Attachment 1 - Fox Field HVAC Replacement - Statement of Work.pdf
PDF 349 KB Posted
- Attached to
- Fox Field HVAC Replacement Federal contract opportunity
- Solicitation number
- 127EAT23Q0058
- Issued by
- Department of Agriculture Forest Service
About this file
This statement of work outlines the requirements for replacing the heating and cooling system at the Fox Field Air Tanker Base Regional Office. The project involves removing an existing 2.5-ton split HVAC system and installing a new 2.5-ton Goodman heat pump split system with condenser, variable speed air handler, disconnect switch, drain lines, thermostat, and associated ductwork and electrical connections. The contractor must comply with EPA regulations for disposal of the old equipment and installation of the new system. Additional requirements include Davis-Bacon prevailing wage rates, a 120-day performance period, site cleanup, and System for Award Management registration. The related federal contract opportunity is solicitation number 127EAT23Q0058 from the Department of Agriculture Forest Service for the Fox Field HVAC replacement project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Fox Field HVAC Replacement - Statement of Work Revised.pdf | ||
| 127EAT23Q0058 Amendment 0002 - Revised Statement of Work.pdf | ||
| 127EAT23Q0058 Amendment 0001 - Site Visit-Wage Determination.pdf | ||
| Attachment 3 - Wage Determination.pdf | ||
| RFQ 127EAT23Q0058 - Fox Field HVAC Replacement.pdf | ||
| Attachment 2 - Fox Field HVAC Replacement - Pics-Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ ATTACHMENT 1
STATEMENT OF WORK
FOR REPLACEMENT OF HEATING AND COOLING SYSTEM
AT FOX FIELD AIR TANKER BASE REGIONAL OFFICE
PART 1 GENERAL
1.01. DESCRIPTION: The work is to remove and replace an existing 2.5-ton HVAC system and replace with an in-kind replacement for the Fox Field Air Tanker Base (ATB) Regional Office building. See scope of work for more details.
1.02. PROJECT LOCATION: Angeles National Forest Fox Field ATB Regional Office located at 4725 William J. Barnes Ave., Lancaster, CA 93536.
1.03. CODES AND STANDARDS: Work performed under this section shall meet the requirements of the most current edition of the National Electrical Code and the Building code for the County of Los Angeles.
1.04 SCOPE OF WORK: The scope of the work is to replace a 2.5-ton split HVAC system with a modern in-kind replacement. Removal and disposal of existing HVAC system shall comply with EPA 608 regulation for disposal and new installation of a HVAC system. The system will be comprised of:
New 2.5-ton Goodman Heat Pump Split System New 2.5-ton 14.2 SEER2 Goodman Condenser New 2.5-ton Multi-Positional Variable Speed Goodman Air Handler New High Efficiency New 60 AMP Disconnect with Proper Fuse Size Installation of Drain Lines Installation of Primary Condensate Drain P Trap with Plumbing Air
Vent Installation of Safety T-Switch Miscellaneous Items approved by LEED (duct sealant paste, glenkoe, metal tapes, sealants, tech screws, etc).
Installation of Two (2) New and Compatible Honeywell Thermostat
Or an equivalent unit.
Contractor shall modify the inlet and outlet transition ducts as required to accommodate the new equipment. New ducts shall be insulated properly.
Contractor shall flush out existing cooper lines, provide all equipment and supplies, transportation, labor and parts. Perform all electrical connections to Code. Load system with refrigerant per Manufacturer Specifications, test and balance system.
1.05 PREVAILING WAGES: Davis Bacon Act shall apply to wages on this contract.
1.06 Contract Time: Contract performance shall be completed within 120 days after receiving a Notice to Proceed.
1.07 Project Site Cleanup: Project site cleanup includes the removal and proper disposal of all construction trash, debris and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all local, State, and Federal laws and regulations governing such disposal. If needed during the performance of the Work, the Contractor shall be required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.
1.08 SAM REGISTRATION: Registration in SAM (System for Award Management) is required. Only proposals from contractors that are currently registered in SAM will be considered. The link to SAM is: https://www.sam.gov/SAM/
END OF STATEMENT
File details come from the government source that posted it. Updated .