOT IDENTIFIED, THEY SHALL BE 3/4" WITH 2 #12, 1 #12 EQUIPMENT WHERE CONDUITS ARE NOT IDENTIFIED, THEY SHALL BE 3/4" WITH 2 #12, 1 #12 EQUIPMENT GROUND. GROUND CONDUCTOR IS NOT SHOWN ON DRAWINGS FOR CLARITY. 8. POWER ITEMS BRANCH CIRCUIT WIRING MAY NOT BE SHOWN BUT SHALL BE PROVIDED AS POWER ITEMS BRANCH CIRCUIT WIRING MAY NOT BE SHOWN BUT SHALL BE PROVIDED AS REQUIRED. MINIMUM WIRING SHALL BE 3/4"C-2 #12, 1 #12 GROUND. NO MORE THAN THREE PHASES MAY BE COMBINED IN A SINGLE HOMERUN AND EACH PHASE SHALL BE PROVIDED WITH AN INDIVIDUAL NEUTRAL. 9. FOR EXACT LOCATIONS OF MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS AND FOR EXACT LOCATIONS OF MECHANICAL EQUIPMENT, REFER TO MECHANICAL DRAWINGS AND SPECIFICATIONS. 10. ALL CONDUIT AND CABLES SHALL BE RUN EXPOSED. ALL CONDUIT AND CABLES SHALL BE RUN EXPOSED. 11. ALL CUTTING, PATCHING AND FIRE STOPPING RELATED TO ELECTRICAL WORK SHALL BE ALL CUTTING, PATCHING AND FIRE STOPPING RELATED TO ELECTRICAL WORK SHALL BE THE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR. 12. CIRCUIT WIRING AND HOMERUNS WITH LENGTHS LONGER THAN 90 FEET SHALL USE #10 CIRCUIT WIRING AND HOMERUNS WITH LENGTHS LONGER THAN 90 FEET SHALL USE #10 AWG, THOSE LONGER THAN 140 FEET SHALL USE #8 CONDUCTORS. 13. ELECTRICAL CONTRACTOR SHALL PROVIDE A TEMPORARY GENERATOR TO SUPPLY POWER TO ELECTRICAL CONTRACTOR SHALL PROVIDE A TEMPORARY GENERATOR TO SUPPLY POWER TO THE BOILER PLANT WHILE THE NORMAL ELECTRICAL POWER FEEDER TO THE POWER PLANT IS UPGRADED. CONTRACTOR MAY NEGOTIATE THE USE OF THE SITE GENERATOR WITH THE OWNER. 14. ALL WORK MUST BE INSTALLED IN ACCORDANCE WITH "OSHA" AND "ADA" REQUIREMENTS ALL WORK MUST BE INSTALLED IN ACCORDANCE WITH "OSHA" AND "ADA" REQUIREMENTS 15. ALL CONDUITS, AND EQUIPMENT ARE SHOWN DIAGRAMMATICALLY. EXACT LOCATION AND METHOD ALL CONDUITS, AND EQUIPMENT ARE SHOWN DIAGRAMMATICALLY. EXACT LOCATION AND METHOD OF SUPPORT SHALL BE DETERMINED IN THE FIELD, EXCEPT WHERE SPECIFIC DIMENSIONS AND DETAILS ARE SHOWN. 16. AS DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL , WITHOUT EXTRA CHARGE, MAKE AS DIRECTED BY THE ENGINEER, THE CONTRACTOR SHALL , WITHOUT EXTRA CHARGE, MAKE REASONABLE MODIFICATIONS IN THE LAYOUT AS NEEDED TO PREVENT CONFLICT WITH WORK OF OTHER TRADES OR OF PROPER EXECUTION OF THE WORK. 17. ALL WIRING SHALL BE SINGLE CONDUCTOR COPPER, HEAT AND MOISTURE RESISTANT 600 VOLT ALL WIRING SHALL BE SINGLE CONDUCTOR COPPER, HEAT AND MOISTURE RESISTANT 600 VOLT INSULATION, TYPE THWN-THHN. MIN. SIZE OF CONDUCTOR SHALL BE 12 AWG, UNLESS OTHERWISE NOTED. 18. THE ELECTRICAL CONTRACTOR SHALL CONSULT AND COOPERATE WITH CONTRACTORS OF OTHER THE ELECTRICAL CONTRACTOR SHALL CONSULT AND COOPERATE WITH CONTRACTORS OF OTHER TRADES TO AVOID ANY INTERFERENCE IN THE INSTALLATION OF THEIR RESPECTIVE EQUIPMENT. 19. WHERE REQUIRED, ADDITIONAL SUPPORT STEEL OR STRUT FOR THE ELECTRICAL INSTALLATION WHERE REQUIRED, ADDITIONAL SUPPORT STEEL OR STRUT FOR THE ELECTRICAL INSTALLATION SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CONTRACTOR. 20. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT, WIRE, JUNCTION BOXES, ETC. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT, WIRE, JUNCTION BOXES, ETC. NECESSARY TO COMPLETE THIS INSTALLATION. 21. THE LOCATION OF ALL ITEMS SHOWN ON THESE DRAWINGS THAT ARE NOT DEFINITELY FIXED BY THE LOCATION OF ALL ITEMS SHOWN ON THESE DRAWINGS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS OR ELEVATIONS ARE APPROXIMATE ONLY. THE EXACT LOCATION NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED IN THE FIELD AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. 22. ALL CONDUITS RUN ABOVE 4ft SHALL BE ELECTRIC METALLIC TUBING (EMT). NO CONDUIT ALL CONDUITS RUN ABOVE 4ft SHALL BE ELECTRIC METALLIC TUBING (EMT). NO CONDUIT SMALLER THAN 3/4" ELECTRICAL TRADE SIZE SHALL BE USED, UNLESS SPECIFICALLY CALLED FOR ON THE DRAWINGS, CONDUITS RUN BELOW 4ft AFF SHALL BE RIGID GALVANIZED THICK-WALLED STEEL CONDUIT. 23. MOUNTING HEIGHTS OF ELECTRICAL EQUIPMENT SHALL BE AS FOLLOWS, UNLESS OTHERWISE MOUNTING HEIGHTS OF ELECTRICAL EQUIPMENT SHALL BE AS FOLLOWS, UNLESS OTHERWISE NOTED: a. MOTOR STARTER - 6'-6" FROM FLOOR TO TOP OF ENCLOSURE b. ALL POWER RECEPTACLES PUSH BUTTON STATIONS, SAFETY SWITCHES, ETC. SHALL BE MOUNTED 4'-0" TO BOTTOM UNIT ABOVE FINISHED FLOOR OR PLATFORM ELEVATION, UNLESS OTHERWISE NOTED. 24. CONNECTIONS TO MOTORS SHALL BE MADE WITH LIQUID-TIGHT FLEXIBLE METAL CONDUIT WITH CONNECTIONS TO MOTORS SHALL BE MADE WITH LIQUID-TIGHT FLEXIBLE METAL CONDUIT WITH GROUND CONDUCTORS. WHERE FLEXIBLE CONDUIT IS UTILIZED FOR CONNECTING RIGID CONDUIT TO A MOTOR TERMINAL BOX, IT SHALL BE THE SAME SIZE AS THE RIGID CONDUIT CONTAINING THE MOTOR LEADS. A JUMPER WIRE SHALL BE INSTALLED BETWEEN THE RIGID CONDUIT AND THE MOTOR FRAME TO INSURE A POSITIVE GROUND CONNECTION. THIS GROUND WIRE SHALL BE #4 AWG. UNLESS OTHERWISE NOTED. 25. PROVIDE BLACK LAMINATED MICARTA MANEPLATES WITH 1/4" HIGH RECESSED WHITE LETTERS PROVIDE BLACK LAMINATED MICARTA MANEPLATES WITH 1/4" HIGH RECESSED WHITE LETTERS FOR DISCONNECT SWITCHES, AND OTHER ELECTRICAL EQUIPMENT. SECURE WITH PLATED MACHINE SCREWS OR POP RIVETS. 26. A SET OF RECORD DRAWING CONSISTING OF NEW INSTALLATION CIRCUITING AND CHANGES A SET OF RECORD DRAWING CONSISTING OF NEW INSTALLATION CIRCUITING AND CHANGES FROM INITIAL DRAWINGS WILL BE DEVELOPED BY THE CONTRACTOR AND DELIVERED TO THE COTR UPON COMPLETION OF WORK. 27. GUARANTEE WORK IN WRITING FOR ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPAIR OR GUARANTEE WORK IN WRITING FOR ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPAIR OR REPLACE DEFECTIVE MATERIALS AT NO COST TO OWNER. CORRECT DAMAGE CAUSED IN MAKING NECESSARY REPAIRS AND REPLACEMENTS UNDER GUARANTEE AT NO COST TO OWNER. 28. ELECTRICAL CONTRACTOR SHALL USE EXTREME CARE IN MAINTAINING THE EXISTING TELEPHONE ELECTRICAL CONTRACTOR SHALL USE EXTREME CARE IN MAINTAINING THE EXISTING TELEPHONE SYSTEM, FIRE ALARM SYSTEM, AND PA SYSTEM DURING BOILER ROOM RENOVATIONS. ALL SYSTEMS SHALL REMAIN FUNCTIONAL AT ALL TIMES. ANY DISRUPTIONS IN SERVICE SHALL BE IMMEDIATELY REPAIRED. ANY REPAIRS OR WORK REQUIRED ON THE TELEPHONE SYSTEM SHALL BE PERFORMED BY FUJITSU AND ANY REPAIRS OR WORK ON THE FIRE ALARM SYSTEM SHALL BE PERFORMED BY TARA ELECTRIC. THE COSTS FOR ANY REPAIRS OR WORK ON THESE SYSTEMS SHALL BE THE SOLE RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR & IN INCLUDED IN HIS SCOPE OF WORK.
