This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide herbicide application and mapping services to treat approximately 953 acres of invasive species at the Grand Bay National Wildlife Refuge in Mississippi.
The key requirements include: treating 100% of cogon grass, Chinese tallow trees, and Japanese climbing fern with a 97% control rate; GPS mapping all treatment areas and providing digital data; complying with EPA standards, herbicide label restrictions, and local/state regulations; avoiding damage to native vegetation and wildlife; and achieving the 97% control rate within 2 months post-treatment, with follow-up treatment if needed. The period of performance is April 1, 2025 through August 31, 2025. This is a firm-fixed price contract, and the contractor will be responsible for providing all personnel, equipment, and supplies necessary to perform the required services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FS324Q0203_Amd_0001.pdf | ||
| Attachment_2-Quote_Schedule.docx | DOCX document | |
| Sol_140FS324Q0203.pdf | ||
| Attachment_4-_Past_Performance_Data_Document.docx | DOCX document | |
| Attachment_3-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Helena Tract- Herbicide Treatment- Grand Bay NWR
PERFORMANCE WORK STATEMENT
I. GENERAL INFORMATION
1.1 This is a non-personal services contract to provide herbicide application and mapping for treatment within an area of approximately 953 acres for Cogongrass (Imperata cylindrica), Chinese Tallow Tree (Triadica sebifera), and Japanese climbing fern (Lygodium japonicum), invasive exotic species in the State of Mississippi, within the delineated project boundaries on the Grand Bay National Wildlife Refuge (Refuge) in Jackson County, Mississippi (see XII map). Bids will include a cost per acre and a total cost. Total project footprint is dependent on cost per acre and funding available. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Point of Contact will be Sami Gray at 228-217-3256 and David Stoesz 228-281-0290.
1.2 Period of Performance: The period of performance shall be on or about April 1, 2025, thru August 31, 2025.
This timeframe should address inclement weather periods, unfavorable application periods, and unforeseen socioeconomic factors that could restrict performance.
A 97% control rate (dead vegetation of target species) must be reached by 2 months post treatment. Follow-up treatment to achieve 97% control rate will be required 2 months post treatment and follow-up treatment mapping and chemical use report will be required within 14 calendar days for each year treatment occurs.
1.3 Place of Performance: The work to be performed under this contract will be within the boundaries of the Helena Tract at Grand Bay National Wildlife Refuge XII map. All operations will be coordinated from the Refuge Fire Center located at 7200 Crane Lane, Gautier, MS 39553.
1.4 Type of Contract: This is a Firm Fixed Price contract/task order.
II. SCOPE OF WORK
2.1 Treatment Area. See XII map, approximately 953 acres at the Refuge within the boundary areas known as the Helena Tract. Treatment will be done to restore native habitat and enhance re-growth of native herbaceous vegetation.
2.2 Treat 100% of all cogon grass with 97% control rate.
Treatment. Chemicals must be approved before use. Chemicals must be used in accordance with all labels. To be considered complete, foliar application of herbicide must include a treatment buffer that extends 10 feet in all directions beyond the furthest most visible area of infestation. When infestations fall within 50’ of the drip line of oaks, the chemical treatment will be used to prevent damage to the trees. The contractor is required to GPS map all treatment areas and provided the digital map data (including date of application, acreage, herbicide, and application rate) to the refuge.
2.3 Treat 100% of the project area for Cogon grass, Chinese tallow trees, Japanese climbing fern and seed bed regeneration with 97% control rate.
Treatment. Chemicals must be approved before use. Chemicals must be used in accordance with all labels. To be considered complete, foliar application of herbicide will be limited to tree regeneration two foot and under.
When infestations fall within 50’ of the drip line of oaks, the chemical treatment will be used to prevent damage to the trees. The contractor is required to GPS map all treatment areas and provided the digital map data (including date of application, acreage, herbicide, and application rate) to the refuge.
