Attachment 1 PWS Sample Analaysis.pdf
PDF 1 MB Posted
- Attached to
- Water Sample Analysis
- Solicitation number
- FA527021Q0087
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA527021Q0087.pdf | ||
| Attachment 2 Price list.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Based Work Statement
For
FY21 Sample Analysis
U.S. Army Garrison Okinawa
Directorate of Public Works
Date: 22 March 2021
FA527021Q0087
Attachment 1 PWS
PERFORMANCE BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1. DESCRIPTION OF SERVICES 3
2. SERVICE SUMMARY 5
3. GOVERNMENT FURNISHED PROPERTY AND SERVICE 5
4. GENERAL INFORMATION 5
5. APPENDICES 14
FA527021Q0087
1. DESCRIPTION OF SRVICES
The contractor shall provide all management, equipment, tools, supplies and labor/manpower and appropriate license(s)/qualification(s) necessary to provide sample bottles, preservatives, laboratory analyses, data processing and result report as defined in the Japan Environmental
Governing Standards (JEGS).
1.1. BASIC SERVICES
1.1.1. The contractor shall provide sample bottles with preservatives, laboratory analyses and result report for the parameters as described in Appendix B. The contractor shall be able to supply shipping fees, shipping containers, packing materials, ice/refrigerants for all samples analyzed. The contractor shall supply all shipping labels and other labels designated to meet all regulatory shipping requirements.
1.1.2. The contractor shall deliver sample bottles with preservatives to the locations as it is indicated by the government. The contractor shall receive sample bottles containing collected sample media at the locations as it is indicated by the government. The government shall determine the quantity of the sample bottles to the contractor. The contractor shall coordinate with Torii Station Point of Contact (TS-POC) to schedule the delivery and receipt date of sample bottles.
1.1.3. The contractor shall provide pre-cleaned sample bottles in order to avoid cross-connection.
Each sample bottle is labeled with parameters. Single sample bottles are used to collect samples for multiple analyses in the same analyte group. Samples are preserved and analyzed by the methods or equivalent methods indicated in Appendix B {Analytical Parameter and Method: US
Environmental Protection Agency (EPA), Japanese Industrial Standards (JIS) or Government of
Japan (GOJ) methods}.
1.1.4. The contractor shall provide a point of contact (POC) that shall be responsible for the performance of the work. The POC shall coordinate deliverables, schedules and logistics as required under the terms of this contract. The POC shall keep TS-POC informed of the project’s progress as needed. The POC shall have the capability to read, write, speak and understand
English and have capability to comprehend the technical information provided in English by the
U.S. Government.
1.1.5. The laboratory result report shall be written in English. The contractor shall provide to the
USAG Okinawa, Directorate of Public Works, Environmental Division, one digital copy and one hard copy of report. Information required in addition to the test results will include but not limited to the following: test methods; date of analysis; sampling location, date and time;
contractor’s name and address; phone number; fax number; certification/documentation that the laboratory is certified to conduct the required analytical method as identified in Appendix B.
Submittals (laboratory analyses) shall have authenticating stamps and/or signatures. The submission of result reports shall be within 21 calendar days after receipt of samples.
1.2. QUALIFICATIONS
1.2.1. The contractor shall provide certification from appropriate agencies to the Government indicating that the laboratories are validated and/or certified to conduct the methods for the analysis. US analytical laboratories must be certified and/or accredited by EPA, State
Laboratory Certification Program, or nationally recognized laboratory accreditation body
(NELAP) and Japanese analytical laboratories must be a laboratory registered/certified to conduct these analyses by the Japanese national, prefecture and/or local government (e.g.
Kankyo Keiryo Jigyousho with Kankyou Keiryoushi).
1.3. CRITERIA AND REGULATIONS
Applicable regulations and criteria are the following:
1.3.1. Department of Defense Japan Environmental Governing Standards (JEGS), December
1.3.2. U.S. Army Regulation (AR) 200-1, Environmental Protection and Enhancement, December 2007.
1.3.3. U.S. Army Regulation 40-5, Public Health Program, May 2020.
1.3.4. Department of the Army Pamphlet 385-61, Toxic Chemical Agent Safety Standards, November 2018.
1.3.5. U.S. Army Regulation 420-1, Army Facilities Management, February 2008/RAR, August
2012.
