Attachment_1-_Supply_Requirement.pdf
PDF 74 KB Posted
- Attached to
- Diesel Trailer, Alligator River NWR, NC
- Solicitation number
- 140FS323Q0221
About this file
This document outlines the requirements for a diesel trailer to be delivered to the Alligator River National Wildlife Refuge. The refuge requires a trailer capable of hauling and storing at least 690 gallons of diesel fuel. The trailer must be transportable without hazardous materials certification and include a manual side crank jack and 35-foot fuel reel. The related federal contract opportunity, solicitation number 140FS323Q0221, is seeking offers for the supply of this diesel trailer to the Alligator River NWR in North Carolina. Delivery must be made to either the Alligator River Maintenance facility or the Alligator River NWR headquarters by December 31, 2023. The soliciting agency is the U.S. Fish and Wildlife Service within the Department of the Interior.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_2-_Quote_Schedule.docx | DOCX document | |
| Sol_140FS323Q0221.pdf | ||
| Attachment_3-_Past_Performance_Data.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply Requirement
Alligator River/Pea Island National Wildlife Refuge Diesel Trailer
Trailer and Pump:
Trailer capable of hauling and storing Diesel fuel Can be transported without HazMat Certification Minimum 690 Gallon storage capacity Fuel Pump Required Manual Side Crank Jack 35' Fuel Reel Delivered
Delivery Addresses:
Alligator River Maintenance (preferred)- recommended for larger trucks 13158 Milltail Road East Lake, NC 27954 or Alligator River NWR 100 Conservation Way Manteo, NC 27954
Delivery Date:
on or before December 31, 2023