Attachment 1 - SOO FOC ITB1101 to ITB6901_9 Feb 2022.pdf

PDF 164 KB Posted

Attached to
FOC Installation, ITB1101 to ITB6901 Federal contract opportunity
Solicitation number
FA301022R0010
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES (SOO)

For

Fiber Optic Cables from ITB 1101 to ITB 6901

Keesler AFB MS

9 February 2022

Prepared By

38 ES/ENII

4064 Hilltop Road

Tinker AFB, OK 73145-2713

1.0 SCOPE.

This Statement Of Objective (SOO) defines the requirement for the Contractor to engineer, furnish, install and test (EFI&T) new single mode (SM) fiber optic cables (FOC) to support connectivity from Information Transfer Building (ITB) 1101 to ITB 6901 at Keesler AFB

MS.

2.0 GENERAL REQUIREMENTS.

General requirements are included in the Supplemental Information document included as part of this requirement.

2.1 Period of Performance.

The period of performance for this project shall begin within 10 days of contract award, upon issuance of the Notice to Proceed (NTP) and proceed for 120 days.

3.0 SPECIFIC REQUIREMENTS.

The Contractor shall EFI&T thirty-six (36) strand SM fiber optic cables (FOC) to support connectivity from ITB1101 to ITB6901 at Keesler AFB MS.

The Contractor shall provide a Statement of Work (SOW) as part of their proposal incorporating all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this

SOO.

The Contractor shall comply with the current TIA telecommunication installation and testing commercial standard and base installation standards.

All equipment, supplies, and materials provided shall be new and not refurbished.

3.1 New Fiber Optic Distribution Panel (FODP)

The Contractor shall provide and install the following FODPs. Coordinate with 81 CS/SCXP for final mounting location within existing racks.

• ITB 1101: Install one (1) each 36-port FODP in the existing rack.

• ITB 6901: Install one (1) each 36-port FODP in the existing rack.

4.0 Outside Plant Requirements.

Any distances provided in this SOO are approximations and should NOT be used for ordering materials or determining duct lengths.

4.1 Outside Plant Installation.

This section describes the underground maintenance hole/conduit system, flexible geotextile multiple cell fabric inner-duct and copper and fiber optic cable installation requirements. The Contractor shall design and install Customer-Owned Outside Plant Telecommunications Infrastructure in according with TIA-758-B. Each cable installation shall be coordinated with the 81 CS/SCXP so that the impact on the building users is minimized to the greatest extent possible. The sequence of installation is at the Contractor’s discretion.

See the information provided below for reference and estimated distances of existing and proposed infrastructure and cables routes. This is only a proposed solution. The Contractor is to propose their own solution and recommendations pertaining to the accomplishment of this requirement in their proposal.

The Contractor shall install underground outside plant infrastructure as described below.

4.2 Infrastructure Installation.

The contractor shall install the following new infrastructure. All locations and distances are approximate.

4.2.1 New Hand holes.

The Contractor shall install one (1) 4’W x 4’L x 4’H (interior dimensions) hand hole (to be designated as HH-2801-4-1-A), and one (1) each LockDown Security Device with Abloy lock or equivalent. Coordinate with 81 CS/SCXP for final hand holes placement and numbering scheme.

4.2.2 Duct bank Infrastructure.

From To

Quantity Size (Inch)

Approx.

Distance

(Feet)

NOTES

HH-2801-4-1 New HH- 2801-4-1-A

2 4 500 Directional Bore

New HH- 2801-4-1-A

MH-03X 2 4 450 Directional Bore

MH-03X MH-2603-2 2 4 350 Directional Bore

MH-2603-1 MH-21 2 4 300 Directional Bore

4.2.3 Geotextile Inner-duct (or Innerduct).

Install 3”, 3-cell Geotextile Inner-ducts as shown at the table below. Each three cell shall have a separate thread color and one of the three cell must be detectable and routed up to the neck of the hole.

From To Quantity Approx.

Distance

(Feet)

Notes

HH-2801-4-1 New HH- 2801-4-1-A

3 500 In one of the new 4” conduits

New HH- 2801-4-1-A

MH-03X 3 450 In one of the new 4” conduits

MH-03X MH-2603-2 3 350 In one of the new 4” conduits

MH-2603-2 MH-2603-1 3 250 In vacant conduit

MH-2603-1 MH-21 3 300 In one of the new 4” conduits

MH-21 MH-137 3 400 In vacant conduit

MH-137 MH-103 3 300 In vacant conduit

MH-104B MH-104C 3 425 In vacant conduit

4.3 Fiber Optic Cable Installation.

The Contractor shall install single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable shall meet RUS 7 CFR 1755.900 criteria; shall comply with industry standards with regard to manufacturers’ cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC shall comply with industry standards with regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310 nm and 1550nm.

All fiber optic cables shall be installed in new or existing geotextile innerduct/innerduct.

4.3.1 From ITB 1101 to ITB 6901.

The Contractor shall install approximately 7000’ (including required maintenance loop(s)) of 36 strand SM FOC from ITB 1101 to ITB 6901. Terminate 36 strand SM FOC in the new 36-port FODP in ITB 1101 and in the new 36-port FODP in ITB 6901.

FROM TO Distance (feet) Notes

ITB1101 HH-116A 20 In vacant Geotextile Innerduct

HH-116A HH-2801-4-2 200 In vacant Geotextile Innerduct

HH-2801-4-2 HH-2801-4-1 400 In vacant Geotextile Innerduct

HH-2801-4-1 New HH-2801-4-1-A 500 In new Geotextile Innerduct

New HH-2801-4-1-A MH-03X 450 In new Geotextile Innerduct

MH-03X MH-2603-2 350 In new Geotextile Innerduct

MH-2603-2 MH-2603-1 250 In new Geotextile Innerduct

MH-2603-1 MH-21 300 In new Geotextile Innerduct

MH-21 MH-137 400 In new Geotextile Innerduct

MH-137 MH-103 300 In new Geotextile Innerduct

MH-103 MH-104 530 In vacant Geotextile Innerduct

MH-104 MH-104A 130 In vacant Geotextile Innerduct

MH-104A MH-104B 375 In vacant Geotextile Innerduct

MH-104B MH-104C 425 In new Geotextile Innerduct

MH-104C MH-104D 450 In vacant Geotextile Innerduct

MH-104D MH-17 100 In vacant Geotextile Innerduct

MH-17 MH-130 375 In vacant Geotextile Innerduct

MH-130 MH-131 375 In vacant Geotextile Innerduct

MH-131 ITB6901 100 In vacant Geotextile Innerduct

1.0 SCOPE.
2.0 GENERAL REQUIREMENTS.
2.1 Period of Performance.
3.0 SPECIFIC REQUIREMENTS.
3.1 New Fiber Optic Distribution Panel (FODP)
4.0 Outside Plant Requirements.
4.1 Outside Plant Installation.
4.2 Infrastructure Installation.
4.2.1 New Hand holes.
4.2.2 Duct bank Infrastructure.
4.2.3 Geotextile Inner-duct (or Innerduct).
4.3 Fiber Optic Cable Installation.
4.3.1 From ITB 1101 to ITB 6901.

File details come from the government source that posted it. Updated .