Attachment 1 - SOW Upper and Lower F-16 Blending Kits.pdf

PDF 311 KB Posted

Attached to
Upper & Lower Radius Blending Tool Kits
Solicitation number
FA487724Q0015
Issued by

About this file

This document is a Statement of Work (SOW) for the manufacture of F-16 Upper and Lower Radius Blending Tool Kits for the 309th Aerospace Maintenance and Regeneration Group (309th AMARG) at Davis-Monthan Air Force Base.

The contractor shall manufacture five (5) F-16 Upper End Pad Fillet Radius Blend Tool Kits in accordance with Drawing Package Kit #F-16-16-011 Rev. K, and two (2) F-16 Lower End Pad Fillet Radius Blend Tool Kits in accordance with Drawing Package Kit #F-16-15-001 Rev. E. The kits must be fully assembled, watertight, crushproof, and dustproof, with certified compliance and initial calibration provided. The first kit of each type is due 30 days after contract award, with the remaining kits due within 60 days. The contractor must comply with requirements for safeguarding classified and other sensitive information. This SOW is related to Solicitation #FA487724Q0015 for the Upper & Lower Radius Blending Tool Kits, issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Attachment 4 - Kitted Complete Tooling Kit example.jpg JPG image
Solicitation - FA487724Q0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

F-16 Upper and Lower Radius Blending Tool Kit Manufacture

309th Aerospace Maintenance and Regeneration Group (309th AMARG) Davis Monthan AFB, AZ 85707

DESCRIPTION OF SERVICES: The contractor shall provide all parts, tools, equipment, materials, transportation, personnel, labor, supervision, and management to perform manufacturing of five (5) F-16 Upper End Pad Fillet Radius Blend Tool Kits In Accordance (IAW) With DRAWING PACKAGE Kit #: F-16-16-011 Rev. K and two (2) F-16 Lower End Pad Fillet Radius Blend Tool Kits IAW DRAWING PACKAGE Kit #: F-16-15-001 Rev. E for 309 AMARG, at Davis-Monthan Air Force Base (DMAFB) Tucson AZ.

1. Manufacturing of F-16 Upper End Pad Fillet Radius Blend Tool Kits: The contractor shall manufacture five

(5) F-16 Upper End Pad Fillet Radius Blend Tool Kits IAW DRAWING PACKAGE Kit #: F-16-16-011 Rev. K (attachment 2), absolutely NO deviation shall be permitted under any circumstance.

1.1. Complete Upper End Pad Fillet Radius Blend Tool Kits: The contractor must build each kit as a fully kitted tool kit. Each kit must be built in its entirety and contain the following items listed in DRAWING PACKAGE Kit #: F-16-16-011 Rev. K (attachment 2), absolutely NO deviation shall be permitted under any circumstance. Please see attachment 4 for reference picture of a completed kit. The outer case must be watertight, crushproof, and dustproof with double latches, steel hinges and latch pins with a rubber overlay handle. Interior foam must support the mass load and still cushion sensitive equipment from impact forces; 2 - color foam shall be used to allow the use of contrasting of colors to show the user visually that tools/items are missing.

1.2. Certification Of Compliance (COC) and Initial Calibration of completed F-16 Upper End Pad Fillet Radius Blend Tool Kits: The contractor shall submit a COC and Initial Calibration that reflects F-16-16- 011 Rev. K from the manufacture with each Tool Kit. The Government reserves the right to reject any completed F-16 Upper End Pad Fillet Radius Blend Tool Kits delivered without COC and Initial Calibration and to be returned to manufacture for COC and Initial Calibration at no cost to the government.

2. Manufacturing of F-16 Lower End Pad Fillet Radius Blend Tool Kits: The contractor shall manufacture two

(2) F-16 Lower End Pad Fillet Radius Blend Tool Kits IAW DRAWING PACKAGE Kit #: F-16-15-001 Rev. E (attachment 3), absolutely NO deviation shall be permitted under any circumstance.

2.1. Complete Lower End Pad Fillet Radius Blend Tool Kits: The contractor must build each kit as a fully kitted tool kit. Each kit must be built in its entirety and contain items listed in DRAWING PACKAGE Kit #: F-16-15-001 Rev. E (attachment 3), absolutely NO deviation shall be permitted under any circumstance. Please see attachment 4 for reference picture of a completed kit example. The outer case must be watertight, crushproof, and dustproof with double latches, steel hinges and latch pins with a rubber overlay handle. Interior foam must support the mass load and still cushion sensitive equipment from impact forces; 2 color foam shall be used for contrasting of colors to show the user visually, that tools/items are missing.

2.2. Certification Of Compliance (COC) and Initial Calibration of completed F-16 Lower End Pad Fillet Radius Blend Tool Kits: The contractor shall submit a COC and Initial Calibration that reflects F-16-15- 001 Rev. E from the manufacture with each Tool Kit. The Government reserves the right to reject any completed F-16 Lower End Pad Fillet Radius Blend Tool Kits delivered without COC and Initial Calibration and to be returned to manufacture for COC and Initial Calibration at no cost to the government.

3. Safeguarding of Classified and Other Information: The contractor shall ensure that contractor employees do not notify, repeat, comment upon, disclose, or use in any way information seen, observed, or derived from documents or conversations of a sensitive or confidential nature overheard by them. The contractor shall comply with and assume responsibility for compliance of this provision by its employees.

4. For Official Use Only (FOUO): The contractor shall comply with DoDD 5400.07, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material. Contractor shall not duplicate, share, or any other means that could be in violation of DoDD 5400.07, Chapter 4, DoD Freedom of Information Act (FOIA).

5. Delivery of Upper and Lower End Pad Fillet Radius Blend Tool Kits: Contractor shall complete and deliver one (1) Upper End Pad Fillet Radius Blend Tool Kits kit and (1) Lower End Pad Fillet Radius Blend Tool Kit

(30) days after contract award. If the contractor can’t meet the request, the contractor must contact the AMARG POC, and the contractor must submit a schedule advising the government of expected delivery. The remaining kits (4) Upper End Pad Fillet Radius Blend Tool Kits kit and (1) Lower End Pad Fillet Radius Blend Tool Kit shall be completed and delivered with-in 60 days of contract award. If the contractor can’t meet the requested date, the contractor must contact the AMARG POC immediately and the contractor must submit a schedule advising the government of expected delivery.

File details come from the government source that posted it. Updated .