Helena Tract- Herbicide Treatment- Grand Bay NWR
2.4 Contractor will record GPS track data and amount of chemical used while conducting treatment. Cogon infestations must be GPS mapped individually and perimeter/area provided to refuge digitally. Cogon treatments must include 10-foot buffer beyond the infestation perimeters edge.
2.5 Contractor must comply 100% with the agreed-upon plan of work. Method of treatment will be by ground.
Applications must be at the appropriate rate suggested by the manufacturer and in accordance with the label. All work must be done according to work statement, EPA standards, herbicide label restrictions and any local and state regulations.Contractor must submit chemicals to be used for approval 30 days in advance of start of project.
2.6 The Contractor shall provide all personnel, labor (i.e. herbicide application), equipment, supplies (i.e.
chemicals, herbicides, water, adjuvant), transportation, tools, materials, supervision, and other non-personal services necessary to perform the requirements of this contract order and shall plan, schedule, coordinate, and ensure effective performance of required services for the entire duration of contract. Treatment applications shall be performed in such a manner as to protect non-target plant species, the environment, and the public. NOTE: The COR/Government Point of Contact reserves the right to require the Contractor to replace any operating personnel, equipment used in the performance of this Contract if the personnel, or equipment are violating, or have violated, any state or federal laws is unsafe or for any valid reason. In this event, the Contractor shall, as soon as reasonably possible, upon written or verbal notice (to be later reduced to writing) from the Contracting Officer, provide replacements satisfactory to the Contracting Officer and Point of Contact at no additional cost.
2.7 Work performance shall be defined as 100% of identified invasive species infestations to be treated, (Acceptance Criteria) achieved two months post-treatment. If the Acceptance Criteria is not met, it shall be the responsibility of the Contractor to re-treat areas until the control rate is achieved at no additional cost to the Government (FWS). The COR/Government Point of Contact and Contractor shall conduct surveys to determine if the 100% treatment rate is reached. However, the COR/Government Point of Contact will make the ultimate decision if the 97% control rate is reached.
2.8 The COR/Government Point of Contact must be notified at least 48 hours prior to any application of chemical.
2.9 Tracked and wheeled equipment meeting Low Ground Pressure compliance are preferred, ATV/ UTVs and marshmasters will be allowed to operate within the treatment areas upon the unit if the ground disturbance and rutting is less than 6 inches. The COR/Government Point of Contact reserves the right to stop the usage of equipment if negative impacts are occurring upon the landscape.
2.10 The Contractor shall avoid any damage to native vegetation and wildlife. The Contractor shall not collect, harass, harm, or molest native plants or wildlife. The Contractor shall avoid damage to sensitive archaeological sites such as Native American and shell mounds. The Contractor shall be responsible for the removal of all trash and treatment-related equipment. The Contractor shall be held liable if damage was determined to be the fault of the Contractor (negligence), the result of improper treatment techniques, or the result of Contractor control activities.
2.11 The ground crew supervisor must be a licensed herbicide applicator, and shall be responsible for data collection, herbicide application and inventory, herbicide safety procedures, and crew supervision. The ground crew supervisor shall have navigation equipment such as a hand-held Global Positioning System (GPS) unit, to mark areas of treatment for submittal to the Refuge. All targeted plants, or populations of such plants, shall be treated and treatment sites recorded at each designated location before proceeding further as per the Point of Contact specifications. The Point of Contact shall provide technical support concerning species treatments for each delineated work area. Under no circumstances shall a non-approved herbicide or combination thereof, be used without knowledge or permission of the Point of Contact and an approved Pesticide Use Proposal. Ground crews accessing the treatment area need be aware that many of the acres to be treated contain seasonal wetlands.
2024 Helena Tract- Herbicide Treatment- Grand Bay NWR
2.12 The Contractor will provide USFWS with contact information for all ground personnel, vehicles, and equipment, identification information (including make, model, color, name of company, and contact information) at least 48 hours before implementation of the project.
