Attachment 1 - SOW B350 dated 9 June 2020.pdf

PDF 15 KB Posted

Attached to
349 AMW Facility Projects B350 Renovation & HVAC Federal contract opportunity
Solicitation number
FA442720R0018
Issued by
Department of the Air Force Air Mobility Command

About this file

This scope of work document outlines the requirements for renovating Building 350 at an Air Force base, including HVAC upgrades, bathroom renovations to meet ADA standards, replacing an existing water heater, electrical upgrades, and constructing an exterior mechanical enclosure. The contractor will be responsible for professional services, permits, equipment, labor, materials and other ancillary items necessary to complete this project. Work must be performed according to the provided architectural and engineering designs, and the contractor must follow all general requirements, special requirements, and references specified in the attachments, including testing for lead and asbestos, adhering to interior design policies, environmental regulations, and using a subcontractor for any Johnson Controls equipment. The project will be conducted under solicitation number FA442720R0018 issued by the Department of the Air Force Air Mobility Command for facility projects at Building 350.

View the file

Other files for this federal contract opportunity

Other files attached to 349 AMW Facility Projects B350 Renovation & HVAC, newest first.
File Type Posted
Solicitation Amendment - FA442720R00180004.pdf PDF
350 As-builts Combined Files.pdf PDF
B350_Final DrawingsA-501WallSection.pdf PDF
Bldg 350 RFIs.pdf PDF
Solicitation Amendment FA442720R00180003 SF 30.pdf PDF
Solicitation Amendment FA442720R00180002 SF 30.pdf PDF
Solicitation Amendment FA442720R00180001 SF 30 (1).pdf PDF
Attachment 5 - UFGS 01 14 00 WORK RESTRICTIONS.pdf PDF
SECTION 01 56 00_Environmental Specifications April 2019.pdf PDF
Attachment 10 - UFGS 01 78 00 Closeout Submittals.pdf PDF
23 09 00 Johnson Controls Spec.pdf PDF
Attachment 4 - Travis Design Guide FEG.PDF PDF
Attachment 7 - UFGS 01 35 26-GOVERNMENTAL SAFETY REQUIREMENTS.pdf PDF
Attachment 6 - UFGS 01 33 00- SUBMITTAL PROCEDURES.pdf PDF
AFRC Interior Design Policy Manual.pdf PDF
Attachment 11 - Past Performance Questionnaire.pdf PDF
Attachment 8 - UFGS 01 45 00.00 40-QUALITY CONTROL.pdf PDF
Attachment 9 - UFGS 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.pdf PDF
Attachment 2 - TAFB Security Clause dated 05 Mar 19.pdf PDF
Attachment 3 - WD CA20190007 dated 08 May 2020.pdf PDF
Travis AFB_B350_Final Specifications.pdf PDF
Travis AFB_B350_Final Drawings.pdf PDF
SECTION 01000 Updated 07 Jun 19.pdf PDF
Solicitation - FA442720R0018.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Project Name: Repair HVAC, Elec & Upgrade Restrooms, B350

XDAT # 12-9001

09 June 2020

1. SCOPE

1.2 Repair Building 350.

1.3 Work to include:

i) Renovate existing restrooms and shower to be fully ADA/ABA compliant as noted including, but not limited to new water closets, lavatories, urinals, service sink, shower fixtures, lighting, and finishes.

ii) Complete renovation of the existing mechanical system including all equipment, ductwork, diffusers, piping, and controls as noted.

iii) Replacement of existing water heater.

iv) Upgrade electrical as noted.

v) Construction of a new exterior mechanical enclosure including relocating of existing flag pole, associated flat work and interior construction.

2. REQUIREMENTS

2.1 General Requirements

2.1.1 Contractor shall test for lead paint & asbestos.

2.1.2 Contractor to follow AFRC Interior Design Policy Manual for materials.

2.1.3 Contractor to follow Division 01 General Requirements Section 01000

2.2 Special Requirements

2.2.1 See Design Drawings (Attachment 1), Basis of Design (Attachment 2) and Structural

Design (Attachment 3).

2.2.2 Contractor shall follow mitigation measures/requirements as required in Section 01 56 00, Environmental General Requirements

2.2.3 Contractor shall subcontract any work on Johnson EMS Controllers to Johnson Controls.

2.2.4 Contractor shall phase construction, move or relocated office furnishings at the direction of the Government.

2.2.5 Contractor to provide alternate restroom facilities during restroom construction.

3. REFERENCES

3.1.1 See A-E Design Drawings (Attachment 1), Basis of Design (Attachment 2) and Structural

Design (attachment 3).

4. ATTACHMENTS

Attachment 1: 100% B350 Design Drawings

Attachment 2: 100% B350 Basis of Design Attachment 3: 100% B350 Structural Design Attachment 4: AFRC Interior Design Policy Manual Attachment 5: Division 01 General Requirements 01000 (03/22/2019) Attachment 6: Section 01 56 00 Environmental General Requirements (04/05/2019) Attachment &: 23 09 00 Johnson Controls Specification

//End of S.O.W. //