Attachment 1 - SOO Final.pdf
PDF 290 KB Posted
- Attached to
- 250 IS Storage Area Network (SAN)
- Solicitation number
- W50S8G26QOR03
- Issued by
-
Department of the Army National Guard
About this file
This is a Statement of Objectives (SOO) for the acquisition and integration of a Mount Rack Storage Filer System in a Sensitive Compartmented Information Facility (SCIF) environment at Kirtland Air Force Base, New Mexico, dated July 21, 2026. The contracting activity is the New Mexico Air National Guard's 250th Intelligence Squadron located at Building 1044.
The contractor must procure, install, configure, and migrate a highly available, redundant Enterprise Storage Filer solution delivering a minimum of 100TB usable total storage distributed across three separate filers with 2TB SLC Flash Storage minimum. The system must meet or exceed all current legacy system functions and capabilities, including the existing HPE MSA 2050 storage arrays (three units total) and two HPE ProLiant management servers. Technical requirements include redundant control modules, power supply units, cooling modules, internal storage, and iSCSI capability with seamless controller failover; minimum four 10Gbit SFP network connections per system capable of utilizing fiber adaptors; comprehensive disaster recovery solution with secure data replication, automated failover, and backup/restore processes; automatic tiered storage supporting multiple RAID levels; and independent archival capabilities. All physical work must comply with US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 and OSHA standards, with coordination through the Special Security Officer. The contractor must provide comprehensive administrative and operational training for two Government personnel and deliver complete site-specific Operations and Maintenance Manuals with architectural diagrams.
Execution must be completed within 30 days following documented receipt of all physical hardware during standard operational hours (Monday-Friday, 0700-1630 local time). All contractor personnel must maintain active Secret clearances and comply with DoD, Air Force, and Intelligence Community security directives. The entire system must be actively listed on the Air Force Approved Product List (APL) and successfully vetted through the Defense Intelligence Agency Supply Chain Risk Management (SCRM) process, with system warranty including a "Keep Your Drive" provision for failed drives. The contractor must implement a Quality Control Plan governing installation and conduct comprehensive system testing including high availability failover, disaster recovery validation, and load testing with results documented for Government User Acceptance Testing. All legacy materials, e-waste, and packaging must be removed and environmentally disposed of off-base, excluding security-governed storage media. Contractors must maintain active SAM.gov registration and comply with Small Business Act Section 8(d) subcontracting requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1.1 - SOO_2026.08.18.pdf | ||
| Attachment 3 - QA_2026.08.18.pdf | ||
| Attachment 2 - KAFB Site Visit Form.pdf | ||
| W50S8G26QOR03 - Combo_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVE
BUILDING 1044: Mount Rack Storage Filer System Acquisition & Integration (SCIF
Environment)
New Mexico Air National Guard
2251 Air Guard Drive S.E. Kirtland AFB, NM 87117
Date: 21 July 2026
Table of Contents 1 Purpose 2 Scope 3 Current Equipment 4 Technical & Operational Objectives
a. System Equivalency & Capacity
b. Disaster Recovery & Data Management
c. High Availability & Connectivity 5 Logistics, Safety & Site Operations
a. Workplace Safety & SCIF Migration
b. Material Disposition & Training 6 Security & Military Installation Access
a. Personnel Clearances & Base Access
b. AFNet, Supply Chain, & Data Sovereignty 7 Schedule, Work Hours & Execution
a. Work Hours & Holidays
b. Execution Window & Work Planning 8 Deliverables, Testing & Quality Assurance
a. Quality Control & System Testing
b. Operations & Maintenance Manuals 9 Contracting & Regulatory Compliance
a. Subcontracting Opportunities
b. SAM Registration
Statement of Objectives (SOO)
Mount Rack Storage Filer System Acquisition & Integration (SCIF Environment)
1 | P a g e
July 21, 2026
1 Purpose
The purpose of this acquisition is to procure, install, configure, and migrate a highly available, redundant Enterprise Storage Filer solution. The primary objective is to ensure resilient, high-performance data storage, tiering, archival, and disaster recovery (DR) capabilities while maintaining strict compliance with Air Force Network (AFNet) standards, Defense Intelligence Agency (DIA) supply chain security, and physical workplace safety protocols within a Sensitive Compartmented Information Facility (SCIF).