THREE-CIRCUIT HOMERUN TO PANELBOARD, HATCHMARKS DENOTE NUMBER OF #12AWG CONDUCTORS WHERE MORE THAN 2, EXCLUDING GROUND. (THREE PHASE CONDUCTORS AND THREE NEUTRALS ARE SHOWN.
MAGNETIC MOTOR STARTER WITH H-O-A SWITCH AND PILOT LIGHT IN COVER, FURNISHED UNDER DIV. 15, INSTALLED AND WIRED UNDER DIV. 16.
EMERGENCY BOILER DISCONNECT SWITCH MOUNTED CENTER-LINE 54" A.F.F., PROVIDE WITH RED NAMEPLATE. WIRE IN SERIES WITH FIRE-O-MATIC SWITCH INTO BOILER CONTROL CIRCUIT.
Sem
FIRE-O-MATIC SWITCH MOUNTED OVER BOILER, PROVIDED, INSTALLED, AND WIRED UNDER DIV. 16.
FM
COMPACT FLUORESCENT OR H.I.D. LIGHT FIXTURE WITH OUTLET. LETTER DENOTES FIXTURE TYPE, SEE FIXTURE SCHEDULE. SUBSCRIPT DENOTES CIRCUIT NUMBER AND SWITCH CONTROL.
MANUAL MOTOR STARTER WITH THERMAL OVERLOAD PROTECTION. "wp" DENOTES WEATHERPROOF.
DUPLEX RECEPTACLE, 125V, 20 AMP, MOUNTED 18" AFF. "GFI" DENOTES GROUND FAULT INTERRUPTING TYPE; "c" DENOTES MOUNTED 6" ABOVE COUNTER OR 42" A.F.F. TO BOTTOM.
DUPLEX RECEPTACLE, 125V, 20 AMP, MOUNTED 42" AFF OR 0'-6" ABOVE COUNTER TO BOTTOM.
ELECTRICAL CONDUIT AND WIRING RUN EXPOSED. (3/4"C-2 #12, 1 #12 GND), UNLESS OTHERWISE NOTED.
ELECTRICAL CONDUIT AND WIRING RUN 24" BELOW GRADE MINIMUM, SIZED AS INDICATED.
J
JUNCTION BOX - SIZE, TYPE AND MOUNTING AS REQUIRED.
PANELBOARD MOUNTED TOP OF PANEL 6'-6" A.F.F., SURFACE MOUNTED.
NON-FUSED DISCONNECT SWITCH, SIZE AS REQUIRED. "wp" DENOTES WEATHERPROOF, NEMA 3R.
MOMENTARY CONTACT SWITCH.
FIRE ALARM SYSTEM MANUAL PULL STATION, MOUNTED 48" A.F.F..
%%UC
B-1
%%UB
B-9
WALL-MOUNTED COMPACT FLUORESCENT OR H.I.D. LIGHT FIXTURE. LETTER DENOTES FIXTURE TYPE, SEE FIXTURE SCHEDULE. SUBSCRIPT DENOTES CIRCUIT NUMBER AND SWITCH CONTROL.
SELF-CONTAINED SINGLE-FACE ILLUMINATED EXIT SIGN. LETTER DENOTES FIXTURE TYPE, SEE LIGHTING FIXTURE SCHEDULE. CONNECT WITH 3/4"C-2 #10, 1 #10 GND. TO UNSWITCHED LOCAL AREA LIGHTING CIRCUIT.
wp
HORIZONTAL UNIT HEATER
HUH
EXISTING PANEL "L3"
T-4
EXISTING PANEL "L2"
T-3
EXISTING PANEL "L1"
T-2
EXISTING PANEL "P2"
EXISTING PANEL "P1"
800A
100A
175A
T-1
800A/3P MAIN
EXISTING PANEL "N1"
G
EXISTING SWITCHBOARD; 800A, 277/480V, 3 , 4W,RATED 22,000 A.I.C.
%%UNORMAL
%%USTAND-BY
EXISTING 112.5KVA TRANSFORMER; 480/120/208V, 3
EXISTING 2"C-3 #2/0, 1 #6 GND.
EXISTING PANEL; 120/208V, 3 ,4W, 400A
EXISTING 4"C-4 #500KC MIL, 1 #2 GND.
EXISTING FEEDER CABLE TO TRAILER
EXISTING 3"C-3 #500KC MIL, 1 #3 GND.
EXISTING JUNCTION BOX
EXISTING 3"C-3 #500KC MIL, 1 #3 GND.
EXISTING 400A AUTOMATIC TRANSFER SWITCH 277/480V
EXISTING STAND-BY 180KW GENERATOR; 277/480V, 3 , 4WSEE NOTE "B"
EXISTING TRANSFORMER; 480/208/120V, 75KVA
EXISTING 1 1/2"C-3 #1, 1 #6 GND.
EXISTING 2 1/2"C-4 #4/0, 1 #4 GND.
EXISTING PANEL; 225A, 480V, 3 , 4W
EXISTING PANEL; 400A, 480V, 3 , 4W
EXISTING PANEL; 225A, 102/208V, 3 , 4W
EXISTING PADMOUNTED 225KVA TRANSFORMER; 13.8KV-277/480V (270A OUTPUT)
EXISTING 4"C-4 #600KC MIL, 1 #2 GND.
