Attachment 1 - SOW_TreeRelease_2026.doc

DOC document 183 KB Posted

Attached to
Hebo Tree Release and Weed 2026 - Siuslaw NF OR
Solicitation number
1240BG26Q0011
Issued by

About this file

This is a Statement of Work (SOW) for a tree release and weed management project at the Siuslaw National Forest, Hebo Ranger District in Oregon. The contractor must perform stand density management services on approximately 173 acres across ten subitems (0001AA through 0001AJ) located in Tillamook, Lincoln, and Yamhill Counties. Work includes cutting brush, natural tree seedlings, fern vegetation, and red alder within specified radii around planted conifers to promote forest health. The scope requires cutting vegetation within a five-foot radius and four inches of ground level around each release tree, cutting red alder within 15 feet of planted trees where alder is 1-3 inches in diameter, and removing Scotch broom from road prisms and landing areas. Individual subitems range from 1 to 74 acres, with specific spacing requirements (20' x 20' to 27' x 27'), tree density targets (60-109 trees per acre), and timing restrictions including 2-hour activity windows in certain areas. Some units involve walk-ins up to 0.4 miles from road access points.

The estimated period of performance is June 22 through July 3, 2026 (12 workdays) with work location at Siuslaw National Forest, Hebo Ranger District near Hebo, Oregon. This is a small business set-aside solicitation (NAICS code 115310, size standard $11.5 million) issued as Request for Quotation 1240BG26Q0011. A single award will be made, with contractors required to submit pricing for all items and provide copies of MSPA licenses, Oregon BOLI licenses, and H2B temporary employment certificates if applicable. Quality assurance includes 100 percent visual inspection and random 1/50th acre plot sampling with a minimum acceptable performance standard of 80 percent satisfactory work; quality below 90 percent results in payment deductions. The contractor must furnish all labor, equipment, supervision, transportation, and supplies, maintain a Quality Control Plan, and ensure on-site representation fluent in English.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR), as supplemented with additional information included in this notice. This announcement constitutes the only solicitation and quotes are requested.

(ii) This solicitation is issued as a Request for Quotation, under # 1240BG26Q0011

(iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06.

(iv) This procurement is set aside for Small Business. The NAICS code is 115310 and the Small Business Size Standard is $11.5 million.

(v)Schedule of Items/Price Schedule See Attachment # 1. A single award will be made from this solicitation; submit pricing for all items.

(vi) Description of Requirement (including a list of any attachments) Siuslaw NF, Hebo Ranger District Stand Density Management – Tree Release and Weed

GOVERNMENT STANDARDS/STATE STANDARDS/TECHNICAL EXHIBITS

Attachment
Number of Pages

Attachment 1: Schedule of Items (attached)

Attachment 2: Detailed Unit Information Sheet (attached)

Attachment 3: Statement of Work (attached)

Attachment 4: Tube Installation with Two Bamboo (attached)

Attachment 5: Wage Determination 1977-0079 Rev 79 Dated 7/08/2025 (attached)

Attachment 6: 2a: Fire Protection and Suppression Forms, R6-FS-

6300-52 & R6-FS-6300-54 (Forest Service) 2b: Fire Protection Requirements (BLM) (attached)

Attachment 7: Vicinity and Unit Maps (attached)

(vii) Date(s) and Place(s) of Delivery and Acceptance/Location Estimated Period of Performance: June 22nd through July 3rd, 2026 *

Performance Time: 12 workdays

*Estimated Period of Performance, the performance time shall be followed.

Project Location: Siuslaw National Forest, Hebo Ranger District, near Hebo, OR

Siuslaw National Forest, Hebo Ranger District Tree Release and Weed Business Name:

Address:

Phone/Email:

Solicitation #:

Date:

UEI#

Quote Due:

UEI# issued at www.sam.gov (required)

FOR: Siuslaw National Forest, Hebo Ranger District

SCHEDULE OF ITEMS

Item # Stand Density Management – Tree Release and Weed

Subitem
Sale Name and Unit #
Activity
Quantity in Acres
DTR
Unit Price
Total
0001AA
Battle Ridge 29
release
11
2-hr
$
0001AB
Battle Ridge 33
release
1
2-hr
$
0001AC
Battle Ridge 39
release
12
2-hr
$
0001AD
Cedar Lake 54 UP & Gap
release
10
2-hr
$
0001AE
Swab 58 Gaps
release
7
N/A
$
0001AF
Swab 98 Gaps
release
6
N/A
$
0001AG
Later 46 U/P
release
4
N/A
$
0001AH
Jenck 3 U/P
release
74
N/A
$
0001AI
Jenck 20 U/P
release
15
N/A
$
0001AJ
Jenck 64 area
release
33
N/A
$

Grand Total

173
Acres

No rounding off unit pricing or totals. Unit price and totals shall be in exact dollars and cents.