2 Scope
This requirement encompasses hardware delivery, logical configuration, network integration, disaster recovery implementation, robust system testing, and system administration training for a minimum 100TB storage environment distributed across three separate filers. The scope includes rigorous work planning, quality control, and the physical tear-down of legacy materials. The contractor shall un-rack and stage all legacy hardware as directed by the
Government; however, no legacy materials, components, or e-waste are authorized to leave the facility. All physical installation, migration, logical configuration, and material handover will occur strictly within the SCIF.
3 Current Equipment
The current Storage Area Network (SAN) infrastructure supporting the 250 IS environment is composed of three (3) HPE MSA 2050 storage arrays and two (2) dedicated management servers configured as follows:
System
Component
Hardware
Model
Quantity Role / Configuration Storage Media Per Array
Primary SAN
Storage
HPE MSA
2 Primary storage pool configured in a mirrored (high availability) architecture.
• 10 x 12 TB SAS Hard Drives•
2 x 2 TB SAS Management
Drives
Disaster Recovery
(DR) SAN
HPE MSA
1 Dedicated Disaster Recovery Site (DRS) node utilizing software-based replication to back up the primary configuration.
• 10 x 12 TB SAS Hard Drives•
2 x 2 TB SAS Management
Drives
Primary
Management
Server
HPE ProLiant
DL325 Gen10
1 Dedicated management server hosting orchestration software for the primary mirrored SAN configuration.
N/A (Compute/Mgmt)
2 | P a g e
July 21, 2026
DRS
Management
Server
HPE ProLiant
DL360 Gen9
1 Dedicated management server hosting replication and backup software for the
DRS SAN.
N/A (Compute/Mgmt)
4 Technical & Operational Objectives
The contractor shall offer and implement a solution that achieves the following operational capabilities, ensuring at a minimum that the offered system possesses the exact same capabilities, functions, and performance metrics as the legacy system, or better:
a. System Equivalency & Capacity
The minimum offered solution must meet or exceed all current legacy system functions, capabilities, and performance baselines. The architecture must deliver a minimum of 100TB
Usable Total Storage distributed across three separate filers, featuring a minimum of 2TB
SLC Flash Storage (or equivalent performance) and enabling full storage virtualization.
b. Disaster Recovery & Data Management
The contractor must integrate a comprehensive DR solution to support Continuity of
Operations (COOP), including secure data replication, automated failover, and robust backup/restore processes. Data management must support automatic tiered storage, allow the allocation of multiple RAID levels on the same storage tier, and implement independent archival capabilities.
c. High Availability & Connectivity
The system must ensure high availability through redundant control modules, redundant power supply units (PSUs), redundant cooling modules, and redundant internal storage, alongside redundant iSCSI capability with seamless controller failover. Connectivity requirements mandate a minimum of four 10Gbit SFP network connections per system, capable of utilizing fiber adaptors.
5 Logistics, Safety & Site Operations
The contractor shall execute the physical deployment in strict accordance with military safety and SCIF security protocols:
a. Workplace Safety & SCIF Migration
All physical work, heavy lifting, and rack installation must comply with the US Army Corps of Engineers (USACE) Safety and Health Requirements Manual EM 385-1-1, as well as applicable OSHA standards. The contractor is responsible for physically executing and
3 | P a g e
July 21, 2026 coordinating the movement of legacy filers/racks and the installation of new equipment inside the secure facility, working in close coordination with the Special Security Officer
(SSO).
b. Material Disposition & Training
The contractor is responsible for the removal and off-base environmental disposition of all non-salvageable materials, packaging, and legacy e-waste, excluding any storage media governed by security mandates. Additionally, the contractor must provide comprehensive administrative and operational training for two designated Government personnel within the secure facility.
6 Security & Military Installation Access
Contractor personnel must operate within strict DoD, Air Force, and Intelligence Community
(IC) constraints:
a. Personnel Clearances & Base Access
At a minimum, all contractor personnel performing on-site work must possess and maintain an active Secret clearance for the duration of the contract. Personnel must comply with all host Military Installation security directives, vehicle search protocols, and unescorted access procedures prior to arriving at the SCIF.
For Contractors that do not require CAC but require access to a DoD Facility and/or
Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center
Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (DODIO
2000.16V1_DAFI 31-145, DAFI 31-101 and DODM 5200.08v3_DAFMAN 31-101v3), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
For Contracts that require Handling or Access to Classified Information. For contracts that require handling or access to classified information, the contractor shall comply with FAR
Clause 52.204-2, Security Requirements, including the National Industrial Security Program
Operating Manual (DoD 5220.22-M) and applicable updates/changes. This clause involves access to information classified “Confidential/Secret/Top Secret” and requires contractors to comply with visitor Group Security Agreement (VGSA) when designated as a Visitor Group at all contractor operations located on Air Force/Air National Guard installations in accordance with this PWS. Contract personnel must be entered into the Defense Information
4 | P a g e
July 21, 2026
System for Security (DISS) and vendor will comply with paragraph1.6h above. A DD 254, DoD Contract Security Classification Specification, is required for all classified contracts.
Completion of localized security training (information protection related material) will be accomplished at the Wing/Unit level. Derivative Classification and Marking Classified CBTs may also be required as per assigned duties (i.e., SIPRNet).
b. AFNet, Supply Chain, & Data Sovereignty
The entire system offered must be actively listed on the Air Force Approved Product List
(APL). Furthermore, all equipment must be successfully vetted through the Defense
Intelligence Agency (DIA) Supply Chain Risk Management (SCRM) process. To ensure strict data sovereignty, the system warranty must include a "Keep Your Drive" provision where failed drives will not be returned to the vendor.
7 Schedule, Work Hours & Execution
To minimize mission impact, all execution must adhere to a strict operational schedule:
a. Work Hours & Holidays
All on-site work must be performed during normal operational hours, defined as Monday through Friday, 0700 to 1630 (7:00 AM to 4:30 PM) local time. No work shall be performed on observed Federal Holidays unless explicitly pre-authorized in writing by the Contracting
Officer (KO) and coordinated with the SSO.
b. Execution Window & Work Planning
All on-site execution, including tear down, rebuild, testing, training, and final hand-off, must be completed within thirty (30) days following the documented receipt of all physical hardware. Prior to the commencement of this 30-day window, the contractor must submit a formal Work Plan detailing daily milestones, SCIF coordination steps, safety measures, and lead time accounting.
8 Deliverables, Testing & Quality Assurance
The contractor must validate the system's operational readiness and provide formal documentation prior to hand-off:
a. Quality Control & System Testing
The contractor shall implement a Quality Control Plan (QCP) to govern the installation, ensuring all hardware and network integrations meet OEM specifications and AFNet standards. Comprehensive system testing, including HA failover, DR validation, and load
5 | P a g e
July 21, 2026 testing must be conducted, with results documented and provided to the Government for User
Acceptance Testing (UAT).
b. Operations & Maintenance Manuals
Upon final hand-off, the contractor must deliver complete, site-specific Operations and
Maintenance (O&M) Manuals that include detailed architectural diagrams and administrative procedures.
9 Contracting & Regulatory Compliance
The contractor must maintain full compliance with federal acquisition standards:
a. Subcontracting Opportunities
In accordance with Section 8(d) of the Small Business Act (15 U.S.C. § 637(d)), the contractor shall agree to carry out the policy that small business concerns, veteran-owned, and minority-owned businesses shall have the maximum practicable opportunity to participate in the performance of contracts let by any Federal agency. If the contract exceeds the regulatory threshold, a formal Subcontracting Plan may be required.
b. SAM Registration
In accordance with the Federal Acquisition Regulation (FAR), all prospective contractors must be registered and maintain an active status in the System for Award Management