EXISTING JUNCTION BOX
EXISTING PRIMARY TO EXISTING ELECTRICAL MANHOLE "EMH1"
EXISTING GROUND BUS
NEW 1"C-#3/0 CU GROUND CABLE
PROVIDE A NEW GROUND CABLE AND CLAMP ON EXISTING WATER SERVICE ENTRANCE
EXISTING AND NEW POWER SINGLE-LINE DIAGRAM NO SCALE
A. DISCONNECT EXISTING 500KC MIL CABLES FROM EXISTING 300A CB. RECONNECT EXISTING DISCONNECT EXISTING 500KC MIL CABLES FROM EXISTING 300A CB. RECONNECT EXISTING 500KC MIL CABLES TO NEW 400A CB INSTALLED IN EXISTING SPACE. 300 CB SHALL BE LABELED "SPARE". NEW CB LABELED "GENERATOR NORMAL". B. NEW 400A NORMAL FEED CIRCUIT BREAKER FEEDING EXISTING 400A TRANSFER SWITCH AND NEW 400A NORMAL FEED CIRCUIT BREAKER FEEDING EXISTING 400A TRANSFER SWITCH AND CONNECTION OF NEW BOILER #3 TO STANDBY SECTION OF EXISTING SWITCHBOARD IS BASED ON THE FUTURE REPLACEMENT OF THE EXISTING STANDBY 180KW GENERATOR WITH A NEW STANDBY GENERATOR AND FEEDER TO THE EXISTING TRANSFER SWITCH WITH A MIN. CAPACITY OF 400A. C. IN EXISTING PANEL "P2" CONNECT NEW BOILER #3 FEEDER TO EXISTING SPARE 125A/3P IN EXISTING PANEL "P2" CONNECT NEW BOILER #3 FEEDER TO EXISTING SPARE 125A/3P CIRCUIT BREAKER. LABEL CB "BOILER #3". D. DISCONNECT AND REMOVE EXISTING 4#4/0, 1#4GND FROM EXISTING 225A CB AND PANEL DISCONNECT AND REMOVE EXISTING 4#4/0, 1#4GND FROM EXISTING 225A CB AND PANEL "P2". INSTALL AND CONNECT NEW 350KC MIL FEEDER IN EXISTING CONDUIT TO NEW 300A CB AND PANEL "P2". LABEL NEW CB PANEL "P2" AND LABEL ORIGINAL 225A CB "SPARE". E. NEW 3-1/C#4/0 15KV SHEILDED, JACKETED CABLE 133% INSULATION RATING AND 1#3/0 NEW 3-1/C#4/0 15KV SHEILDED, JACKETED CABLE 133% INSULATION RATING AND 1#3/0 COPPER GROUND CABLE IN NEW ACTIVE 4" CONCRETE ENCASED DUCT TO EXISTING "EMH1" SHOWN ON DWG. 22 - E3
EXISTING 2 1/2" W/NEW 4#350KC MIL, 1 #3GND
SEE NOTE "C"
NEW BOILER CONTROL PANEL FUNISHED AND INSTALLED BY DIV. 15.
NEW 200A/3P 600V DISCONNECT SWITCH
2"C-3 #1, 1 #6GND
400A
PROVIDE #3/0 CU JUMPER ACROSS FLANGE
2 SETS-3"C-4 #350KC MIL, 1 #2GND
NEW 600A/3P 600V "MAIN SERVICE ENTRANCE DISCONNECT SWITCH"
2 SETS-4"C-4 #350KC MIL, 1 #2GND
NEW PADMOUNTED 500KVA TRANSFORMER 13.8KV-277/480V (601A OUTPUT)
1. EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS HAS BEEN DERIVED FROM THE EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS HAS BEEN DERIVED FROM THE BEST AVAILABLE EXISTING DRAWINGS AND MUST BE FIELD VERIFIED PRIOR TO CONSTRUCTION AS REQUIRED. ANY EQUIPMENT THAT IS NOT IDENTIFIED AND CONFLICTS WITH CONSTRUCTION SHALL NOT BE DISCONNECTED AND SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER/ENGINEER FOR DISPOSITION. 2. EXISTING ELECTRICAL EQUIPMENT AND DEVICES TO BE REMOVED SHALL BE REMOVED EXISTING ELECTRICAL EQUIPMENT AND DEVICES TO BE REMOVED SHALL BE REMOVED COMPLETELY INCLUDING WIRING BACK TO EXISTING POWER DISTRIBUTION SOURCE. WHERE WIRING IS TO BE REMOVED, RELOCATED OR RECONNECTED, THE CONTRACTOR SHALL PROTECT WIRING FROM DAMAGE. CONTRACTOR SHALL TAKE PRECAUTIONS AND ASSUME CIRCUIT MAY BE ACTIVE. CONTRACTOR TO TEST, VERIFY AND SECURE ALL CIRCUITS BEFORE REMOVAL. UNKNOWN WIRING SHALL BE IDENTIFIED. ANY WIRING TO REMAIN SHALL BE VERIFIED BY THE CONTRACTOR AND SHALL BE TAGGED AND IDENTIFIED. 3. EXISTING ELECTRICAL EQUIPMENT TO REMAIN SHALL BE PROTECTED FROM DAMAGE AS EXISTING ELECTRICAL EQUIPMENT TO REMAIN SHALL BE PROTECTED FROM DAMAGE AS REQUIRED DURING THE CONSTRUCTION PERIOD AND LEFT IN GOOD WORKING ORDER AT COMPLETION. ANY EQUIPMENT DAMAGED SHALL BE REPLACED BY THE ELECTRICAL CONTRACTOR AT NO EXPENSE TO THE OWNER. 4. OWNER AND CODE REQUIRED SYSTEMS THAT ARE REQUIRED TO REMAIN ACTIVE DURING OWNER AND CODE REQUIRED SYSTEMS THAT ARE REQUIRED TO REMAIN ACTIVE DURING CONSTRUCTION SHALL BE TEMPORARILY WIRED TO REMAIN ACTIVE THROUGHOUT THE CONSTRUCTION PERIOD OR UNTIL NEW SYSTEMS ARE INSTALLED, TESTED AND ACCEPTED. 5. IN CONDITIONS WHERE, IN THE OPINION OF THIS CONTRACTOR, IT IS NOT CLEAR WHETHER IN CONDITIONS WHERE, IN THE OPINION OF THIS CONTRACTOR, IT IS NOT CLEAR WHETHER EXISTING ELECTRICAL EQUIPMENT IS TO BE REMOVED OR REMAIN, IT SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER FOR REVIEW AND FINAL DECISION. 6. ANY DISRUPTION OF ANY ELECTRICAL SERVICE NECESSITATED BY THE ELECTRICAL ANY DISRUPTION OF ANY ELECTRICAL SERVICE NECESSITATED BY THE ELECTRICAL RENOVATIONS SHALL BE COORDINATED WITH THE OWNER IN ORDER FOR PROPER NOTICE GIVEN TO THE OCCUPANTS PRIOR TO THE DISCONNECTION OF ANY SERVICE. 7. EXISTING ELECTRICAL EQUIPMENT REMOVED SHALL BE BROKEN DOWN INTO MANAGEABLE EXISTING ELECTRICAL EQUIPMENT REMOVED SHALL BE BROKEN DOWN INTO MANAGEABLE LENGTHS FOR STORAGE, HANDLING AND DISPOSAL. 8. EXISTING ELECTRICAL EQUIPMENT REMOVED OF MATERIAL VALUE SHALL BE TURNED OVER EXISTING ELECTRICAL EQUIPMENT REMOVED OF MATERIAL VALUE SHALL BE TURNED OVER TO THE OWNER FOR HIS FINAL DISPOSITION. 9. ELECTRICAL RENOVATION WORK SHALL BE ACCOMPLISHED IN CONFORMANCE WITH THE ELECTRICAL RENOVATION WORK SHALL BE ACCOMPLISHED IN CONFORMANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE. 10. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND FEEDERS PASSING THROUGH MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND FEEDERS PASSING THROUGH RENOVATED AREAS AND SERVICING UNDISTURBED AREAS. 11. EXISTING CONDUIT MAY BE REUSED WHERE FEASIBLE. ALL OTHER MATERIAL AND EXISTING CONDUIT MAY BE REUSED WHERE FEASIBLE. ALL OTHER MATERIAL AND EQUIPMENT SHALL BE REMOVED FROM THE JOB SITE UNLESS OTHERWISE DIRECTED BY THE COTR. 12. RELOCATE EXISTING TELEPHONE/PA EQUIPMENT, AND BRANCH WIRING AS NECESSARY. RELOCATE EXISTING TELEPHONE/PA EQUIPMENT, AND BRANCH WIRING AS NECESSARY. COORDINATE RELOCATION WITH VA PERSONAL. 13. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE TEMPORARY POWER DURING ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE TEMPORARY POWER DURING CONSTRUCTION TO THE BOILERS, CITY WASTE LIFT PUMPS, CONDENSATE RETURN PUMPS, TEMPORARY CONSTRUCTION POWER FOR LIGHTING AND RECEPTACLES, FOR CONSTRUCTION WELDING OUTLETS, FIRE ALARM CONTROL PANEL AND ENERGY MANAGEMENT CONTROL PANELS.