2.13 Where applicable, the name brand and quantity of herbicide proposed by the contractor must be pre-approved by the USFWS through a Pesticide Use Proposal 30 days prior to application. Rates applied shall not exceed the highest rate recommended on the label for that treatment. Upon request, the USFWS can supply a list of commonly used chemicals for the Southeast Region. Preferred chemical and rates are listed in 2.2 and 2.3.
2.14 Treatment shall occur at least 30 days after a prescribed burn unless approval to treat is provided from the COR/Government Point of Contact. It is important to note that much of the treatment area is subject to be burned before or during the project dates.
III. APPLICABLE DIRECTIVES
3.1 All Contractor employees performing work directly onsite must adhere to all local regulations, rules, policies relating to the obtainment of proper clearances, building access, site access, and badges. If applicable, must complete background investigation, computer security, and records management training.
3.2 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
3.3 OSHA, 29 CFR 1910 (as applicable)
3.4 EPA regulations
3.5 The Contractor is responsible for acquiring and maintaining all federal, state, and local licenses, certifications, and permits as required. This includes the State Certified Pesticide Applicator (License). The Contractor shall be required to submit a copy of the licenses to the Contracting Officer prior to the award date. The only exception to this requirement is that the Refuge will provide the Section 7 permit for endangered species for this contract. A copy of the Section 7 permit will be furnished to the Contractor and all conditions will be followed. Endangered species are not known to frequently occur in the treatment area and adhering to the Section 7 permit conditions should require minimal effort.
3.6 Litter violations will be handled under Federal Code of Regulations 50CFR27.94 (a), which carries a fine of $100.00 per incident upon conviction.
IV. PERFORMANCE REQUIREMENTS
4.1 Supply and apply herbicide according to desired outcomes as per label directions and quantities.
4.2 Employ approved Current Control Technologies (CCTs) for controlling cogon grass infestations and tallow tree treatment within the treatment area. Current Control Treated plants shall be cut or left in place at the Contractor’s discretion. The Crew Supervisor shall be responsible for notifying the COR/Government Point of Contact within three weeks of treatment completion so that area can be inspected. Areas not treated, or not responding to treatment shall be required to be retreated at the Contractor’s expense, if it is determined that the Contractor provided inadequate treatment measures. The Contractor shall be responsible for 100% treatment (two months post-treatment) of all listed species within the delineated treatment area.
4.3 The Contractor shall canvas or inspect 100% of the treatment area and provide GPS tracks to support the effort.
4.4 Non-Target Damage: Contractor will not apply herbicides when wind speeds, at ground level, are more than 10 mph or as agreed upon by the COR/Government Point of Contact or when inversion conditions occur to limit drift.
4.5 Handling, Mixing, and Chemical Disposal: All herbicides and adjuvants/surfactants shall be handled and stored in accordance with instructions on the EPA registration label. All herbicides shall be mixed and applied in accordance with the label instructions. Unless noted, the Contractor shall be responsible for providing, handling, mixing, and disposing of all herbicides and adjuvants/surfactants. In addition, the Contractor shall ensure that no contamination of any water source occurs, and that emergency spill containment equipment or spill kit shall be present at the worksite and shall be capable of containing all potential herbicide or surfactant spills from contract vehicles or equipment.
4.6 The Contractor shall complete the herbicide application during the specified dates as directed by the Point of Contact.
4.7 The Contractor shall coordinate with the Government to determine the date(s) and time(s) of herbicide application to minimize impacts on other Government activities and so refuge staff has time to close roads and trails in the treatment area prior to treatment beginning. Contractor must have work dates and a plan of work approved by the Refuge 48 hours prior to beginning work, preferably established during a face-to-face pre-work meeting.
