Attachment_1_Statement_of_Work.pdf

PDF 279 KB Posted

Attached to
Plumbing Service - Install Touchless Fixture Sherm Federal contract opportunity
Solicitation number
140A2322Q0436
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

View the file

Other files for this federal contract opportunity

Other files attached to Plumbing Service - Install Touchless Fixture Sherm, newest first.
File Type Posted
Sol_140A2322Q0436_Amd_0001.pdf PDF
Attachment_2_SCA_Wage_Determination.pdf PDF
Sol_140A2322Q0436.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PLUMBING SERVICES

BUREAU OF INDIAN AFFAIRS

SHERMAN INDIAN HIGH SCHOOL

Scope: The contractor shall provide plumbing services at Sherman Indian High School (SIHS), 9010

Magnolia Avenue, Riverside, Riverside County, California. SIHS is a U.S. Department of Interior, Bureau of Indian Affairs/Bureau of Indian Education (BIE) boarding school servicing Native American Indian &

Alaska Native (AI/AN) students in grades 9-12.

Purpose: The contractor will be hired to perform plumbing services, including inspection, diagnosis, installation, and repairs. Repairs will consist of pipes, valves, fittings, drainage systems, and fixtures

(faucets, water fountains, touchless). In addition, light construction, such as painting, plastering, and cosmetic repairs, were needed due to services.

The contractor shall meet all appropriate plumbing licenses to perform work. And will have a thorough knowledge of building codes, safety regulations, and safety practices.

Location: Sherman Indian High School Campus-wide.

Description of Service: The contractor shall furnish all technical, supervisory, and administrative personnel to ensure the expeditious accomplishment of the work. Additionally, the contractor shall provide all necessary services, labor, supplies, materials, equipment, investigations, studies, travel, and all cost associated with this project.

The school will provide, new toilets, new touchless water fountains, new touchless faucets, new flush value closets, and new flush valve urinals.

The project locations will consist of the following.

Building #60 Room Description

Mens Staff Restroom 161 Install touchless Urinals

Touchless Water Fountains Turn the faucet feature off

Janitor Room 164 No water pressure & hot water. Change out mob tub.

Bathroom 162 Install touchless sink faucet and two toilets

Boys Bathroom 108

Patch hole in the toilet stall. Install 7 touchless urinals. Facing the stalls first stall on the right doesn't flush well. The urinals need water checked and plumbing lines.

Restroom 119A Toilet not flushing well.

Restroom - Men 119 D Toilet flooding.

Restroom - Women 119 E Toilet flooding and sink don't drain. Completely out of service

Janitor Breakroom 131 No hot water.

Culinary classroom 102 The single sink faucet needs to be changed out. The three-compartment sink needs the faucet changed out. We have the parts.

Womens Restroom 165 Three stalls are out of service. Right side #1, Right side #4, and Left side #6.

Fine Arts Building #76

Janitor Room - Fine Arts by ITC room 117 No hot water or water coming out.

Men Restroom 116 Does not flush all the time.

Womens Restroom 114 Does not flush all the time.

Art room 301A No hot water - two sinks. One sink is leaking.

Touchless Water Fountain Corridor 101 A Install a touchless water fountain

Auditorium Building #77

Auditorium On the main floor install, four touchless water fountains

Auditorium - Womens Dressing Rooms Install touchless toilets.

Auditorium - Mens Dressing Rooms Install touchless toilets.

Auditorium 2nd Floor Install touchless water fountains.

Auditorium 3rd Floor Install touchless water fountains.

Gymnasium Building #66

Gym Lobby - Girls 102 Check plumbing stalls 2,4, & 6. Right side - stalls 2, 4, & 5.

Gym Lobby - Boys 106 Install eight touchless urinals.

Gym Janitor Room 103 No water pressure and hot water.

Gymnasium 105 Two touchless water fountains need to be finish installed & install one.

Girls Locker Room 117 Stall 2 & 4 need attention. Check all showers. Install a touchless water fountain.

Girls Locker Room - Janitor 11 No water pressure and hot water.

Gymnasium Corridor 136A Turn the faucet feature off.

Boys Locker Room 16

Check showers. Stalls 2 & 3 clogged. Check touchless. Urinal #3 needs touchless. The 2nd sink is missing a pipe and draining into the adjacent pool room. A touchless water fountain needs to be installed.

Boys Locker Room - Janitor 11 Check leak. No, hot water.

Student Center Building #14

Touchless Water Fountain Turn off the faucet.

Faucet and sink 102 Completely replace janitor sink and faucet.

Girls Restroom 103 Remove three toilets. Replace with four new toilets.

Boys Restroom 104 Install four touchless urinals.

Install three new toilets.

Janitor 103A Replace tub and faucet.

Pupil Personnel Service Building #71

Between storage and Mens restroom Install touchless water fountain.

Mens Restroom 116 Toilet floods.

Bennett Hall Building #55

Girls Restroom Replace two toilets with two new toilets.

Install touchless faucet.

Boys Restroom Replace one toilet with a new toilet.

Install touchless faucet and urinal.

Museum Building #46

Touchless Water Fountain Install touchless water fountain.

School Shop Building #5

Clark Center Install touchless sink faucet and touchless water fountain.

Facility Management #72

Womens Restroom Install touchless faucet.

Touchless Water Fountain Install touchless water fountain.

Mens Restroom Install touchless faucet.

Kitchen/Dining Hall #9

Handwashing sink No hot water.

Produce sink Water drips. Change out the knob. We have the part.

Three compartment sink Replace faucet. We have the part.

Check water heater The water is not getting hot.

Restroom No hot water.