SEE NOTE "D"
SEE NOTE "E"
SEE NOTE "A"
Sheets and Views
17664FE01-Layout1
INTERIOR ELEVATION - DEMOLITION
1/4" = 1'-0"
INTERIOR ELEVATION - PROPOSED
EXISTING CLEAR STORY WINDOW
EXISTING STEEL BEAM
REMOVE AND DISPOSE OF BRICK
REMOVE AND DISPOSE OF COILING AND PEDESTRIAN PASS DOOR AND FRAME
COILING DOOR W/ PEDESTRIAN PASS DOOR
UTILITY BRICK INFILL (SIZE TO MATCH EXIST., PAINTED TO MATCH EXIST.)
22-A1
EXISTING UTILITY BRICK
NOTE: PAINT WALLS IMPACTED BY RENOVATION TO MATCH EXISTING
CHAIN HOLD BACK AT WALL
EXISTING EXTERIOR ELEVATION
EXISTING LIGHT FIXTURE
EXISTING COILING DOOR W/ INTREGAL MAN DOOR
EXISTING SIGNAGE
EXISTING BRICK SOLDIER COURSE
EXISTING INTERIOR ELEVATION
EXISTING COILING DOOR W/ PEDESTRIAN PASS DOOR
RELOCATE ALL EXISTING UTILITIES AS REQUIRED
EXISTING INTERIOR ELEVATION
EXISTING STEEL BEAM
RELOCATE ALL EXISTING UTILITIES AS REQUIRED
EXTERIOR ELEVATION - DEMOLITION
EXTERIOR ELEVATION - PROPOSED
EXISTING BRICK SOLDIER COURSE
REMOVE AND DISPOSE OF BRICK
REMOVE AND DISPOSE OF COILING AND PEDESTRIAN PASS DOOR AND FRAME
COILING DOOR W/ PEDESTRIAN PASS DOOR
UTILITY BRICK INFILL (SIZE AND COLOR TO MATCH EXISTING)
REMOVE AND RELOCATE EXISTING LIGHT FIXTURE (SEE ELECTRICAL DRAWINGS)
REMOVE AND RELOCATE EXISTING SIGNAGE
EXISTING LIGHT FIXTURE RELOCATED
EXISTING SIGNAGE RELOCATED
CORNER GUARD (TYP. AT BOTH EXTERIOR JAMBS)
REMOVE RQUIRED AMOUNT OF BRICK IN ORDER TO REMOVE STEEL BEAM WITH-IN WALL (TYP. AT BOTH JAMBS)
UTILITY BRICK INFILL (SIZE AND COLOR TO MATCH EXISTING)
WEATHER STRIPPING
MOTORIZED OVERHEAD COILING DOOR
NEW UTILITY BRICK INFILL (SIZE TO MATCH EXIST., PAINTED TO MATCH EXIST.)
GALV. CONT. PL. "x11 " 38"x11 " 12" (LENGTH TO BE OPENING WIDTH - ")12")
14 2-12
GALV. W8x24 W/ 8" END BEARING EACH END
WEATHER STRIPPING
EXISTING UTILITY BRICK (PAINTED TO MATCH EXISTING)
JAMB STOP CHANNELS
1" FRAME IN
HOLLOW METAL DOOR
SECTION
3" = 1'-0"
4"x4"x1/4" STEEL ANGLES CORNER GUARDS (GALVANIZED AND PAINTED)
5/16" DIA. COUNTERSUNK EXPANSION ANCHORS @ 16"O.C. (STAGGERED) WITH A MIN 1-1/4" EMBEDMENT
STEEL BENT PLATE (PAINTED)
EXISTING CONCRETE SLAB TO REMAIN
OVERHEAD COILING DOOR AND TRACK
SECTION
3" = 1'-0"
4"x4"x1/4" STEEL ANGLES CORNER GUARDS (GALVANIZED AND PAINTED)
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
NORTH
FC
JMP
BOILER PLANT - PARTIAL PLAN
PARTIAL NORTH ELEVATION
(DEMOLITION AND RENOVATION)
Sheets and Views
17664-A1-Layout1
CHEMICAL ROOM
SEWAGE EJECTOR ROOM
PARTS STORAGE AREA
TOILET ROOM
LOCKER ROOM
TOOL CRIB
ELECTRIC ROOM
GENERATOR ROOM
OPERATORS BOOTH
STORAGE AREA AND PUMP ROOM
7.5
EXISTING BOILER #1 TO REMAIN
EXISTING BOILER #2 TO REMAIN
NEW BOILER #3
EXISTING CONTROL PANEL
EXISTING CONTROL PANEL
CONNECT FEEDER TO NEW BOILER CONTROL PANEL
NEW OIL PUMP MOTOR
NEW BLOWER MOTOR
NEW COMPRESSOR MOTOR
EXISTING PANEL "P-2"
EXISTING PANEL "P-1"
EXISTING PANEL "L-3"
EXISTING PANEL "L-1"
EXISTING PANEL "N-2"
EXISTING "LB" FITTING
EXISTING PADMOUNTED 225KVA TRANSFORMER; 13.8KV, 3W, 277/480V, 3 , 4WTO BE REMOVED
EXISTING PRIMARY FEED FROM BASE UTILITIES TO BE REMOVED
EXISTING UNDERGROUND ELECTRIC SERVICE TO BUILDING- ((4) 600KC MIL, TO BE REMOVED)
EXISTING BOILER #3; DISCONNECT ; DISCONNECT AND REMOVE ALL WIRING AND APPERTENANCES ASSOCIATED WITH EXISTING BOILER #3 BACK TO SOURCE
%%UEXISTING BFP-3
%%UEXISTING BFP-2
%%UEXISTING BFP-1
EXISTING CONDENSATE TANK
EXISTING CTP-1
EXISTING CTP-2
CO
ELECTRICAL CONTRACTOR TO WIRE NEW CO DETECTORS, PER MANUFACTURERS' WIRING DIAGRAM (TYPICAL FOR 3) SEE NOTE 7
NEW BOILER CONTROL PANEL BY DIV. 15
FM
EXISTING BOILER #3 CONTROL PANEL & MASTER CONTROL PANEL TO BE REPLACED BY DIV. 15
EXISTING MASTER CP
EXISTING CP-3
NEW FIRE-O-MATIC SWITCH; MOUNT OVER BURNER
EXISTING PANEL "N-1"
T-1
T-4
T-2
T-3
EXISTING PULL BOX #3
EXISTING MAIN SWITCHBOARD
N-1 38
SEE NOTE 6
O.H. DOOR PUSH-BUTTON STATION
N-1 23
SEE NOTE 1
SEE NOTE 5
SEE NOTE 2
SEE NOTE 3
SEE NOTE 4
EXISTING JUNCTION BOX #1 TO REMAIN
EXISTING PULL BOX #2 ON CEILING TO REMAIN
EXISTING FUEL OIL DUPLEX PUMP SET
EXISTING CP-2
EXISTING CP-1
SEE NOTE 8
EXISTING BOILER CONTROL PANEL TO REMAIN
EXISTING EQUIPMENT AND WIRING TO REMAIN
1.5
1.5
P-1 32
P-1 31
EXISTING FOP-1 TO REMAIN
EXISTING FOP-2 TO REMAIN
CP-3
NEW BOILER #3 CONTROL PANEL & MASTER CONTROL PANEL FURNISHED AND INSTALLED BY DIV. 15
FORCED DRAFT FAN STARTER TO BE REMOVED
30A/3P
REMOVE EXISTING 4#4/0, 1#4GND REWIRE WITH NEW 4#350KC MIL. 1#3GND
NEW 600A/3P, 600V "MAIN SERVICE DISCONNCT SWITCH"
TO NEW PULL BOX, FOR DETAILS SEE 22-E3
2 SETS-3"C-4#350KC MIL, 1#2GND
FREE STANDING JBOX TO REMAIN
(4) 4"C (2) ACTIVE (2) SPARE-STUB AND CAP 6" AFG
NEW 200A/3P 600V DISCONNECT SWITCH
2"C-3#1, 1#6GND
EXISTING FORCED DRAFT FAN- BOILER #3
SEE NOTE 9
VSD
REPLACE COMBINATION MOTOR STARTER FOR BFP-3 W/VARIABLE SPEED MOTOR STARTER (30 HP), CONTROLS & CONTROLS WIRING BY DIV. 15
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
22-E2
ELECTRICAL DEMOLITION AND NEW WORK PLAN
%%UNOTE:
1. FOR NOTES, LEGEND, ABBREVIATIONS, AND FOR NOTES, LEGEND, ABBREVIATIONS, AND SINGLE LINED DIAGRAM SEE DRAWING NO. 22-E1.