4.8 The Contractor shall clean and flush spray equipment in accordance with EPA guidelines. All spray tanks and mixing tanks must be properly cleaned (triple rinsed) prior to arrival or access will be denied. Contractor/operator may not flush/rinse out tanks onto the ground during operation or after the job is completed. Prior to leaving the worksite for the day, the Contractor shall remove all equipment and materials associated with contract on government property unless approval has been granted by the COR/Government Point of Contact, and/or a storage site has been identified.
4.9 Contractor is responsible for cleaning up any spills that may occur.
4.10 The Contractor shall be responsible for the removal of all trash and treatment-related equipment. Trash shall be removed daily. If damage occurs, the Contractor shall be held liable if damage was determined to be caused by Contractor negligence, the result of improper treatment techniques, or the result of Contractor control activities.
4.11 The COR/Government Point of Contact shall inform the Contractor of the time schedule as work progresses.
However, the COR/Government Point of Contact may halt work at any time upon written notice.
4.12 Weather and site conditions may interfere with the work completion schedule negotiated at the award conference. The COR/Government Point of Contact may halt work at any time upon written notice for conditions beyond the control of the contractor. If this results in significant time lost, the completion date for the project can be re-negotiated by the Contracting Officer, COR/Government Point of Contact, and the Contractor.
4.13 Contractor shall provide herbicide label information for approval before use.
4.14 Ground crews will exclusively be used for this contract. Foliar applications will be limited to Chinese tallow trees at and below two feet in height.
V. WORK TIME/HOURS OF DUTY
5.1 Work will not be performed on the following holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Juneteenth, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving, and Christmas without approval from COR/Government Point of Contact.
5.2 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 6 am – 6 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Additional hours must be approved by the Point of Contact prior to implementing. For other than firm fixed price contracts, the Contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this Performance Work Statement when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
VI. SUPPLIES, MATERIALS, EQUIPMENT, AND UTILITIES
NOTE: As a government agency dedicated to “working with others to conserve, protect and enhance fish, wildlife, and plants and their habitats for the continuing benefit of the American people,” the U.S. Fish and Wildlife Service strives to incorporate the most ecologically sound and environmentally beneficial technologies, materials, and practices into all aspects of planning and operations. To help achieve this mission and meet Executive Orders (EOs) and Department of the Interior (DOI) planning requirements, the USFWS has implemented strategies to reduce the environmental impacts associated with procurement, lease acquisition, waste prevention and recycling, facility design, construction, operation, and management, contracting and permitted commercial visitor services.
These strategies have been collectively referred to as the FWS’s Green Procurement and Waste Prevention & Recycling Program (Greening Program) and are a part of the FWS’s overall approach to environmental management.
6.1 Government will furnish NO supplies, materials, equipment.
VII. SUPERVISION
7.1 In order to ensure performance and accomplishment of the work as outlined herein, the Contractor shall always provide adequate and competent supervision for all work to be accomplished by the Contractor’s employees. When contract work is in progress, supervisory personnel shall be always available to receive notices, reports, or requests from the Contracting Officer, COR/Government Point of Contact or authorized representative. At no time shall Government representatives direct or supervise the activities of the Contractor’s employees.
7.2 On-site Supervision: An on-site supervisor, with the ability to speak and understand English clearly and with the authority to act for the Contractor on a day-to-day basis and to sign inspection reports and all other correspondence on behalf of the Contractor, shall be present at the work site at all times when contract work is in progress, unless a contractor employee can act on the supervisor’s behalf.
7.3 Ensuring that Contractor personnel are properly trained to perform their assigned work in a proper, safe, and efficient manner, and ensuring that the proper supplies, materials, and equipment are on hand.
7.4 Taking action to prevent general carelessness by employees and/or abuse of facilities or equipment.
7.5 Indoctrinating employees to prevent and report fire and hazardous conditions.
VIII. CONTRACTOR PERSONNEL QUALIFICATIONS
8.1 Supervisory Personnel: All supervisory employees engaged in directing the work to be accomplished under this contract shall possess, at least with-in the last two years of recent, (within the past four years) experience in directing the subject service-type operations in a supervisory capacity for buildings/property of the approximate size/scope under this contract.
