What would we be required to hook the generator up to and will there be existing wires already installed out to the pad that the generator is to sit on or is the contractor required to run necessary wiring and conduit from the generator to the facility?
Answer: Field testing is to be accomplished via a portable load bank. The Contractor will be responsible for furnishing all required materials (the load bank, all required cabling, etc.) and labor associated with field testing.