1.3.6. U.S. Army Garrison Japan Regulation 190-13, Installation Access and Control Procedures, May 2019.
1.3.7. U.S Army Corps of Engineers EM 385-1-1, Safety and Health Requirements Manual, November 2014.
1.4. SUBMITTALS
1.4.1. Submit a copy of the Laboratories registration/certification as described in section 1.2.1.
1.4.2. The Contractor shall submit a result report of the sample analysis as described in section
1.1.5.
1.4.3. The Contractor shall submit System of Award Management (SAM) as described in section
5.16.
2. SERVICE SUMMARY
Performance Objective PWS Para Performance Threshold
Delivery / receipt / shipping of sample bottles
1.1.1, 1.1.2 100 % of delivery / receipt / shipping to be provided on time.
Sample analysis 1.1.3 100% analysis to be provided on time.
Analysis result report 1.1.5 100% result report to be provided on time.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES
There is no government furnished property and services to be provided to the contractor. Any damages to the U.S. Government property caused by the contractor shall be restored at no cost to the U.S. Government.
4. CONTRACTOR’S FAILURE TO PERFORM
4.1. If contractor fails to perform required services within the specific limitations, the government may,
4.2. Accept the services at a later date.
4.3. Refuse to accept the services at a later date (in which case the government will bear no cost and make no payment for the missed service).
4.4. Procure the missed service, upon such terms and conditions as the contracting officer deems appropriate, from an alternate, responsible firm and the contractor shall be liable to the government for any excess costs incurred and to continue the performance as required thereafter.
5. GENERAL INFORMATION
5.1. QUALITY ASSURANCE
The government will periodically evaluate the Contractor’s performance by appointing a Quality
Assurance Personnel (QAP) representative(s) to monitor performance to ensure services are received. The Government QAP will evaluate the Contractor’s performance through intermittent on-site inspections and receipt of complaints from government personnel. The Government may inspect each task as completed appropriate because of repeated failures discovered during inspections or because of repeated customer complaints. Likewise, the Government may decrease the number of inspections if merited by performance. The Government will also investigate complaints received from various customers located on the installations. The
Contractor shall be responsible for initially validating customer complaints. However, the
Government QAP shall make final determination of the validity of customer complaint(s) in cases of disagreement with customer(s).
5.1.1. The QAP is the authorized government representative(s) who will perform assessments to the contractor’s performance.
5.1.2. The QAP(s) or alternate(s) will inform the contract manager in person when discrepancies occur and will request corrective action.
5.1.3. Any matter concerning a change to the scope, prices, terms or conditions of this contract shall be referred to the Contracting Officer (CO) and not to the QAP(s).
5.1.4. The services to be performed by the contractor during the period of this contract shall at all times and places be subject to review by the CO or authorized representative(s).
5.2. SECURITY REQUIREMENTS
Security and base access requirements are contained in clause 5352.242-9000 “Contractor
Access to Air Force Installations.” Except U.S. military installations where the required services are performed, only two (2) contractor employees (contract manager and its alternate) shall require for base pass for access to Kadena Air Base. Anticipate delays in getting commercial vehicles on base and allow time for commercial vehicles to reach their destination by driving designated routes at posted speed limits throughout the base. Procedures for commercial vehicle access to the base are subject to change without prior notice.
5.2.1. ID Passes, Badges and Vehicle Stickers. The contractor is responsible to obtain such clearances and/or passes as required for his/her employees to enter the U.S. military installations prior to start to work. The contractor is responsible to obtain such clearances and/or passes as required for his/her employees to enter the U.S. military installations prior to start to work. The contractor shall be responsible for all passes issued to his/her employees under this contract.
Applications shall be coordinated through the CO or designated representative. At the time of application, Security Forces may conduct a background check on employees. Upon termination of employment, the contractor shall be responsible for returning identification cards and base passes to Security Forces within 24 hours.
The contractor shall submit a request for base passes for his employees to the 18th Contracting
Squadron, Attention: 18 CONS/PKB, Kadena Air Base, for recommendation of approval by the
Pass and ID Section. After approval from 18 CONS/PKB, the contractor shall follow the instructions for acquiring designated pass ID for entry into applicable Marine and Navy facilities at Camp Foster, Bldg 456, at Defense Switched Network (DSN) 645-2239/7519 or from off base dial 098-970-2239/7519.