ELECTRICAL DEMOLITION AND NEW WORK PLAN SCALE: 1/4" = 1'-0"
%%UNOTES:
1. EXISTING EXIT LIGHTING FIXTURE TO BE REMOVED. REMOVE WIRING EXISTING EXIT LIGHTING FIXTURE TO BE REMOVED. REMOVE WIRING REMOVE WIRING BACK TO CLEAR NEW OVERHEAD DOOR; PROVIDE JUNCTION BOX AND EXTEND WIRING TO NEW EXIT LIGHTING FIXTURE MOUNTED ON WALL ABOVE NEW OVERHEAD DOOR AND ABOVE MANDOOR IN O.H. DOOR. 2. NEW EXIT LIGHTING FIXTURE; EMERGI-LITE #WW-SVXN-IRD-4X-D. NEW EXIT LIGHTING FIXTURE; EMERGI-LITE #WW-SVXN-IRD-4X-D. EXTEND NEW WIRING TO NEW JUNCTION BOX IN EXISTING CIRCUIT. 3. REMOVE EXISTING FIRE ALARM MANUAL PULL STATION. REMOVE REMOVE EXISTING FIRE ALARM MANUAL PULL STATION. REMOVE EXISTING WIRING BACK TO CLEAR NEW OVERHEAD DOOR; PROVIDE JUNCTION BOX AND EXTEND NEW WIRING TO NEW FIRE ALARM PULL STATION LOCATION ON LEFT OF NEW DOOR; CENTERLINE MOUNT AT 48" A.F.F. 4. REMOVE EXISTING GROUND TO WATER PIPING BACK TO SOURCE. REMOVE EXISTING GROUND TO WATER PIPING BACK TO SOURCE. PROVIDE NEW GROUND; 3/4"C-#3/0 STR. CU BACK TO GROUND BUS IN BUS IN EXISTING MAIN SWITCHBOARD. INSTALL SO AS TO CLEAR NEW NEW OVERHEAD DOOR. PROVIDE NEW BRONZE GROUND CONNECTOR AT AT WATER PIPE.
5. REMOVE EXISTING WIRING AND LIGHTING FIXTURE OVER EXISTING OVERHEAD DOOR. REMOVE EXISTING WIRING AND LIGHTING FIXTURE OVER EXISTING OVERHEAD DOOR. PROVIDE NEW FIXTURE; DAY-BRITE NITE BRITERS #WLM-175-M-PCR/PE-QEM, WITH 175 WATT METAL-HALIDE LAMP AND (1) 100 WATT QUARTZ LAMP. CENTER FIXTURE ABOVE NEW OVERHEAD DOOR. PROVIDE NEW WIRING 3/4"C-2 #12, 1 #12 GND. TO EXISTING PANEL "N-1" AND CONNECT TO CIRCUIT #23. 6. NEW OVERHEAD DOOR OPERATOR. PROVIDE NEW 30A/3P/250V DISCONNECT SWITCH NEW OVERHEAD DOOR OPERATOR. PROVIDE NEW 30A/3P/250V DISCONNECT SWITCH TO PANEL "N-1" WITH 3/4"C-3 #12, 1 #12 GND. REMOVE (3) 20A, 1-POLE CIRCUIT BREAKERS FROM PANEL "N-1" (#38, 40, 42). PROVIDE NEW 20A/3P CIRCUIT BREAKER IN THAT SPACE. DELIVER THE (3) 20A/1P CIRCUIT BREAKERS BACK TO OWNER. OVERHEAD DOOR PUSH-BUTTON STATION TO BE SUPPLIED WITH DOOR OPERATOR AND INSTALLED AND WIRED BY THE ELECTRICAL CONTRACTOR. 7. NEW "CO" MONITORS ARE TO BE FURNISHED AND INSTALLED BY THE MECHANICAL NEW "CO" MONITORS ARE TO BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR AND HARDWIRED BY THE ELECTRICAL CONTRACTOR. 8. BLOWER MOTOR FOR EXISTING BOILER #3; DISCONNECT AND REMOVE WIRING BACK TO BLOWER MOTOR FOR EXISTING BOILER #3; DISCONNECT AND REMOVE WIRING BACK TO SOURCE. 9. AFTER CUTOVER OF NEW SERVICE, REMOVE EXISTING 4"C-4#600KC MIL. AND AFTER CUTOVER OF NEW SERVICE, REMOVE EXISTING 4"C-4#600KC MIL. AND ASSOCIATED PULL BOXES (3) WITH FITTINGS FROM PULL BOX #1 THRU TO THE EXISTING MAIN SWITCHBOARD. THIS MUST BE ACCOMPLISHED TO INCREASE THE HEIGHT AT THE OVERHEAD DOOR AREA TO ALLOW DELIVERY OF THE NEW BOILER. 10. ALL BOILERS ARE SUPPLIED BY STANDBY POWER TO OPERATE AT THE SAME TIME. ALL BOILERS ARE SUPPLIED BY STANDBY POWER TO OPERATE AT THE SAME TIME.
Sheets and Views
17664FE02-Layout1
PIPING SYMBOLS INSTRUMENT/CONTROL SYMBOLS GENERAL NOTES:
EQUIPMENT TAGS
PIPING SYSTEMS
ABBREVIATIONS
CONVECTOR
CV
PRESSURE SENSOR, SWITCH
SMOKE DETECTOR
ENTHALPY SENSOR
PRESSURE GAUGE W/ SHUTOFF (LIQUID FILLED)
DIFFERENTAL PRESSURE SENSOR/ SWITCH
TEMPERATURE INDICATION (LIQUID TYPE W/ WELL)
HAND-OFF-AUTO SWITCH
ANGLE VALVE
MANUAL AIR VENT
M
TEMPERATURE SENSOR, THERMOSTAT
HAND SWITCH
MAKE-UP AIR UNIT
HEAT EXCHANGER
MAU
P
PUMP
HX
PUMPED CONDENSATE
PC
BOILER
VENT LINE
V
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE
MEDIUM PRESSURE STEAM
MEDIUM PRESSURE CONDENSATE
MPS
MPC
LPC
LPS
GAUGE LINE
FUEL OIL VENT
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE
HPC
HPS
FOV
CITY WATER, COLD WATER
DRAIN LINE
FUEL OIL SUPPLY
FUEL OIL RETURN
FOS
CW
BLOWDOWN
BOILER FEED WATER
CHEMICAL FEED
CF
BD
PRE-HEAT COIL
PHC
BP
BOILER PUMP
CUT AND CAP
C/C
ABOVE FINISHED FLOOR
APPROXIMATELY
AT
AUTOMATIC AIR VENT
AUTOMATIC CONTROL VALVE
ATMOSPHERE
AUXILIARY
BRITISH THERMAL UNITS PER HOUR
CLEANOUT
CONCRETE
CUBIC FEET PER MINUTE
DECIBEL, DRY BULB
DIFFERENTIAL PRESSURE SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
DOWN
DEMOLITION
ECCENTRIC
ENTERING AIR TEMPERATURE
EFFICIENCY
EXISTING TO REMAIN
ELEVATION
EXHAUST
ENTERING WATER TEMPERATURE
DEGREES FAHRENHEIT
FEET PER MINUTE
FOOT, FEET
GALLONS PER HOUR
HEATER
HERTZ
INDUCED DRAFT OR INSIDE DIAMETER
INCH, INCHES
ISOLATION
LEAVING AIR TEMPERATURE
LEAVING WATER TEMPERATURE
KILOWATTS
IN, "
LWT
LAT
KW
ISOL
CFM
AFF
APPROX
AAV
ID
HZ
HTR
GPH
FT, '
FPM
°F
EWT
EXH
ELEV
ETR
EFF
EAT
ECC
DEMO
DN
DPT
DPS
DB
CONC
BTUH or
AUX
ATM
ACV
DIA,
THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERALLY THE LOCATION OF MATERIALS AND EQUIPMENT. THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS, UNLESS OTHERWISE NOTED, TO HAVE A COMPLETE AND FUNCTIONING SYSTEM. "PROVIDE" SHALL MEAN TO FURNISH AND INSTALL.
ALL SERVICES THAT ARE INTERRUPTED OR DISCONNECTED SHALL BE REROUTED AND RECONNECTED IN ORDER TO PROVIDE A COMPLETE INSTALLATION.
THE WORK SHALL BE DONE IN ACCORDANCE WITH THE LOCAL BUILDING CODES, NFPA AND ALL OTHER APPLICABLE STATE AND FEDERAL CODES.
FINAL LOCATION OF EQUIPMENT AND CONNECTION POINTS SHALL BE DETERMINED IN THE FIELD WITH THE CONTRACTOR BEING RESPONSIBLE FOR DIMENSIONS THAT SHALL BE CONFIRMED AND CORRELATED AT THE JOB SITE.
INSTALL EQUIPMENT SO AS TO BE READILY ACCESSIBLE FOR OPERATION, MAINTENANCE, AND REPAIR. MINOR DEVIATIONS FROM THE DRAWINGS MAY BE MADE TO ACCOMPLISH THIS, BUT CHANGES WHICH INVOLVE EXTRA COST SHALL NOT BE MADE WITHOUT PRIOR APPROVAL OF THE OWNER OR CONSTRUCTION MANAGER.
FOR RENOVATION WORK, A CONTRACTOR'S SUBMISSION OF A BID SHALL BE CONSTRUED AS EVIDENCE THAT A CAREFUL EXAMINATION OF THE PORTIONS OF THE EXISTING BUILDING, EQUIPMENT, ETC., WHICH AFFECT THIS WORK AND THE ACCESS TO SUCH SPACES, HAS BEEN MADE AND THAT THE CONTRACTOR IS FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF THE WORK. LATER CLAIMS SHALL NOT BE MADE FOR ADDITIONAL LABOR, EQUIPMENT OR MATERIALS BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN DURING SUCH AN EXAMINATION.
THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS AND INSPECTIONS REQUIRED FOR THE EXECUTION OF THIS WORK AND SHALL OBTAIN NECESSARY APPROVALS FROM AUTHORITIES THAT HAVE JURISDICTION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CORING NEEDS FOR PASSAGE OF PIPING THROUGH SOLID CONCRETE WALLS, FLOORS OR FOUNDATION WALLS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR HANDLING, STORAGE, RIGGING AND SETTING OF ALL EQUIPMENT AND MATERIALS. CRANES, LIFTS, HOIST AND SCAFFOLDING OF ALL EQUIPMENT SHALL BE EMPLOYED AS REQUIRED TO COMPLETE THE INSTALLATION.
INFORMATION SHOWN ON FLOW DIAGRAMS AND DETAIL DRAWINGS BUT NOT SHOWN ON FLOOR PLANS, AND VICE VERSA, SHALL MUTUALLY APPLY. IT IS NOT INTENDED TO SHOW EVERY OFFSET, FITTING OR COMPONENT; HOWEVER, THE CONTRACTOR SHALL PROVIDE A COMPLETE INSTALLATION AS NECESSARY.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
DEMO OR NEW WORK-SHOWN DARK LINED (SEE NOTE 11)
EXISTING TO REMAIN WORK-SHOWN LIGHT LINED (SEE NOTE 12)
RISER UP
RISER DOWN
BRANCH-TOP CONNECTION
BRANCH-BOTTOM CONNECTION
TEE
UNION
FLANGE
CONCENTRIC REDUCER
ECCENTRIC REDUCER
PIPE ANCHOR
PIPE GUIDE
DIRECTION OF FLOW
DIRECTION OF DOWNWARD PITCH
CAP ON END OF PIPE
STRAINER
SUCTION DIFFUSER W/ STRAINER
FLEX HOSE
STEAM TRAP
AUTOMATIC AIR VENT
BALL VALVE
BUTTERFLY VALVE
BALANCING AND SHUT-OFF VALVE
CHECK VALVE (SILENT TYPE)
FLOW CONTROL VALVE (GRISWOLD DEVICE)
GATE VALVE
GLOBE VALVE
PLUG VALVE
DRAIN VALVE W/ HOSE CONNECTION
PRESSURE REDUCING VALVE (SELF CONTAINED)
SAFETY VALVE OR PRESSURE RELIEF
THREE-WAY CONTROL VALVE (ELECTRIC ACTUATOR)
TWO-WAY CONTROL VALVE (ELECTRIC ACTUATOR)
THREE-WAY CONTROL VALVE (PNEUMATIC ACTUATOR)
TWO-WAY CONTROL VALVE (PNEUMATIC ACTUATOR)
BACKFLOW PREVENTER (REDUCED PRESSURE TYPE)
AIR SEPARATOR
AS
ABANDON IN PLACE
AIP
AHU
AIR HANDLING UNIT
AF
AIR FILTRATION UNIT
DFW
DEAERATING FEEDWATER HEATER
DH
DEHUMIDIFIER
DP
DOMESTIC PUMP
FT
FLASH TANK
BHP
BRAKE HORSEPOWER, BOILLER HORSEPOWER
CAP
CAPACITY
EXPANSION
FLA
FULL LOAD AMPS
LRA
LOCKED ROTOR AMPS
AD
ACCESS DOOR
ADJ
ADJUSTABLE
APD
AIR PRESSURE DROP
AMP
AMPERE
AUTO
AUTOMATIC
BDD
BACK DRAFT DAMPER
BOP
BOTTOM OF PIPE
BLDG
BUILDING
CLG
CEILING
CL
CENTERLINE
CHP
CENTRAL HEATING PLANT
COL
COLUMN
CONT
CONTINUOUS
CI
CUBIC INCHES
DIM
DIMENSION
DWG
DRAWING
EA
EACH, EXHAUST AIR
ELEC
ELECTRIC
EMER
EMERGENCY
ENT
ENTERING
EQUIP
EQUIPMENT
EXP JT
EXPANSION JOINT
F&T
FLOAT AND THERMOSTATIC
FD
FIRE DAMPER
FDR
FLOOR DRAIN
FIG
FIGURE
FIN
FINISH
FL, FLR
FLOOR
FO
FUEL OIL
GALV
GALVANIZED
GAL
GALLONS
GA
GAUGE
GND
GROUND
GPM
GALLONS PER MINUTE
HD
HEAD
H, HT
HEIGHT
HP
HORSEPOWER
INSUL
INSULATION
INT
INTERIOR
KVAR
KILOVOLT AMPERE REACTIVE
MATL
MATERIAL
WATER PRESSURE DROP
TOTAL DYNAMIC HEAD
TOTAL STATIC PRESSURE
MAXIMUM OVERCURRENT PROTECTION
MINIMUM CIRCUIT AMPACITY
SUPPLY AIR TEMPERATURE
TEMPERATURE DIFFERENCE
REVOLUTIONS PER MINUTE
PRESSURE REDUCING VALVE
RESISTANCE TEMPERATURE DETECTOR
POINT OF CONNECTION
PRESSURE DROP, PUMP DISCHARGE
THOUSAND BRITISH THERMAL UNITS PER HOUR
WATER GAUGE
WG
WPD
TDH
TSP
SUPPLY AIR
SA
STATIC PRESSURE
SP
SENSIBLE
SENS
RUNNING LOAD AMPS
RLA
QUANTITY
QTY
PSIG
PSIA
OUTSIDE AIR
OA
MOP
MCA
MOTOR
MTR
MANUFACTURER
MFGR
MR
MECHANICAL ROOM
SPECIFICATION
SPEC
SAT
NOM
POC
LBS/HR
PRESS
RTD
PRV
RH
RPM
SQ
SQ FT
ST
TEMP
TD
TYP
V
WB
MAX
MBH
MIN
NC
NIC
NO
No.