Along with quote, submit copies of MSPA license for owner and drivers (signed cards), copy of Oregon BOLI license, and H2B Temp Employment certificate, if applicable. The same documents shall be included with quote for any subcontractors. Documentation must be sent with quote to be considered for award.

Contractor’s Signature:

Date:

Location and Description of Project Areas:

Subitem
Treated Acres
Unit Name
Daily Timing Restrictions
Year &

Species Planted Average TPA

Spacing

Additional Information

0001AA
11
Battle Ridge 29 Area
2-hr
2024

WRC/WH/SS/BLM

20’ X 20’ 2-hr timing restriction on NW section

0001AB
12
Battle Ridge 39 Area
2-hr
2024

WRC/DF/WH/SS/BLM

20’ X 20’ 2-hr timing restriction on northernmost area

0001AC
1
Battle Ridge 33 Area
2-hr
2024

WRC/BLM

24’ X 24’ 2-hr timing restriction on whole area

0001AD
10
Cedar Lake 54 U/P & Gap
2-hr
2023

WRC/WH

25’ X 25’ 1-acre gap located within underplant

0001AE
7
Swab 58 Gaps
N/A
2025

WRC/WH/SS

22’ X 22’ 7 – 1 acre gaps with 2 gaps with 70 TPA & 5 with 90 TPA

0001AF
4
Swab 98 Gaps
N/A
2025

WRC/WH/SS

25’ X 25’ 4 – 1 acre gaps with 2 gaps with 90 TPA & 2 gaps with 70 TPA. Short 0.15 mi walk-in on closed road

0001AG
4
Later 46 Area
N/A
2025

WRC

27’ X 27’ Located behind locked gate

0001AH
74
Jenck 3 U/P
2-hr
2021

WRC/SS

23’ x 23’ 2-hr timing restriction on eastern most portions

0001AI
15
Jenck 20 U/P
2-hr
2021

WRC/SS

22’ x 22’ 2-hr timing restriction on eastern portion, below main road

0001AJ
33
Jenck 64 Area
2-hr
2021

WRC/WH/SS

23’ x 23’ 2-hr timing restriction on western portion, below temp road

DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Stand Density Management – Tree Release and Weed

Scope of Contract

The purpose of this solicitation is to secure services to release young forest seedlings on approximately 173 acres on the Hebo Ranger District, Siuslaw National Forest, Tillamook, Lincoln, and Yamhill Counties. The Contractor shall furnish all technical expertise, labor, equipment, supervision, transportation, operating supplies, and incidentals to perform the work as specified in the solicitation.

Location and Description

The area covered by this solicitation is shown on the attached vicinity and unit maps. A more detailed map can be purchased at the Hebo Ranger Station. Most boundaries are easily identified by cutting lines, ridges, flagging, blue sale area tags, etc.

Many Forest Service spur roads may be overgrown with vegetation making them narrow and brushy. In addition, many Forest Service key and spur roads have been “storm proofed” or had water-bars installed; therefore, a high clearance vehicle is recommended. Contractors are advised to visit the sites to assess road access and unit complexities.

Definitions Administrative Office – The Government Offices, which may have personnel involved in the issuance of keys, inspection and acceptance of project work.

Average spacing - The average of the distance between all leave trees necessary to provide the desired number of leave trees per acre.

Blocked Roads – A road that is physically blocked by the Government. These roads are, but are not limited to roads with pulled culverts and roads blocked by berms or logs.

Brush – Vegetation consisting of shrub species with single or mult-stems originating at or near ground level not normally reaching 20 feet in height. Vine maple, ceanothus, rhododendron, manzanita, hazel, ocean-spray, willow, ninebark, or any others listed on Project Maps or Technical Specifications.

Calendar Days - Every day shown on the calendar, Saturdays, Sundays, holidays included.

Conifer – An evergreen, cone bearing tree.

