Attachment 1_RFQ.pdf
PDF 232 KB Posted
- Attached to
- Three (3) 10K# Forklift Rental
- Solicitation number
- N3904023Q0115
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N3904023Q0115 Combined Synopsis Sol.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
N3904023Q0115
N39040-17-T-
Please Provide FOB Destination Pricing Page 1 of 5
THIS IS NOT AN ORDER
PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE
REFERENCE # N3904023Q0115 DUE DATE: 03/31/2023 08:00 AM ET
From: Portsmouth Naval Shipyard Your company info:
madalyn.r.stella.civ@us.navy.mil Name:
Contracting, Code 410.1 POC:
Portsmouth, NH 03801-2590 (P) PHONE: 207-994-0102 Email:
Cage Code:
BUSINESS SIZE: __SMALL __LARGE PAYMENT TERMS ______%______DAYS
NAICS 532490
MOBILIZATION TIME: _________ARO PRICES DERIVED FROM (CHECK ONE)
F.O.B. DESTINATION, Y____N____ ___COMMERCIAL PRICE LIST DATED
IF NO, SHIPPING COST__________. ___INTERNAL PRICE LIST DATED
___OTHER ( PLEASE EXPLAIN )
Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF (www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____
*Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.
_X__ If checked, to be awarded on an “All or None” basis, and CPARS evaluation procedures apply.
YOUR SIGNATURE___________________________________DATE________________________
ITEM/CLIN DESCRIPTION QTY Total
Base: Period of Performance: 05/05/2023 – 11/05/2023 0001 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
0002 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
0003 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
Option Year One: Period of Performance: 11/05/2023 – 05/05/2024 1001 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
1002 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
1003 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work mailto:madalyn.r.stella.civ@us.navy.mil http://www.wawftraining.com/
N39040-17-T-
Please Provide FOB Destination Pricing Page 2 of 5
Option Year Two: Period of Performance: 05/05/2024 – 11/05/2024 2001 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
2002 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
2002 10K# Counterbalance, Pneumatic, IC Forklift 1 EA
In Accordance with the Statement of Work
***Bid submittals will include the make and model of the machine being quoted, a checklist of each item in the unit specifications section of the statement of work denoting whether the unit meets the requirement, and the actual dimension for any item with a specific measurement requirement. If supporting information includes multiple models, the vendor shall clearly state the model number of proposed unit and redact all information not applicable to proposed unit.
• Period of Performance: 05/05/2023 – 11/05/2023
Option Period One: 11/05/2023 – 05/05/2024 Option Period Two: 05/05/2024 – 11/05/2024
• Place of performance is: Portsmouth Naval Shipyard, Kittery ME.
• For evaluation purposes, please provide any applicable procedures and technical information. If no information is provided, your quotation may be determined to be unresponsive.
• Award may be made on the basis of adherence to the schedule and/or soonest mobilization.
• Please provide published commercial labor rates and breakdown of total prices, if applicable, for Price Justification purposes.
• See Below for Detailed Statement of Work and Applicable Clauses.
METHOD OF PROPOSAL SUBMISSION:
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.
System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes should include this form filled out in its entirety (highlighted yellow fields are required).
http://www.sam.gov/
N39040-17-T-
Please Provide FOB Destination Pricing Page 3 of 5
STATEMENT OF WORK:
Requirements:
The Portsmouth Naval Shipyard requires supplemental material handling equipment with the potential of one or more option periods. CLIN 0001 – 0003 are for an initial term of 6 months, with each machine having two additional option periods of 6 months each.
Bid submittals will include the make and model of the machine being quoted, a checklist of each item in the unit specifications section below denoting whether the unit meets the requirement, and the actual dimension for any item with a specific measurement requirement. If supporting information includes multiple models, the vendor shall clearly state the model number of proposed unit and redact all information not applicable to proposed unit.
Unit Specifications:
All CLINs
• Capacity/type: 10K# capacity @ 24” L.C., counterbalanced, sit-down, forklift.
(10K# preferred, up to 15K# acceptable)
• Minimum lift height: 102”
• Max collapsed height: 102”
• Max outside turning radius: 120”
• Forks: standard tip and taper, MAX Width: 6”, MAX thickness: 2.5”, Length: 48”-52”
• Power type: Internal combustion (Gasoline or Diesel)
• Shall be no older than 7 years
• Pneumatic, solid pneumatic, or foam filled tires
• Enclosed cab with heater, defrost, and wipers
• A minimum of one air circulating fan will be installed in the cab if air-conditioning is not included.
• Any Diesel unit(s) will be equipped with glow plugs or other system to assist in cold weather starting. (Block heaters are not an acceptable means of compliance due to a lack of electrical power availability.)
• The carriage will be equipped with side-shift.
• Will be equipped with hydraulic fork positioners.
• Light package to include front and rear working lights.
• Designated attachment points for lifting with a crane are preferred, but not required.
• Will have manufacturer’s capacity data plate containing safe working load and maximum reach height at a minimum.