PD
PH
LBS
WITHOUT
WITH
WET BULB
VOLTS
TYPICAL
TEMPERATURE
SQUARE FOOT
SQUARE
RELATIVE HUMIDITY
PRESSURE
POUNDS PER HOUR
POUNDS
PHASE
NUMBER
NORMALLY OPEN
NOMINAL
NOT IN CONTRACT
NORMALLY CLOSED
MINIMUM
MAXIMUM
MCC
MOTOR CONTROL CENTER
MTD
MOUNTED
MOUNTING
MTG
NTS
NOT TO SCALE
OD
OUTSIDE DIAMETER
OZ
OUNCE
PRESSURE DIFFERENTIAL
SCFM
STANDARD CUBIC FEET PER MINUTE
SCHD
SCHEDULE
SS
STAINLESS STEEL
STD
STANDARD
STL
STEEL
TCP
TEMPERATURE CONTROL PANEL
THEMOSTAT
UG
UNDERGROUND
UNDERWRITERS LABORATORY
UL
VAC
VOLTS ALTERNATING CURRENT
WATER, WATTS, WIDTH
W
WT
WEIGHT
90° ELBOW
PRESSURE REDUCING VALVE
PRV
SC
STEAM COIL
ST
AIR FLOW MEASURING STATION
ARMS
WATER SOFTENER
ELECTRIC CONTROL/ SIGNAL CIRCUIT
ANALOG INPUT
ANALOG OUTPUT
FLOW SENSOR, SWITCH
AIR FLOW MEASURING STATION
VARIABLE FREQUENCY DRIVE
DISCRETE OUTPUT
DISCRETE INPUT
PREUMATIC CONTROL/ SIGNAL TUBING
DI
DO
AI
AO
VFD
FOR
WS
BTU/HR
DIAMETER
EXIST
EXISTING
POUNDS PER SQUARE INCH (ABSOLUTE)
POUNDS PER SQUARE INCH (GAGE)
HOA
PI
TI
DP
SD
DHW
DOMESTIC HOT WATER
EXP
EXT
EXTERIOR
GENERAL CONTRACTOR
GC
L
LENGTH
LF
LINEAR FEET
ARCH
ARCHITECTURAL
T ' STAT
W/
W/O
MECH
MECHANICAL
PLUMB
PLUMBING
RM
ROOM
VOL
VOLUME
VTR
VENT THRU ROOF
VAR
VARIABLE
ALUM
ALUMINUM
ON DEMOLITION DRAWINGS, ALL DARK LINED OBJECTS ARE TO BE REMOVED UNLESS NOTED OTHERWISE. ON NEW WORK DRAWINGS, ALL DARK LINED OBJECTS ARE NEW, UNLESS NOTED OTHERWISE.
11.
ON BOTH DEMOLITION DRAWINGS, AND NEW WORK DRAWINGS, OBJECTS SHOWN LIGHT LINED ARE EXISTING TO REMAIN UNLESS NOTED OTHERWISE.
12.
ABV
ABOVE
BF
CONTINUOUS BLOWDOWN
CBD
SH
SPRING HANGER
ALL GAUGES AND INDICATORS SHALL BE CLEARLY VISIBLE FROM PERSONNEL STANDING ON THE FLOOR OR ON PERMANENT PLATFORMS.
13.
ALL NEW PIPING SHALL BE TAGGED AND IDENTIFIED PER V.A. REQUIREMENTS.
14.
22-G1
MECHANICAL LEGEND, ABBREVIATIONS, AND SYMBOLS
JK
DD
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
Sheets and Views
17664-G1-Work
EXISTING EMH-1
EXISTING SECONDARY
EXISTING PADMOUNTED TRANSFORMER 225 KVA PM8120-0050
EXISTING U/G PRIMARY DUCT BANK
EXISTING FIRE HYDRANT
EXISTING LIGHT POLE
PROVIDE NEW PADMOUNTED TRANSFORMER 500 KVA (7'x7'x1' THICK SLAB) DETAILS THIS DWG. 22-E3
EXISTING GAS PIPING FENCE ENCLOSURE
FOR CONTINUATION SEE DWG. 22-E2
NOTE: SEE DUCT BANK ELEVATION THIS DWG.
EXISTING ELBOW ENTER BUILDING
NEW PULLBOX SEE DETAIL THIS DRAWING
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
22-E3
ELECTRICAL PARTIAL SITE PLAN, AND SITE DETAILS
%%URESTORATION/DUCTBANK DETAIL
ALL DIMENSIONS ARE MINIMUM
REQUIREMENTS.
3"
A-A
%%UCONCRETE ENCASED DUCT BANK DETAIL
C-C
ACTIVE PRIMARY-4"PVC WITH (3) 1/c #4/0, 15KV SHIELDED JACKETED CABLE IN CONCRETE ENVELOPE. TOP OF DUCT ENCASEMENT TO BE 24" MINIMUM BELOW GRADE
PREFORMED SPACERS 6'-0" O.C. ALONG ENTIRE LENGTH OF DUCT BANK
UNDISTURBED SOIL OR COMPACTED FILL BELOW ENTIRE LENGTH OF DUCT BANK
SPARE (PRIMARY) 4"PVC
UNDISTURBED EXISTING PAVEMENT
AC WEARING COURSE
SAW CUT
AC BINDER COURSE
6" MIN
PERMANENT PAVEMENT
TRENCH WIDTH
12"
24" MIN.
FINE SELECTED BACKFILL
4"PVC-(4) 350KC MIL (CU), (1) #2 GND. IN CONCRETE ENVELOPE. TOP OF ENVELOPE 24" MINIMUM BELOW GRADE
SPARE 4"PVC CONDUIT
1. ALL WORK SHALL BE APPROVED BY THE RESIDENT ENGINEER PRIOR TO POURING
2. DUCTS SHOULD NOT EXTEND MORE THAN 1" ABOVE THE TOP OF THE FOUNDATION.
PROVIDE GROUNDING BUSHING ON EACH DUCT, WITH 1/C #2 GROUNDING WHIP
4. GROUND AND SAND - GRAVEL SHALL BE COMPACTED AND THE SAND SHALL BE
TO GROUND GRID.
3. CONCRETE TO BE 3000#.
WETTED JUST BEFORE POURING THE CONCRETE.
PRIMARY DUCTS
10"
4"
SECONDARY DUCTS
24"
8"
%%UFRONT
%%UPLAN
84"
PRIMARY DUCTS
3/4" CHAMFER ON OUTSIDE EDGES
2" SAND
2"
25"
13"
15"
61"
84"
CONCRETE.
GROUND ROD - TYP. FOR 4 ( "x10' COPPERWELD)34"x10' COPPERWELD)
CONCRETE ENCASEMENT (TYP.)
4" R.G.S. ELBOWS PVC COATED 36" RADIUS
PVC TO RIGID ADAPTOR
SECONDARY CONDUITS TO BUILDING (4)
12" GRAVEL
GROUND WIRE # (CU)10 (CU)
FINISHED GRADE
REINFORCING SHALL STOP 3" FROM SIDES AND OPENINGS
EXOTHERMICALLY WELED CONNETION (TYPICAL)
3/4" x 10' LONGCOPPERWELD GROUND ROD (TYP. FOR 4)
COILED SLACK FOR CONNECTION TO TRANSFORMER GROUND LUGS (TYPICAL)
# 7-STRAND BARE 10 7-STRAND BARE COPPER GROUND 12" MIN. BELOW GRADE (TYPICAL)
%%UCONCRETE ENCASED DUCT BANK DETAIL
B-B
4"PVC-(4) 350KC MIL (CU), (1) #2 GND. IN CONCRETE ENVELOPE. TOP OF ENVELOPE 24" MINIMUM BELOW GRADE
SPARE 4"PVC CONDUIT
FINISHED GRADE, LOAM AND SEED ALL UNPAVED AREAS DISTURBED BY CONSTRUCTION
WARNING TAPE
%%UPARTIAL ELECTRICAL SITE PLAN
SCALE: 1'-0"=20'
REINFORCING TO BE #4 GRADE 60 BARS PER ASTM A.615, LOCATE IN CENTER OF SLAB, MIN. 2" CLEARANCE FROM FACE OF CONCRETE.