The contractor shall follow the instructions for acquiring designated pass ID for entry into Army
Facilities (Torii Station, Naha Port and POL Facilities=Kuwae Tank Farm #1 & 2, Chimuwan
Tank Farm #1, 2 & 3 and White Beach Tank Farm) from Torii Station Pass Office, at Bldg 218, Torii Station, at DSN 652-4688 and from off base dial 098-961-7777 (Operator) and dial 652-
4688 or directly to 098-953-4688.
FA527021Q0087
Contractor personnel desiring entry into Petroleum Oil Lubricants (POL) facilities (Kuwae Tank
Farm #1 & 2, Chimuwan Tank Farm #1, 2 & 3 and White Beach Tank Farm) must process the application documents through DLA-Energy Okinawa and then to Torii Station Pass Office.
DLA-Energy Okinawa is located outside of Kadena Air Base gate 3. The application documents shall be submitted to Defense Logistics Agency-Energy Okinawa (DLA-Energy Okinawa), Bldg
53115B at DSN 315-234-0936 or from off base dial the operator at 098-938-1111 (Operator) and after the tone changes, dial 315-234-0936.
5.3. PHYSICAL SECURITY
The contractor shall be responsible for safeguarding all government property provided for contractor use (if applicable). At the close of each work period, government facilities, property, and materials shall be secured.
5.3.1. Key Control (When applicable). The contractor shall establish and implement methods of ensuring that all keys/key cards issued to the contractor by the government are not lost or misplaced and are not used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall coordinate with the TS-POC to obtain keys for work areas that are fenced-in. The contractor shall return the keys to the TS-POC before close of business every day. Failure to do this may result in refusal of key use by the government.
5.3.1.1. Loss of keys report. The contractor shall immediately report the loss of a duplicate key to the TS-POC.
5.3.1.2. Loss of keys. In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon written direction of the CO, re-key or replace the affected lock or locks;
however, the government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the government and the total cost deducted from the monthly payment due the contractor.
5.3.1.3. Prohibit use keys. The contractor shall prohibit the use of keys issued by the government by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.
5.3.2. Lock Combinations. The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
5.3.3. Secured Areas. The contractor shall clean designated facilities during normal working hours only. The authorized contractor to perform the secured areas will be escorted by an
FA527021Q0087
appropriate government official, particularly at buildings #100/105, Torii Station. If access to the secured areas is delayed or not available, the contractor shall perform other duties.
5.4. HOURS OF OPERATION
5.4.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: 0800 thru 1800 hrs. The contractor may work, with prior approval of the CO, extended hours to ensure timely completion of work at no additional cost to the government.
5.4.1.1. Recognized Holidays. The contractor is not required to provide service on the following days: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Independence
Day, Labor Day, Columbus Day, Veterans Days, Thanksgiving Day, and Christmas Day. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
5.4.1.2. Emergency Hours of Operations. The contractor may work besides the normal work hours and holidays. The contractor shall coordinate and get prior approval by TS-POC or CO to work during emergency hours of operations.
5.5. CONSERVATION OF UTILITIES
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
5.5.1. Lights. Lights shall be used only in areas where and when work is actually being performed.
5.5.2. Prohibition to change. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
5.5.3. Water faucet. Water faucets or valves shall be turned off after the required use has been accomplished.
5.5.4 Government telephones. Government telephones shall be used only for official government business.
5.6. RECORDS
The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS or required by the provisions of a mandatory directive listed in Applicable Publications and Forms. If requested by the government, the contractor shall provide the original record or a reproducible copy of any such record within five working days of receipt of the request.
FA527021Q0087
5.7. ENVIRONMENTAL CONTROLS
5.7.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Japan Environmental Governing Standards (JEGS), at the web site follows:http://www.navfac.navy.mil/content/dam/navfac/NAVFAC%20Pacific/NAVFAC%20Fa r%20East/PDFs/PWD_Yokosuka_EVfiles/2012%20JEGS.pdf, Department of Defense, prefectural and local environmental laws and regulations and requirements regarding environmental protection. In the event environmental laws change during the term of this contract, the contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the contractor shall inform the Contracting
Officer pursuant to notice requirements and negotiate a modification to the contract.
5.7.2 Notification of Environmental Spills. If the contractor spills or releases any substance contained in 40 CFR 302 into the environment, the contractor or its agent shall immediately report the incident to Army Fire Department at 911 and the TS-POC. The liability for the spill or release of such substances rests solely with the contractor and its agent. The contractor is responsible for spill clean-up, remediation and disposal in accordance with appropriate laws and regulations.
5.7.3 Use of Hazardous Materials. The contractor’s use of any hazardous materials will require the submittal of a Safety Data Sheet (SDS) in English and in Japanese for each item utilized. The contractor shall prepare to obtain the approval through the TS-POC from the Fire Department, Safety and the Environmental Office prior to the use of the item. The contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. The contractor shall be responsible for the proper handling, labeling, storage and disposal of hazardous materials in accordance with all existing laws and regulations set forth by the Prefecture Government of Okinawa, Japan. Storage of hazardous material on the installation is prohibited and all hazardous material will be removed from the installation at the end of each work day.
5.8. GOVERNMENT OBSERVATIONS
Government personnel, other than the CO and TS-POC, may from time to time, with the CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.
5.9. SAFETY REQUIREMENTS
In performing work under this contract, the contractor shall:
5.9.1 Conformation. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
5.9.2 Safety measures. Perform work in a safe manner as required by OSHA 2206, General
Industry, Occupational Safety and Health Standards (29 CFR 1910) http://www.osha.gov/, JEGS
FA527021Q0087
by US Force Japan and general safety requirements of EM 385-1-1, dated 30 November 2014, “US Army Corps of Engineers, Safety and Health Requirements Manual”. See web site address, http://www.usace.army.mil/Safety-and- Occupational-Health/Safety-and-Health-Requirements-
Manual and click Complete EM385-1-1.
5.9.3 Safety Plan. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.
5.9.4 Prevention of damage. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
5.9.5 Subcontractors. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
5.9.6 Emergency service phone. Ensure personnel have the following on-base emergency services phone numbers programmed into their cellphones:
Security Police and Fire Department:
While working at any locations on base:
From On-base (Use DSN Phone): 911
From Off-base: 098-911-1911 From Cell Phone: 098-911-1911
5.9.7. Records and Report. Record and report promptly (within one hour) to the CO or TS-POC all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
5.9.8. Accident and mishap. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.
5.9.9. Investigation. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
5.9.10. Cooperation. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
5.9.11. Safety hazard. The contractor will be responsible for instructing his employees in safety measures considered appropriate. The contractor shall not permit placing or use of any equipment in traffic or other locations in such a manner as to create safety hazards. Whenever applicable, the contractor will provide and place appropriate warning signs at work areas and its removal after completion of work.
5.9.12. Safety precautions. All safety precautions shall be exercised when working in and around
POL storage facilities. All contractor equipment shall be equipped with proper safety and noise-limiting devices and shall be kept in safe operating condition at all times.
5.9.13. Maintenance of vehicles. All contractor vehicles shall be in good mechanical and safe operating condition. All vehicles shall keep dry chemical type fire extinguishers on each vehicle.
These vehicles are subject to inspection at any time.
5.9.14. Non-smoking. All contractor employees entering POL areas shall not have matches or lighters in their possession. Smoking is prohibited at POL Facilities (Kuwae Tank Farm 1, 2, Chimuwan Tank Farm 1, 2 & 3, White Beach Tank Farms).
5.10 CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING
CRISIS IAW DoDI 3020.41
IAW AFI 63-124, para 2.7.1, and DODI 3020.37 this requirement is not considered mission essential.
5.11. PHASE OUT
5.11.1 Familiarization. If there is a change in contractor or if the operation reverts to in-house, the incumbent contractor will provide familiarization, to the government or the follow-on contractor, whichever the case may be, for 30 days after receipt of a notice from the CO. During the phase-out familiarization period, the incumbent will be fully responsible for the operation of the required services.