• Operator controls shall be properly and clearly marked
• An operator’s manual will be in the machine
General Service Terms:
Rentals will include unlimited usage hours within the contracted period of performance.
Delivery and pick-up of the equipment is the responsibility of the contractor, to include costs.
N39040-17-T-
Please Provide FOB Destination Pricing Page 4 of 5
Equipment shall be delivered in fully functional, safe operating condition. It will be in compliance with any and all applicable laws governing internal combustion material handling equipment and its operation in the State and/or jurisdiction where the rental will be used. All units for use in California will have an CARB EIN clearly visible on each machine.
The contractor shall notify the Contracting Officer’s Representative (COR) or Technical Point of Contact a minimum of 48 hours prior to delivery of units. Delivery will occur on or before the required start date noted in the period of performance. Initial delivery will take place during normal first shift hours. The vendor should account for potential delays at the pass-office and security when planning the delivery. For the purposes of this contract, normal first shift hours will be considered week-days that are not federal holidays, between the hours of 06:00am and 02:30pm.
The Contractor will be able to deliver equipment outlined in any option CLINs within 72 hours of notification of intent to exercise the option(s) by the Government.
An inspection of each forklift shall be performed by a shipyard licensed operator using a PNSY provided MHE Inspection Sheet on delivery. Any machines not meeting the requirements of this statement of work, or having defects or damage that negatively affect the operation of the machine will be refused.
If there are deminimis defects or damage found that are determined to be superficial in nature and that do not affect the operation of the machine, they will be noted on the inspection form. The Vendor’s representative will sign the PNSY inspection form or attest in writing that the damage was pre-existing and does not affect the operation of the machine. This will be completed before the unit is accepted by the Government.
The rental period does not begin until the government has accepted the forklift.
To be allowed onto a Government Shipyard, personnel must be US citizens and in possession of appropriate personal identification and proof of US citizenship. Allowable documentation of US citizenship may include an original copy of an official government issued Certificate of Birth (with raised seal), Certificate of Naturalization (with raised seal), US passport, DD214 (if the form indicates U.S.
Citizenship), or FS-240. If the individual has had a name change since birth (other than by marriage), they will also need the court document showing the change. This list is for reference only and is subject to change without notice. The contractor should verify requirements with their on base contact prior to attempting to access the facility.
Access to any controlled areas will require individuals to obtain a Defense Biometric Identification System (DBIDS) card at the Pass and ID office prior to entry.
Vehicular access requires a non-expired driver’s license and appropriate vehicle identification and registration. The transport vehicle must have the company’s name and/or logo prominently displayed.
To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear to include safety shoes, hard hat, eye protection, and hearing protection at a minimum.
Electronic devices with cameras are not allowed inside the controlled industrial area (CIA). In the event that a repair is needed inside the CIA that renders the machine immobile, the contractor will make arrangements to perform the maintenance in, or have the machine towed from, that area without the
N39040-17-T-
Please Provide FOB Destination Pricing Page 5 of 5 need for any specialty electronics equipped with cameras. Any fees or expenses associated with moving or towing will be the contractor’s responsibility.
In the event that camera equipped tools (computer/tablet/etc.) are the only feasible option to perform a repair on a machine that cannot reasonably be removed from the CIA, the contractor will work with their Shipyard contact to obtain the necessary security approvals.
The contractor shall be responsible for all preventative maintenance, repairs, and the necessary materials to complete them for any maintenance issues not arising out of abuse or negligence by the Government. The government shall be responsible for daily fluid level checks; however, the contractor shall be responsible for adding fluids to the equipment to ensure the loss of fluid is not due to a more serious mechanical issue.
All service shall be provided within twenty-four (24) hours of notification to the contractor. In the event the equipment cannot be returned to service within the twenty-four (24) hour period, a comparable replacement shall be provided by the contractor within forty-eight (48) hours of the initial notification at no charge to the Government.
The Contractor is responsible for the disposal of any waste generated as a result of maintenance.
The Contractor shall validate all completed repairs by either signing the appropriate PNSY provided MHE Inspection Sheet, or providing a completed repair order.
If unplanned maintenance issues become frequent (“frequent” to be determined by the
Government), the Government may request to have the equipment replaced with a more reliable unit in accordance with the unit specifications outlined herein.
Any routine preventative maintenance will be completed during normal first-shift hours unless alternative arrangements are made ahead of time.
The contractor shall provide liquid spill protection to the ground surface during all maintenance and repairs. Any/all spills shall be contained and cleaned up prior to leaving the site.
If during use, a liquid spill is caused by a broken or leaking line or some other system on the contractor’s equipment, the installation spill team will be alerted to contain the spill until the contractor can make the necessary repairs. It shall be the responsibility of the contractor to reimburse the Government for containing the spill.
If fluid leaks become frequent (“frequent” to be determined by the Government), the government may request to have the equipment removed from the shipyard and replaced with a more reliable unit in accordance with the unit specifications outlined herein.
******** END OF REQUEST FOR QUOTE ********
File details come from the government source that posted it. Updated .