Damage – Includes any defect or deformity of a tree resulting from agents such as wind, snow, animals, insects, disease, and equipment, and evidenced by such things as dead or broken top or trunks, crooks, and deep scars.

DBH (Diameter breast height) - Diameter of the trunk measured at a point 4-1/2 feet above the ground level on the uphill side of tree.

Deficient Trees – trees that were not maintained to technical specification. This includes trees not treated, trees not brushed at the 5’ radius, trees not brushed within the 8’ vertical cylinder.

Ephemeral Streams – Streams carrying surface runoff only during or immediately after a rainstorm or snowmelt. Channels are not well defined and usually are covered with a litter layer characteristic of the surrounding forest.

Gaps- Created opening in which all trees and brush are cut.

Girdling - Cuts through the bark and cambium tissue completely encircling the tree trunk for the purpose of killing the tree.

Hardwoods – A broad-leaved tree that usually has a single well-defined trunk and attains a height of greater than twenty feet. The hardwoods referenced in this contract are listed below, any other species will be referred to as brush or shrubs:

Big leaf maple (acer macrophyllum)

Red alder (alnus rubra)

Intermittent Stream – Streams that carry water most of the year, but do not flow during part of the summer. In contrast to ephemeral stream, during summer low flow, intermittent channels are obviously dry stream beds.

Inter-planting - The planting of additional seedlings in units or areas previously planted.

Labor Standards Provisions – Those statutory and regulatory requirements pertaining to the Contractors employees.

Mechanical Damage - Any contractor caused injury or damage to bark or foliage of the leave tree.

Node – a joint in a stem

Opening – An area within or adjacent to the project area in which no conifers are growing, and all conifers on the perimeter are the stated distance or greater to conifers on the opposite side.

Operational Damage – Damage done by the Contractor’s operation to leave trees, the stand, or any other resource including private property, or any improvement not owned, rented, or leased by the Government.

Perennial Stream (active stream) – Any stream where water is present the entire year.

Red Alder Patch – An area of red alder where no other tree species is present. The area must be at least twice the average specified leave tree spacing for the sub-item in both length and width.

Release - The cutting of vegetation within a specified radius around a suppressed leave tree.

Riparian Reserves - Land along streams, pond or lakes where riparian dependent resources receive primary emphasis.

Satisfactorily Tubed - Any tubed tree meeting all of the specifications in Tubing Data Sheets and Vicinity Maps and not exceeding the maximum number of tubed trees per plot.

Slash - Any existing down woody debris whose cause is either by natural or man-made conditions.

Spacing - The horizontal distance in feet between one leave tree to the trunk of the next nearest leave tree measured center to center.

Stream bank - The part of a stream channel that restricts sideways water movement at normal flows.

Stream buffer – An area left uncut adjacent to streams.

Terminal leader – The top portion of a conifer tree. A missing terminal leader occurs where one or more years of growth are gone (broken or damaged)

Trees Per Acre – A measure of the density of trees on a per unit area basis. The number of trees per acre.

Tubes and Bamboo - That which is used to protect seedlings after planting.

Unsatisfactory Trees – Excess and deficient trees.

Vegetation - Includes all woody and non-woody plants. These are, but not limited to; trees, brush, shrubs, ferns etc.

Vexar Tube – a rigid, polymer, mesh tube

Walk-in – refers to distances greater than ¼ mile from the nearest road access point to the unit boundary, either on a closed road or through unit.

Whorl - a circular arrangement of like parts, as leaves or branches, around a point on an axis; verticil.

NOTIFICATION OF SUBCONTRACTING–MSPA CONTRACTS

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontracting arrangement. All clauses contained in this contract will be passed down to the subcontractor with a signed notice of subcontracting. The Contractor shall provide the following information to the Contracting Officer for all sub–contractors to be utilized during the performance of this contract:

1. Name address, telephone number and email address of the subcontractor.

2. Federal MSPA Registration Certificate (orange card)

3. Employee registrations tied to the subcontractor’s MSPA Registration Certificate (blue cards)

4. State Farm/Forest License

5. Required motor vehicle insurance

6. Required Workman’s Compensation, Employer’s Liability, and General Liability insurance.

7. List of PPE provided to employees at no charge

8. Housing plan (including camping) if applicable

9. A copy of the signed subcontracting arrangement with the date upon which the subcontract was entered into and its duration.

10. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

SUPERINTENDENCE BY THE CONTRACTOR

At all times during performance of this contract, and until work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.