IX. DELIVERABLES
9.1 Frequent reporting/accounting of overall progress and (to-date) expenditures (i.e., 25%, 50%, 90%) or as determined by the Contracting Officer, COR, or Government Point of Contact.
9.2 A detailed treatment report that will include a map of the treatment area will be submitted within 2 weeks of completing the treatment and includes a chemical use section detailing application rates, herbicide used coverage area and other chemical facts. Digital geodata of the treated areas will be submitted to the COR/Government Point of Contacts at Sami_Gray@fws.gov and David_Stoesz@fws.gov within 2 weeks of completing the treatment and will be either GPS track file, an ArcGIS Pro feature classes, or a Google Earth kml/kmz files.
9.3 Safety/spill response plan.
9.4 The COR/Government Point of Contact will inspect all areas periodically during the contract period and will perform a final inspection of all areas 60 days following treatments.
X. DELIVERABLES SCHEDULE
(This technical exhibit lists any reports or documentation that is required as a deliverable and includes the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes.)
Deliverable Frequency # of Copies Medium/Format Submit To Routine reporting/accounting of progress and (to-date) expenditures
25%, 50%, 90%
Final
Digital copy in MS
Word or Excel format
COR/Government Point of Contact
Universal Daily Progress Report
Recorded daily;
submitted weekly
Digital copy in MS Word or Excel format
Treatment Report
2 weeks post initial and follow-up treatments
Digital copy in MS Word or Excel format and associated geodata.(ESRI or Google Earth)
Coordination, application, and wrap-up meetings
As directed by the Contracting
Officer/Point of Contact n/a Meeting
XI. Quality Assurance Plan
11.1 Comply with all contract terms and conditions. 100% compliance
11.2 Maintain safety of workers and work environment at all times. 100% compliance with no deviations
11.3 Maintain a Quality Control Plan and immediately disclose/report any problems. 100% compliance
11.4 Ensure all equipment is in good working order during the entire period of performance and safeguard the use and storage of all chemicals. 100% compliance
11.5 The task shall be considered completed following a thorough final inspection of the delineated treatment area by the Point of Contact, and only if it is determined that the Contractor treated 97% of the identified invasive species within 100% of the delineated treatment area after the treatment has been completed and achieved a 97% mailto:Sami_Gray@fws.gov mailto:David_Stoesz@fws.gov treatment rate two months post-treatment. If it is determined that the Contractor did not achieve a 97% treatment rate, and was found in non-compliance, additional re-treatment of the entire area shall be performed at the Contractor’s expense. 100% compliance
11.6 Inspection of materials, equipment, and chemicals. The Contracting Officer, COR or Government Point of Contact reserves the right to inspect, at any time upon notice to the Contractor, the Contractor’s procedures, spray system, spray solution, and other ancillary equipment, and operating personnel. Inspection, however, shall not relieve the Contractor of any obligations or responsibilities, nor shall it transfer any liability to the Refuge.
11.7 Final payment shall be held until a 97% treatment rate is reached for the treatment area as determined by the final inspection conducted by the Point of Contact and digital mapping requirements provided two months post treatment. Prior to reaching a 97% treatment rate and after the initial treatment, 75% of the awarded contract can be invoiced by the Contractor for payment. The remaining 25% of the awarded contract cannot be invoiced until a 97% treatment rate is reached. Unless 97% treatment is shown on targeted vegetation, the Contractor must return to the unaffected portion of the site and re-spray at no expense to the government within 12 months of the final treatment. Retreatment must be sprayed during growing season. No retreatments will be allowed during dormancy.
The COR/Government Point of Contract will determine the best re-treatment periods.
XII. Map
| 1 |
| A06-SANDHILL CRANE-FY24 Helena Chemical map |