5.11.2. Site Visit. The government reserves the right to conduct site visits in all contractor operated facilities in conjunction with the solicitation of offers for the follow-on contract. In the event the follow-on contract is awarded to other than the incumbent, the incumbent contractor will cooperate to the extent required to permit an orderly change over to the successful contractor.
With regard to the successor contractor’s access to incumbent employees, a recruitment notice may be placed in each facility.
5.12. PUBLICATIONS
5.12.1. Compliance. Compliance with all publications, regulations and operating instructions provided by the government is required when:
5.12.2. Material expediting. They pertain to the procedures for materials expediting herein and where the contractor is authorized by the performance work statement to accomplish the work specified in the publication, regulation or operating instructions.
5.12.3 Publications. The publications prescribe USAF policies, use of materials, procedures and processes applicable to the work requirements.
5.12.4 Requirement of the latest version. The contractor is required to acquire and work on the latest version of the publication.
5.13. CONTRACTOR PERSONNEL
5.13.1. Contract Manager. The contractor shall provide a contract manager and alternate contract manager (responsible in the absence of the contract manager) who shall be responsible for the performance of the services. The names of the contract manager and alternate(s) shall be provided to the CO in writing prior to the beginning of the first performance period. The contract manager and alternate(s) must be able to read, write, speak, and understand English.
5.13.2. Authority of the contract manager. The contract manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
5.13.3. Availability of the contract manager. The contract manager or his/her alternate shall be available on work sites during the normal hours of operation for the CO, TS- POC, and other government personnel designated by the CO for any matters and issues concerning the contract.
5.13.4. Contractor Employees. The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
5.13.4.1. Clothing. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in English.
5.13.4.2. Restriction of Employee. The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest.
Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500- 7-R Joint Ethics Regulation. The contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies in AFI 64-106.
5.13.4.3. Military personnel. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
5.14. JAPANESE ROAD LAWS
5.14.1. Local Laws. The contractor shall comply with Japanese Road Laws while on US Military installations to specifically include: Article 43, The Road Law (Japan) (prohibited acts relative to roads). No person shall commit the following described acts:
5.14.1.1. Damage to the road. Damaging the road, causing roads to be littered with debris, polluting the roads with debris or fall-out from motor vehicles or otherwise defacing roads unreasonably or without due cause.
5.14.1.2. Article 43-2. Article 43-2 (Measures to be taken to prevent cargo or things loaded on motor vehicles from falling out)
5.14.1.3. Prevention of accidents. The agency managing a road may when there is reasonable cause for him to feel that items or cargo being carried in or on a motor vehicle may fall out and damage, pollute, or otherwise deface the road in such manner as to hinder or obstruct the traffic, order the operator of the vehicle in question to take steps or measures necessary to prevent occurrence of such hindrance by stopping operation of the vehicle, or correcting the method of loading or traveling or operation of the vehicle.
5.15. REQUIRED INSURANCE by JAPANESE LAW
5.15.1. Insurance. The Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance on each vehicle used by the
Contractor at the work site.
5.15.2. Example of payment. Automobile Property Damage Insurance Amount:
¥3,000,000 or Dollar equivalent Bodily Injury Insurance Amount: ¥30,000,000 or Dollar equivalent.
5.15.3. Inspection. All vehicles must be properly inspected/insured in accordance with Japanese
Compulsory Insurance (JCI) requirements.
5.16. SYSTEM OF AWARD MANGEMENT (SAM)
The Contractor will be asked to input information in regards manpower and cost related information in the System of Award Management (SAM) (https://www.sam.gov).
5.17. RELEASE OF INFORMATION
The information developed, gathered, and assembled in fulfillment of the contract required as defined in or related to the PWS shall not be released by the Contractor, their consultants, subcontractors or associates without prior coordination and approval by the CO. The contractor information developed, gathered, and assembled in fulfillment of the contract requirements as defined or related to the PWS will become the complete property of the Government. The
FA527021Q0087
Contractor shall not use the information for any purpose at any time without the written consent of the CO. The Contractor or his subcontractors shall not make available to the news media or publicly disclose any data generated or reviewed under this contract. The Contractor shall not release any news articles concerning this project without the consent of the CO. When approached by the news media, the Contractor shall refer all questions to the CO and TS-POC for response.