All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require in writing that the Contractor removes from the work any employee the Contracting Officer/ COR deems incompetent, careless, or otherwise objectionable.

The Contractor’s onsite representative shall be fully conversant in the English language, spoken and written, sufficient to read and understand the contract and communicate effectively with COR.

Government Furnished Material The property and services provided by the Government are listed below. The Contractor shall inform the Government when supplies are needed, and both parties shall schedule a time to meet at the warehouse where the Government will issue the needed supplies to the Contractor. The Contractor is responsible for safe handling and transport of supplies to the work sites.

The Contractor shall be liable for all loss or damage of such delivered Government-furnished property until completion and final acceptance of work required under this contract. All unused Government furnished material shall be returned to the Government in the original packaging and in good condition.

Description
Quantity

None

CONTRACTOR FURNISHED CRITICAL ITEMS/SERVICES

Description
Quantity
Brush Cutting tool
As needed

CONTRACTOR QUALITY CONTROL PLAN

A. Quality Control Plan

The Contractor shall provide a Quality Control Plan (QCP) as part of this Technical Proposal. The Plan must demonstrate how the Contractor shall assure that quality of performance meets the objectives and requirements of the contract. The QCP shall specify:

- How quality will be monitored to ensure performance standards are met.

- How the work will be supervised.

- How results of the monitoring will result in quality performance.

- Identify the personnel responsible for performing quality control.

B. Contractor Quality Control Inspection

The Contractor shall assure themselves that performance meets contract specifications, in accordance with FAR 52.212-4, Contract Terms and Conditions -- Commercial Items, paragraph (a), prior to requesting the Government to inspect for payment or acceptance. The Contractor shall contact the Contracting Officer upon completion of a work area. The Contracting Officer may observe the Contractor’s inspection at any time and shall otherwise have unlimited access to the inspection data.

(End of clause)

GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

The Government will conduct inspections of each unit to determine work quality. Initial inspections will consist of a 100 percent visual inspection and will be based on adherence to contract technical specifications. The Government may also install a series of circular plots as specified by each District. Should repeated deficiencies be found during the visual inspections and notification of those discrepancies have been brought to the Contractors attention repeatedly, yet not brought up to acceptable work in meeting specifications, plots will be established and documented. Plots will be randomly located throughout each sub-item to obtain a representative sample of the work. Plots will generally be 1/50th acre.

The following data will be collected on each plot:

(a) Number of trees that should have been brushed

(b) Number of trees that were brushed

(c) Number of satisfactory brushed trees

(d) Number of deficient trees (see definitions)

The following deficiencies will be considered in determining performance quality:

1. Natural trees, brush and red alder not completely severed from the stump or not severed below the lowest live limb, except when prevented by obstacles (e.g., rocks, logs).

2. Red alder not cut within 15 feet of a leave tree.

3. Brush height exceeding the maximum 4 inches above the ground or obstacles.

4. Live limbs encroaching on the five-foot radius, up to an eight-foot vertical clearing.

5. Cut vegetation left suspended above the ground and/or over the leave tree.

6. Leave trees that are damaged during the cutting operation.

After inspection of all plots for a sub-item, the quality of release shall be calculated as follows:

(# of satisfactory trees/# of trees that should have been brushed) X 100 = Performance Quality %

Quality below 90 percent will be deducted from payment (See Payment clause). When inspection results are below 80 percent, payment will not be made until the deficiency has been corrected by the Contractor. Note: Minimum acceptable quality is 80 percent.

Reinspections after rework will be made in the same manner as the first inspection, but on different plot lines. The Contractor shall pay for inspections necessitated by the rework.

Reinspection of Release upon Contractor Request

If original inspection results are unacceptable to Contractor, the Contractor shall submit a reinspection request in writing within three (3) calendar days of the original inspection notification. For reinspections without rework, the same inspection procedure will be used following a different plotline. If the reinspection shows less than 5 percent variance from the first inspection, the Contractor shall pay the cost of the reinspection and results of the reinspection will be averaged with the results of the first inspection to determine payment. If the reinspection shows more than 5 percent variance from the first inspection, the Government shall bear the cost of the reinspection and results of the reinspection will be used to determine payment.