Washroom No hot water.

Winona Dorm #6

East Wing - Restroom Toilet - Out of order.

East Wing - Restroom Replace all 11 toilets.

West Wing - Restroom Replace all 11 toilets.

East Wing - Showers #5 dripping water.

North Wing - Showers #4 doesn't have a knob, #3 needs attention, and #6 doesn't have a knob.

Isolation Room 102 Add shower head to the shower room.

Kitchen sink No hot water.

Warehouse #22

No water Install water spigot.

Wauneka #7

Touchless Water Fountain Leaking.

East Wing - Water Fountain Check pipping to see if we can get it working.

East Wing - Restrooms Stall #3 leaks, and #11 runs after flushing.

East Wing - Restrooms Replace all 11 toilets.

West Wing - Restroom Replace all 11 toilets.

East Wing - Showers Update all shower knobs and heads. Extend showerheads to make them higher.

Stall #1 is out of order and #7 spitting water out.

Janitors room 123 New hose.

Kitchen sink No hot water.

Restroom 139 Stall #5 water is running, and handle is loose, #8 flushes and water fills then drains, and #10 water is running.

Janitors room 138 New hose.

Shower room 156 Update all shower knobs and heads. Extend showerheads to make them higher.

Field House Locker #78

Boys Locker Touchless urinals, touchless water fountain, four touchless toilets, and check the showers.

Girls Locker Touchless urinals, touchless water fountain, four touchless toilets, and check the showers.

Field Restroom #69

Boys restroom Install 4 touchless toilets, 5 touchless urinals, 4 touchless faucets. Urinal is backing up.

Girls restroom Install 6 touchless toilets, 4 touchless faucets, and check plumbing.

Wigwam Dorm #3

North Wing Restrooms 5 urinals touchless, #3 middle urinal is running.

Stall #3 is running.

North Wing Restrooms Replace all 4 toilets.

South Wing Restroom Replace all 4 toilets.

North Wing Showers Shower stall #6 needs a shower head and knobs.

Touchless Water Fountain

The touchless water fountain in the middle of the hallway needs to be readjusted.

South Wing Restroom 5 urinals touchless, #2 and #3 out of order. Need attention.

The accessible toilet is running.

South Wing Shower room 105 Shower stall #1 needs a handle, and #7 is leaking.

Room 102 A shower head is needed.

Janitor room 123 New hose.

Ramona Dorm #10

Restroom Stall #2 is out of order. The accessibility is out of order.

Showers 156 Shower stall #4 needs plumbing.

Lounge 134 Dispenser repositioned to opposite wall.

133A Dispenser reposition.

Bathroom Stall #1 floods and #6 is out of order. The accessibility is out of order.

Janitor room 123 New hose.

Showers Shower stall #1 missing handle, handicap shower missing hose.

Laundry room Smells like sewer sometimes. Check lines.

Isolation room 102A Fixtures are missing.

East Wing - Restrooms Replace all 10 toilets

West Wing - Restroom Replace all 10 toilets

Staff Lounge Replace toilet

Back apartment Replace toilet

Isolation room Replace toilet

Fire room Replace toilet

Electrical & Electronics Building #62

Girls Restroom Check plumbing

Touchless Water Fountain Remove and install (D. Trapp Classroom).

Classroom 113 Room 108 no hot water (Heard Classroom).

Shops #5D

Bathroom Water is taking a while to get hot.

Removal and Installation Remove and close eye wash station. Install a deep sink next to the restroom.

Shops #5

Herrington

Install Install touchless water fountain.

Install Install water spigot

Shops #5

Clark Center

Mens Restroom Toilet doesn't flush.

Womens Restroom Toilet doesn't flush.

Install Install touchless water fountain.

CLEAN-UP AND REPAIRS: Upon completion of the project, remove all tools, equipment and keep the site clean. Return structures and surfaces to the condition existing prior to the commencement of work.

SITE OBSERVATION VISIT/INSPECTION: Contractor shall conduct an on-site assessment to determine conditions and site layout. Contractor shall verify all items of work and notify the COR of any discrepancies or concerns prior to performing any work.

DISPOSAL OF DEMOLISHED MATERIALS: Remove debris, rubbish and other materials resulting from plumbing. Transport and legally dispose of materials off-site. Debris disposal shall be the responsibility of the contractor. The contractor shall make arrangements for disposal of all construction debris, and non-asbestos containing building materials.

SERVICES: The Contractor shall furnish all technical, supervisory, and administrative personnel to ensure the expeditious accomplishment of the work. Additionally, the contractor shall provide all necessary services, labor, supplies, materials, equipment, travel, and all cost associated with this project.

At a minimum warranty, one year after completion vendor will have to correct defective work.

DAMAGES: Where existing surfaces are damaged by this work. They shall be repaired and finished to match existing construction. The Contractor shall be responsible for replacing any items (interior or exterior) damaged during the performance of this project.

GOVERNMENT-FURNISHED PROPERTY (GFP): No government property will be furnished. The contractor will provide all supplies, equipment, personnel, and materials necessary to complete work.

PERIOD OF PERFORMANCE: Within a Reasonable Time after receipt Awarded. Contractor shall propose a delivery schedule.

PLACE OF PERFORMANCE:

Sherman Indian High School

9010 Magnolia Ave.

Riverside, CA 92503

The entrance onto the site will be off Jackson Street.

POINT OF CONTACT:

Contracting Officer’s Representative for this project:

Name: Carlita Key, Business Technician

P: 951-276-6325 ext. 358

Email: carlita.key@bie.edu

END OF STATEMENT OF WORK (SOW)