6. APPENDICES
Appendix A: Acronyms and Abbreviations List
Appendix B: Analytical Parameter and Method Table
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
Acronym/Abbreviation Definition
CO Contracting Officer
EPA US Environmental Protection Agency
GOJ Government of Japan
JEGS Japan Environmental Governing Standards
JEA Japan Environment Agency
JIS Japanese Industrial Standards
MOE Ministry of the Environment
POC Point of Contact
POL Petroleum Oil Lubricants
QAP Quality Assurance Personnel
SAM System of Award Management
SDS Safety Data Sheet
TS-POC Torii Station Point of Contact
APPENDIX B
Analytical Parameter and Method Table
Table 1. Analytical Parameter and Method (Drinking Water)
No Analytical Parameter Method
1 Total Coliforms EPA SM9223
2 Arsenic
EPA 200.8
3 Antimony
4 Asbestos EPA 100.2
5 Barium
EPA 200.8
6 Beryllium
7 Cadmium
8 Chromium
9 Copper
10 Cyanide EPA 335.4
11 Fluoride EPA 300
12 Lead
EPA 200.8 13 Mercury
14 Nickel
15 Nitrate
EPA 300
16 Nitrite
17 Selenium
EPA 200.8 18 Sodium
19 Thallium
20 Alachlor EPA 525.2
21 Aldicarb
EPA 531.2 22 Aldicarb sulfone
23 Aldicarb sulfoxide
24 Atrazine
EPA 525.2
25 Benzo(a)pyrene
26 Carbofuran EPA 531.2
27 Chlordane EPA 505
28 Dalapon
EPA 515.3
29 2,4-D
30 1,2-Dibromo-3-chloropropane (DBCP) EPA 504.1
31 Di(2-ethylhexyl) adipate
EPA 525.2
32 Di(2-ethylhexyl) phthalate
33 Dinoseb EPA 515.3
34 Diquat EPA 549.2
35 Endrine EPA 525.2
36 Endothall EPA 548.1
37 Ethylene dibromide (EDB) EPA 504.1
38 Glyphosate EPA 547
39 Heptachlor EPA 525.2
FA527021Q0087
40 Heptachlorepoxide
EPA 525.2
41 Hexachlorobenzene
42 Hexachlorocyclopentadiene
43 Lindane
44 Methoxychlor
45 Oxamyl (Vydate) EPA 531.2
46 PCBs (as decachlorobiphenyls) EPA 505
47 Pentachlorophenol
EPA 515.3
48 Picloram
49 Simazine EPA 525.2
50 2,3,7,8-TCDD (Dioxin) EPA 1613
51 Toxaphene EPA 505
52 2,4,5-TP (Silvex) EPA 515.3
53 Benzene
EPA 524.2
54 Carbon tetrachloride
55 o-Dichlorobenzene
56 cis-1,2-Dichloroethylene
57 trans-1,2-Dichloroethylene
58 1,1-Dichloroethylene
59 1,1,1-Trichloroethane
60 1,2-Dichloroethane
61 Dichloromethane
62 1,1,2-Trichloroethane
63 1,2,4-Trhichloro-benzene
64 1,2-Dichloropropane
65 Ethylbenzene
66 Monochlorobenzene
67 para-Dichlorobenzene
68 Styrene
69 Tetrachlorethylene
70 Trichloroethylene
71 Toluene
72 Vinyl chloride
73 Xylene (total)
74 Total trihalomethanes EPA 524.2
75 Haloacetic acids (five) EPA 552.2
76 Bromate EPA 317.0/300.1B
77 Gross Alpha EPA 900
78 Radium-226 EPA 600/4-75-008
79 Radium-228 EPA 520/5/84-006, Ra-05
80 Beta Particle and Photon Radioactivity EPA 900
81 Uranium EPA 200.8
82 PFAS EPA 537
FA527021Q0087
Table 2. Analytical Parameter and Method (Wastewater)
*Parathion, methyl parathion, methyl demeton, and EPN only
No Analytical Parameter Method
1 pH JIS K 0102.12.1
2 BOD JIS K 0102.21
3 Total Suspended Solid (TSS) JEA Notice 59 Table 9
4 Normal hexane extracts mineral oil JEA Notice 64 Table 4