(End of clause)

UNSATISFACTORY PERFORMANCE

If the percentage of satisfactory work falls below 80 percent, the Government will immediately notify the Contractor in writing and order improvement of the quality of future work. If the quality of future work is not raised above the 80 percent within two consecutive workdays after receipt of notice in writing of unsatisfactory work, the Contractor's right to proceed may be terminated and the contract considered in default. Repeated failure to perform work at or above 80 percent acceptable performance shall also be considered reason for contract termination and default action.

(End of clause)

REWORK AND REINSPECTION AFTER REWORK

When inspection results are below 80 percent and the deficiency is correctable, payment will not be made until the deficiency has been corrected. Reinspection after rework will be made in the same manner as the first inspection but on different plot lines. The Contractor shall pay for inspections necessitated by the rework.

(End of clause)

POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 7 days after the date of award. The conference will be held in person at Hebo Ranger Station or via phone.

(End of Clause)

PERFORMANCE WORK STATEMENT, TASKS AND CRITICAL SUBTASKS

5.1 Tree Release & Weed Technical Specifications

Subitems 0001AA through 0001AJ – Tree Release and Weed shall be performed around all planted trees identified under “Year & Species Planted” on the “Detailed Unit Information Sheet”, 2 pages, at the spacing indicated, average trees per acre (TPA) and as defined below. Most of the planted trees have a florescent ribbon attached to the tube or bamboo making it easier to locate them. Otherwise, pacing should be utilized to locate planted seedlings. Cut red alder within 15 feet of any planted tree, meeting the size, and spacing indicated, whether tree is above the bush or not, when encountered as defined below in 5.1.1. (2).

The Contractor is encouraged to visit the units prior to placing a bid.

The Contractor shall keep the government informed about their work location and progress at the beginning or end, of each workday.

Walk-ins: A walk-in over ¼ mile from the nearest drivable road access point to the unit boundary should be taken into consideration when submitting your bid. Stated mileage in this contract will be rounded to the nearest ¼ mile. Mileage is paid once, and not per person. Walk-ins follow closed roads or short distances through the unit to release unit boundaries or a release gap boundary. They are measured distances.

Known walk-ins over ¼ mile for Hebo 2026 Tree Release and Weed:

Subitem 0001AC Battle 33 – 0.4 mi walk-in on closed road

5.1.1. Specifications for Tree Release in Plantations

1. The Contractor shall cut all brush, natural tree seedlings and fern vegetation within four inches of the ground and for a five-foot radius, surrounding each tree needing released. Radius is measured from bole of tree. This includes clumps of natural regeneration seedlings less than 1 inch in diameter at breast height.

2. The Contractor shall cut Red Alder when encountered within a 15-foot radius surrounding each planted tree where the alder is not less than 1 foot tall or greater than 3 inch in diameter at breast height. Radius is measured from bole of the planted tree.

3. The Contractor shall not damage existing tree seedlings, tubes, or bamboo during the cutting operation.

4. The Contractor shall ensure cut hardwoods, excess natural conifers and brush are completely severed from the stump with a level cut.

5. The Contractor shall leave no cut vegetation suspended above the ground by the released trees.

6. The Contractor shall cut the brush and hardwoods within the 5-foot radius, around each planted conifer except where the following occurs: Douglas-fir having at least 3 branch whorls above the highest surrounding brush, and western hemlock and western red-cedar, having leaders at least 3 feet or greater above the surrounding brush.

7. The Contractor shall cut the crowns or branches of any brush or hardwood, exceeding the 3-inch alder cut limit when it is encroaching on the five-foot radius; to the limits of a vertical cylinder eight feet in height surrounding each tree to be released.

8. The Contractor shall cut all Scotch broom along the road prism and landing areas, within the unit boundaries, before departing.

QUALITY/PERFORMANCE REQUIREMENTS SUMMARY

Requirement
Performance

Standard Method of

Assessment Incentive/Deduction for meeting the standard

Tree Release

See Section 5.1.1. (1 through 8)

Meet all specifications for brush/red alder release and cut vegetation
100% visual inspection and random 1/50th acre plots
Addendum to FAR 52.212-4, “Unsatisfactory Work.” Rework to meet contract requirements.
Quality Control
Contractor maintains good quality on all aspects of operations. Deficiencies shall be corrected per Section 5 Contractor’s QCP.
COR randomly observes Contractor’s operation and may request Contractor’s inspection sheets.
The Contractor’s ability to meet the standard will be reflected in the performance evaluation either positive or negative. If the Contractor fails to meet the standards, work may be suspended or terminated for cause for failure to take corrective action immediately.