Attachment 1-SOCKEYE (WPB 87) DS FQ3 SCP 20ER0_BLANK.xls

XLS spreadsheet 50 KB Posted

Attached to
USCGC SOCKEYE DS FY20
Solicitation number
70Z080-20-Q-P4564400
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC SOCKEYE (WPB-87) DOCKSIDE AVAILABILITY FY2020
Contractor's Name:
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Grey Water Holding Tank(s), Clean and InspectJOB1$0.00
D-002Sewage Holding Tank(s), Clean and InspectJOB1$0.00
D-003Grey Water Piping, Clean And FlushJOB1$0.00
D-004Sewage Piping, Clean And FlushJOB1$0.00
D-005HVAC 2-Stage Intake Separator, ModifyJOB1$0.00
D-006Galley Range, Install NewJOB1$0.00
D-007Insulation, RenewJOB1$0.00
D-008Suction Valve, Sewage System, RenewJOB1$0.00
D-009Foundation, Boat Winch, ModifyJOB1$0.00
D-010U/W Body, Diver Clean and InspectJOB1$0.00
D-011Intrusion Detection System, RenewJOB1$0.00
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00
Composite Labor RateJOB1$0.00

&C(01/17/2020)

Rev-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .