This statement of work is for the replacement of a 2.5-ton HVAC system at the Fox Field Air Tanker Base Regional Office in Lancaster, California. The scope of work includes removing the existing HVAC system and installing a new 2.5-ton Goodman split system heat pump with air handler, condenser, thermostat, ductwork modifications, and all necessary electrical and plumbing connections. Contractors must comply with EPA regulations for removal and disposal of refrigerants from the existing unit. The contract will be awarded within 120 days of receiving a notice to proceed and must be completed within the same 120-day period. Prevailing Davis-Bacon wages apply. The related federal contract opportunity is solicitation number 127EAT23Q0058 being offered by the Department of Agriculture Forest Service to replace the HVAC system at the Fox Field facility.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ ATTACHMENT 1

STATEMENT OF WORK

FOR REPLACEMENT OF HEATING AND COOLING SYSTEM

AT FOX FIELD AIR TANKER BASE REGIONAL OFFICE

PART 1 GENERAL

1.01. DESCRIPTION: The work is to remove and replace an existing 2.5-ton HVAC system and replace with an in-kind replacement for the Fox Field Air Tanker Base (ATB) Regional Office building. See scope of work for more details.

1.02. PROJECT LOCATION: Angeles National Forest Fox Field ATB Regional Office located at 4725 William J. Barnes Ave., Lancaster, CA 93536.

1.03. CODES AND STANDARDS: Work performed under this section shall meet the requirements of the most current edition of the National Electrical Code and the Building code for the County of Los Angeles.

1.04 SCOPE OF WORK: The scope of the work is to replace a 2.5-ton split HVAC system with a modern in-kind replacement. Removal and disposal of existing HVAC system shall comply with EPA 608 regulation for disposal and new installation of a HVAC system. The system will be comprised of:

New 2.5-ton Goodman Heat Pump Split System New 2.5-ton 14.2 SEER2 Goodman Condenser New 2.5-ton Multi-Positional Variable Speed Goodman Air Handler New High Efficiency New 60 AMP Disconnect with Proper Fuse Size Installation of Drain Lines Installation of Primary Condensate Drain P Trap with Plumbing Air

Vent Installation of Safety T-Switch Miscellaneous Items approved by LEED (duct sealant paste, glenkoe, metal tapes, sealants, tech screws, etc).

Installation of One (1) New and Compatible Honeywell Thermostat

Or an equivalent unit.

Contractor shall modify the inlet and outlet transition ducts as required to accommodate the new equipment. New ducts shall be insulated properly.

Contractor shall flush out existing cooper lines, provide all equipment and supplies, transportation, labor and parts. Perform all electrical connections to Code. Load system with refrigerant per Manufacturer Specifications, test and balance system.

1.05 PREVAILING WAGES: Davis Bacon Act shall apply to wages on this contract.

1.06 Contract Time: Contract performance shall be completed within 120 days after receiving a Notice to Proceed.

1.07 Project Site Cleanup: Project site cleanup includes the removal and proper disposal of all construction trash, debris and residue off of National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all local, State, and Federal laws and regulations governing such disposal. If needed during the performance of the Work, the Contractor shall be required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.

1.08 SAM REGISTRATION: Registration in SAM (System for Award Management) is required. Only proposals from contractors that are currently registered in SAM will be considered. The link to SAM is: https://www.sam.gov/SAM/

END OF STATEMENT