SEE NOTE 2 (TYPICAL)
TRANSFORMER PAD DETAILS
NOTES:
ELEVATION
%%UPARTIAL DUCTBANK ELEVATION
5' APPROX.
6' APPROX.
13' APPROX.
CURB
PAVEMENT
FINISHED GRADE
CONCRETE TRANSFORMER PAD (7'x7'x1' THICK)
PAVEMENT
CONCRETE DUCT BANK
CONCRETE DUCT BANK
EXISTING STONE RETAINING WALL WITH CONCRETE CAP
NEW 36"x36"x24 DP NEMA 4X PULL BOX
FLOOR SLAB
NEW "MAIN SERVICE DISCONNECT SWITCH" SEE DWG. 22-E2
STANDBY GENERATOR ROOM
TO EXISTING ELECTRIC MANHOLE "EMH1"
%%UPAVEMENT SLAB RESTORATION/DUCTBANK DETAIL
FINE SELECTED
BACKFILL
6" COMPACTED
GRAVEL
TRENCH WIDTH
PERMANENT PAVEMENT
24" MINIMUM
AC WEARING COURSE
AC BINDER COURSE
D-D
ACTIVE PRIMARY-4"PVC WITH (3) 1/c #4/0, 15KV SHIELDED JACKETED CABLE IN CONCRETE ENVELOPE. TOP OF DUCT ENCASEMENT TO BE 24" MINIMUM BELOW GRADE
SPARE (PRIMARY) 4"PVC
FINISHED GRADE, LOAM AND SEED ALL UNPAVED AREAS DISTURBED BY CONSTRUCTION
MIN. 6" COMPACTED GRAVEL BEDDING
Sheets and Views
17664FE03-Layout1
CP-2
CP-1
BOILER #2
BOILER #1
BFP-1
BFP-2
CTP-1
CTP-2
EXISTING CONDENSATE TANK
2 " FOS12" FOS
FUEL OIL DUPLEX PUMP SET
BDT-1
SOFTENER 1
BRINE TANK
FILTER #1
FILTER #2
FOP-1
FOP-2
SOFTENER 2
SOFTENER 3
CONCRETE PAD
FUNNEL DRAIN WITH 3/4" UP TO SAFETY VALVE DRAINS (TYP FOR 2)
3/4" HEADER DRAIN
3/4" STRAINER BLOWDOWN FROM D.A. TANK P.R.V.
3/4" NON-RETURN VALVE DRAIN (TYP FOR 2)
FUNNEL DRAIN FOR LWCO BLOWDOWN DRAINS (TYP FOR 6)
6"
2 1/2"
2" FOS/FOR UP
1 1/2"
3/4"
NEW BOILERFEED PUMP, BFP-3.
3/4" NON-RETURN VALVE DRAIN
2" BD CONN.
2" BD CONN.
TANDEM BOTTOM BLOW-OFF VALVE (TYPICAL)
1"
NEW MASTER/CP-3 CONTROL PANEL.
NEW 2 1/2" BF UP
G2 G4
N.C.
N.O.
NEW GATE VALVE IN BY-PASS
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
22-G2
JD
RD
BOILER ROOM
LOWER PIPING PLAN
%%UBOILER ROOM - LOWER PIPING PLAN
SCALE: 1/4"=1'-0"
Sheets and Views
17664-G2-Layout1
%%UNEW BOILER NO. 3
FLOOR
5'-0"
2'-0"
72'-0"
EXISTING CATWALK
GRADE
48" I.D. FLUE WITHIN 58"O.D. STACK.
10'-5"
EXIST. HPS HEADER
DRAIN
34" EXIT DIAMETER
12'-0"
CENTER LINE
40"I.D.
40"I.D.
ALL FASTENERS 4'-0" ON CENTER MINIMUM. FASTENING TO STACK SHALL BE COORDINATED WITH AND APPROVED BY STACK MANUFACTURER
COPPER 20 STRAND #14 CONDUCTOR DOWN LEAD (TWO SIDES AND RING CONNECTING TERMINALS)
3/4"x10' COPPER CLAD GROUND ROD (TYP. 2)
LIGHTNING PROTECTION AIR TERMINAL 5/8" DIAMETER SOLID COPPER LEAD COATED (TYP. 2)
2'-0" MIN. TO TOP OF ROD
3/4" RIGID STEEL CONDUIT FROM 6" AFG TO GROUND ROD (TYP. 2)
CONNECT BOTH GROUND RODS TO EXISTING GROUND LOOP
UPPER 25'. ALL COMPONENTS LEAD COVERING MIN. 1/16" THICK
COPPER 20 STRAND #14 LEAD COVERED CONDUCTOR RING LOOP AROUND STACK CONNECTED TO BOTH TERMINALS
EXOTHERMIC WELD TYPICAL UNDERGROUND
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
22-G9
ELEVATION AT BOILER No. 3
1. FOR NOTES, LEGEND, ABBREVIATIONS, AND FOR NOTES, LEGEND, ABBREVIATIONS, AND SINGLE LINED DIAGRAM SEE DRAWING NO. 22-E1.
ELEVATION AT BOILER No. 3 SCALE: 1/4" = 1'-0"
Sheets and Views
17664FE04-E4
B22 Pipe & Catwalk (12465+12467).pdf
B22 New Catwalk (12466+12468).pdf
OFFICE
1" FOS/FOR
6" HPS
6" HPS
1" HPR
1 1/2" HPR
1" HPR
1 1/2" HPR TO DA TANK
2" FOS/FOR FROM BELOW
4" HPS TO LAUNDRY
%%UNEW
%%UBOILER #3
%%UEXIST.
%%UBOILER #2
%%UBOILER #1
%%UNEW
%%UECONOMIZER #3
%%UECONOMIZER #2
%%UECONOMIZER #1
NEW 6" HPS
NEW 1" HPR
NEW 1 1/2" HPR
NEW 2 1/2" BF
NEW 1" FOS/FOR. CONNECT TO BOILER
NEW 3/4" CF. CONNECT TO BOILER.
NEW 2 1/2" BF FROM BELOW
PROVIDE NEW BACKPRESSURE VALVE TO REPLACE EXIST. BACKPRESSURE VALVE
GATE VALVE IN VERTICAL
NON-RETURN VALVE
NEW STEAM METER
LOCATE NEW 2 1/2" BOILER FEEDWATER PIPE TO MAINTAIN CLEAR ACCESS AT EXIST. BOILERS #1 & #2 AND AT NEW BOILER #3.
PROVIDE ADJUSTABLE HANGER THIS LOCATION. HANGER SHALL BE PROVIDED WITH LOADING INFORMATION, DEFLECTION INDICATOR AND COMPRESSION RING KAPPA RATING.
PROVIDE VENT UP THRU ROOF
DEPARTMENT OF VETERANS AFFAIRS EDITH NOURSE ROGERS MEMORIAL VETERANS HOSPITAL REPLACE BOILER - BUILDING 22
22-G3
JD
DD
BOILER ROOM
UPPER PIPING PLAN
%%UBOILER ROOM - UPPER PIPING PLAN
SCALE: 1/4"=1'-0"
Sheets and Views
17664-G3-Layout1
OL106310 WD.pdf
OL106310 DD.pdf
OL106310 DD 1.pdf
%%UEXISTING GAS PRESSURE
%%UREDUCING STATION AND METER
EXIST. 2" PILOT GAS
EXISTING VENTS TO ATMOSPHERE
EXISTING GAS TRAIN
EXISTING GAS TRAIN
NEW GAS TRAIN
RUN THREE NEW 1" VENTS & ONE NEW 1 1/2" VENT UP THRU EXTERIOR WALL ABOVE. PROVIDE INDIVIDUAL SLEEVES FOR EACH PENETRATION. OFFSET AROUND GUTTER WITH SCREENED RETURN BEND. PAINT PIPING YELLOW. (PORTIONS OF EXISTING VENT PIPING MAY BE RE-USED BY CONTRACTOR SUBJECT TO APPROVAL OF OWNER'S REPRESENTATIVE)
REMOVE EXIST. GAS PIPING DOWNSTREAM OF CUT-POINTS AND PROVIDE NEW GAS PIPING AS INDICATED.
EXISTING PROPANE TANKS
EXIST. PROPANE
NEW PROPANE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .