This document is a modification to a previous sources sought notice for architectural and engineering design services. The Bedford VA Medical Center is seeking qualifications from SDVOSB firms to provide design services for project number 518-21-110 to replace and upgrade its steam distribution system. The scope of work involves reviewing the existing energy distribution system, conducting an energy efficiency audit, proposing at least two alternative upgrade scenarios with construction drawings and cost estimates, and completing the design within 250 calendar days of notice to proceed. Interested firms must provide qualifications including relevant experience, past performance, staff competency, and confirmation that the work will be over 50% performed by the prime SDVOSB by November 9th, 2022. The evaluation criteria and two-stage selection process are described. Twenty-five attachments provide background information on the existing facilities.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modification to a Previous Notice Modification to a Previous Notice
| SUBJECT* |
| 518-21-110 Steam Replacement and Distribution |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 04330 |
| SOLICITATION NUMBER* |
| 36C24122Q0614 |
BASE NOTICE TYPE
| RESPONSE DATE/TIME/ZONE |
| 11-09-2022 4:00pm EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| C1DA |
| NAICS CODE* |
| 541330 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office 1 (NCO 1) Contracting Officer (90C) 718 Smyth Road Augusta ME 04330
POINT OF CONTACT*
Contract Specialist Sary Nhet sary.nhet@va.gov Email only please
PLACE OF PERFORMANCE
| ADDRESS |
| Bedford VAMC |
200 Springs Road
Bedford MA
| POSTAL CODE |
| 01730 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
| AGENCY’S URL |
| https://www.va.gov/bedford-health-care/ |
| URL DESCRIPTION |
| VA Bedford health care |
| AGENCY CONTACT’S EMAIL ADDRESS |
| sary.nhet@va.gov |
EMAIL DESCRIPTION
DESCRIPTION
This amendment is to remove the location restriction to the Sources Sought Notice, extend the deadline for SF330 and correct the Period of Performance. The location restriction have been removed from the qualification requirement. The new deadline for the SF330 will be November 9, 2022 at 4:00pm ET. The Period of Performance have been corrected in the Source Sought Notice to agree with the Scope of Work. The Period of Performance is 250 Calendar days for Type A and B Services.
SOURCES SOUGHT:
The Bedford VA Medical Center located at 200 Springs Road in Bedford, MA has a requirement for a Firm Fixed Price contract to provide professional Architect/Engineer (A/E) Design for Project Number 518-21-110 Steam Replacement and Distribution. This is Phase 1 of a schedule 2 Phase Process to ultimately build a new steam, condensate, and HVAC systems (hereafter referred to as Energy Distributions System or EDS) contiguous to the existing EDS with the intent to be able to continue operation of the current system up until the new EDS can be brought online sequentially one building at a time without having significant disruption to any of the existing buildings as it relates to their heat, hot water, air conditioning, or ventilation. Phase 1 consist of 4 parts:
1. Perform a through review of the existing EDS to ensure they meet all applicable standards and specifications.
2. Perform a detailed overall energy and efficiency audit of the entire EDS currently in operation at the facility. This will be used as a baseline for future scenarios that might prove beneficial to the facility.
3. Proposes several alternative future energy scenarios (minimum of 2) that will deliver an energy efficient, cost effective, environmentally conscious, and state of the art energy facility.
4. Complete a detailed construction drawings and cost estimates for the future EDS scenarios that the vendor has envisioned in step #3. These scenarios will be presented to the project team at the VA Hospital.
The expectation of this Phase is to choose a scenario that will be the definitive EDS Project that will be proceed to Phase 2 for a detailed Design/Build process.
1. SCOPE:
The scope of this project consists of Architectural and Engineer (A/E) services required to complete the project.
The period of performance (type A and B services) is 250 calendar days, beginning with the issuance of the Notice to Proceed (NTP) by the Contracting Officer to the acceptance of 95% Construction Document.
The Magnitude of Construction is between $2,000,000 to $5,000,000.
The VA will not be responsible for any costs incurred by interested parties in responding to this announcement.
This is a Request for Qualifications:
The purpose of this notice is to request SF-330 Qualification statements from qualified SDVOSBs that have the experience directed at the requirements of the Statement of work.
The design effort is to be completed by more than 50% SDVOSB.
The NAICS code is 541330 and the small business size standard is $22.5 million.
Firms must have valid registration in the System for Award Management (SAM). Visit: SAM.gov to register in this database. SDVOSB firms must be verified in VETBIZ under NAICS 541330. Visit: vip.vetbiz.va.gov
RESPONSE:
Interested SDVOSB firms must provide their qualifications to the Contracting Specialist no later than 4:00pm on 11/9/2022 via email to Sary.Nhet@va.gov
The following information is required as a valid response:
1. A positive statement of your intention to submit a proposal in response to a solicitation for this project and include your firm’s UEI Number, Firms address and Contact information.
1. Evidence of your experience in A/E Services for complete design and construction of a project similar to this one, preferably with the VA and/or Medical facility (please provide contract descriptions, contract dollar amounts and telephone numbers for points of contact – no photographs).
1. Qualifications (Adjectival Evaluation Factors):
1. Facility Energy Efficiency Design and/or Energy Distribution System Design (minimum 3 projects in 10 years)
1. Past Performance (minimum no more than 1 marginal noting in CPARS in the last 3 years)
1. Competency of staff in disciplines (civil engineering projects, minimum of 3 medium [> 2M+/- construction budget] experience in last 10 years)
1. SF-330 Architect- Engineer Qualifications completed for the intent of the project.
1. Evidence that your SDVOSB firm will perform more than 50% of the requirement with a qualified SDVOSB and or VOSB team.
Failure to submit all information requested will result in a contractor not being considered as an interested SDVOSB concern.
EVALUATION FACTORS:
| Adjectival |
| Description |
| Exceptional |
| A comprehensive and thorough presentation of extraordinary |
merit with one or more significant strengths. Offeror’s response is clearly superior. The response is innovative and exceeds requirements. No deficiency or significant weaknesses exists.
| Good |
| Exceeds all the minimum requirements of the criteria; has an above average probability of success; contains no significant weaknesses and only minor, correctable weaknesses exist. |
| Acceptable |
| Meets all the minimum requirements of the criteria; has an average probability of success; no significant weaknesses and any deficiencies can be readily corrected. |
| Marginal |
| Fails to meet one or more of the minimum requirements of the criteria; low probability of success; major weaknesses and/or significant number of deficiencies exist. |
| Unacceptable |
| Fails to meet any of the minimum requirements of the criteria; very low probability of success. |
Neutral (Applies only to Past Performance) Offeror’s performance record, relevant past performance or information on past performance is not available
SELECTION PROCESS:
The A/E selection will be completed in two stages as follows: In Stage I, interested firms will submit SF-330 Qualification Statements of Capabilities. In Stage II, the A/E team most qualified will be requested to submit a price proposal for negotiations in an issued Request for Proposal.
PROJECT INFORMATION ATTACHMENT:
· Attachment 1 - Project Design Schedule (to be developed)
· Attachment 2 - Survey & Web-Geographic Information Services. Project Number 518-12-04, Drawings 1-14, May 17, 2013.
· Attachment 3 - Facility Master Plan, pages 1-48 for existing facility overview, dated 12/31/2012, by HAI Architecture
· Attachment 4 - Steam Distribution Drawings: (1) Original Steam Distribution Layout. Drawings 1-13, Dated 1/15/1927. (for reference only). (2) Steam Distribution Alterations to Bldgs #2 & 22. Project Number 20-5220, Drawings 1-13, dated 11/26/1958. (3) Replacement Steam Distribution Project Phase II, Project Number 518-81-140, 11 Drawings 1-11, dated 12/7/1990.
· Attachment 5 - Upgrade Steam Distribution System Phase I, Project Number 518-96-110, Drawings 1-36, dated 11/30/1998.
· Attachment 6 - Upgrade Steam Distribution System Phase II, Project Number 518-96-110, Drawings 1-28, dated 11/30/1998.
· Attachment 7 - VA-Upgrade Steam Distribution Phase III, Project 518-07801-ES, Drawings 1-15, dated 12-04-2009.
· Attachment 8 - Alterations to Buildings #2, 4, & 22 and Steam Distribution, Project Number 20-5220, Drawings 1-20, dated 11/26/1958.
· Attachment 9 - Repair Stacks & Steam Lines - Project Number W912DR-09-D-D-0014, Drawings 1-20, dated 08/18/2009
· Attachment 10 - Standard Plumbing Sheets, Drawings 1-12, dated 11/10/2013-07/13/1945.
· Attachment 11 - Steam Condensate Return System, Project Number 518-80-215, Drawings 1-8, dated 6/15/1987.
· Attachment 12 - Electrical Panel and Feeder Diagrams for Facility: (1) Updated High Voltage Electrical One-Line Schematic Diagrams, Project Number 2523-102, drawings E701-E706, dated 6/21/2017. (2) Electrical Distribution System Upgrades, Project Number 518-13-104, drawings 1-36, dated 2/16/2018.
· Attachment 13 - Boiler #3 Replacement: (1) Replace Boiler #3 - Bldg #22, Project # 518-04-106, Drawings 1-11, dated 4/21/2006. (2) Boiler #3 Replacement Project Pipe Connections As-Built Drawings - Dillon Boiler Services, Drawings 12465-12468, dated 11/03/2010
· Attachment 14 - Replace Blrs #1 & #2 – Project Number 518-96-101, Drawings 1-25, dated original construction 07/30/97 and as-built drawings 08/17/1997
· Attachment 15 - Boiler Plant Safety Improvements Bldg #22. Project Number 518-10-102, Drawings 1-11, dated 7/16/2010.
· Attachment 16 - Steam, Heating Hot Water, and Outside Distribution Systems Design Manual, September 2016, Volume 1 – Steam Boilers.
· Attachment 17 - Boiler Plant Piping System Specifications, Section 23.21.11, dated 02/01/2020. Subset of Design Manuals (PG-18-10); HVAC Design Manual for New, Replacement, Addition and Renovation of Existing VA Facilities: Department of Veterans Affairs, Office of Construction and Facilities Management.
· Attachment 18 - Outside Steam, Heating Hot Water, and Distribution Design Manual, November 1, 2020.
· Attachment 19 - Steam and Condensate Heating and Piping Specification, Section 23.22.13, dated 02/01/2020.
· Attachment 20 - Steam condensate pumps for Heating, Ventilating & Air Conditioning Specification, Section 23.22.23, dated 04/01/2020
· Attachment 21 - Boiler Plant Mechanical Equipment Specification, Section 23.50.11, dated 04/01/2020
· Attachment 22 - Steam Energy Distribution Specification, Section 33.63.00, dated 09/01/17
· Attachment 23 - HVAC Design Manual, originally written 11/01/2017, revised 03/01/2020.
· Attachment 24 - Model CBLE Cleaver Brooks 125-800 Hp Package Boiler O&M Manual, Revision 02/2013
· Attachment 25 - VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021
| *= Required Field |
| Modification to a Previous Notice |
Modification to a Previous Notice