5 Normal hexane extracts animal and vegetable fat JEA Notice 64 Table 4
6 Total nitrogen JIS K 0102.45.6
7 Cadmium and its compounds JIS K 0102.55.2/55.4
8 Cyanide JIS K 0102.38.1/38.3
9 Organic phosphorus compounds* JEA Notice 64 Table 1
10 Lead and its compounds JIS K 0102.54.2/54.4
11 Chromium (VI) JIS K 0102.65.2
12 Arsenic and its compounds JIS K 0102.61.3/61.4
13 Total mercury
JIS K 0102 66.1
JEA Notice 59 Table 2
14 Alkyl mercury compounds
JIS K 0102 66.2
JEA Notice 59 Table 3
15 PCBs
JIS K 0093
JEA Notice 59 Table 4
16 Trichloroethylene
JIS K 0102.5.2
17 Tetrachloroethylene
18 Dichloromethane
19 Carbon tetrachloride
20 1,2-dichloroethane
21 1,1-dichloroethylene
22 cis-1,2-dichloroethylene
23 1,1,1-trichloroethane
24 1,1,2-trichloroethane
25 1,3-dichloropropene
26 Benzene
27 Vinyl chloride monomer MOE Notice
28 Thiuram JEA Notice 59 Table 4
29 Simazine JEA Notice 59 Table 5
30 Thiobencarb
31 Selenium and its compounds JIS K 0102.67.3/67.4
32 Boron and its compounds JIS K 0102.47.3/47.4
33 Fluorine and its compounds JIS K 0102.34.1
Ammonia, ammonium compounds, nitrate compounds and nitrite compounds
JIS K 0102
42.1/42.2/43.1/43.2
35 1,4-dioxane
JIS K 0125.5.2
JEA Notice 59 Table 8
36 Dioxins JIS K 0312-2008
37 PFAAs EPA 537m, CEN/TS 15968
FA527021Q0087
Table 3. Analytical Parameter and Method (Solid)
No Analytical Parameter Method (Leaching Test)
1 Benzene
JIS K 0125 5.2
2 Carbon Tetrachloride
3 Chloroethylene
4 1,2-Dichloroethane
5 1,1-Dichloroethylene
6 cis-1,2-Dichloroethylene
7 1,3-Dichloropropene
8 Dichloromethane
9 Tetrachloroethylene
10 1,1,1-Trichloroethane
11 1,1,2-Trichloroethane
12 Trichloroethylene
13 Cadmium and its compounds JIS K 0102 55.4
14 Hexavalent Chromium compounds JIS K 0102 65.2.1
15 Cyanides compounds JIS K 0102 38.3
16 Total Mercury and its compounds JIS K 0102 66.1.1
17 Alkyl Mercury JIS K 0102 66.2.1
18 Selenium and its compounds JIS K 0102 67.3
19 Lead and its compounds JIS K 0102 54.2
20 Arsenic and its compounds JIS K 0102 61.3
21 Fluorine and its compounds JIS K 0102 34.1
22 Boron and its compounds JIS K 0102 47.3
23 Simazine JEA Notice 59 Table 5
24 Thiobencarb
25 Thiuram JEA Notice 59 Table 4
26 PCB JIS K 0093
27 Organic phosphorus compounds JIS K 0102 31.1
28 1,4-dioxane JIS K 0125.5.2
Analytical Parameter Method (Content Test)
1 Arsenic and its compounds JIS K 0102 61.3
2 Boron and its compounds JIS K 0102 47.3
3 Cadmium and its compounds JIS K 0102 55.4
4 Chromium (VI) compounds JIS K 0102 65.2.1
5 Cyanide JIS K 0102 38.3
6 Fluoride and its compounds JIS K 0102 34.1
7 Lead and its compounds JIS K 0102 54.2
8 Mercury and its compounds JIS K 0102 66.1
9 Selenium and its compounds JIS K 0102 67.3
10 Dioxins JIS 0311-2020
Analytical Parameter Method (Other Test)
1 PCB, Oil
Manual of simple measurement method related to trace PCB in insulating oil
FA527021Q0087
(ver.3) 2.1.2 (May 2011
MOE)
FA527021Q0087
File details come from the government source that posted it. Updated .