This document is an attachment to a federal contract opportunity for Vacuum Hole Plugs. The key details are:

The contract requires the manufacture of Vacuum Hole Plugs in accordance with NAVSEA Drawing 5808479. The quantity shall be as specified in the contract line items. First Article Testing (FAT) is required per the drawing, to be performed by the manufacturer. The FAT test reports must be submitted to the government within 30 days of contract award. No special marking requirements or material safety data sheets are needed. The contract opportunity is solicitation SPMYM325Q5006, issued by the Defense Logistics Agency Land and Maritime. Drawings will be provided upon receipt of a valid DD Form 2345 and signed security agreement.

View the file

Other files

File Type Posted
Security Agreement For Protection of NNPI.pdf PDF
Exhibit A.pdf PDF
Combined Synopsis 25-Q-5006.docx DOCX document
Clauses - Full Text Provisions and Clauses 231228.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT

PRINTED 10/4/2024 ATTACHMENT PAGE

5330 9H

C DESCRIPTION/SPECIFICATIONS

C.1 MANUFACTURE VACUUM HOLE PLUGS IN ACCORDANCE WITH ITEM DESCRIPTION AS SPECIFIED IN

SECTION B OF THIS SCHEDULE AND IN ACCORDANCE WITH THE FOLLOWING ORDERING DATA.

a. NAVSEA DRAWING 5808479 REV "-" 2/11/88

b. QUANTITY SHALL BE AS SPECIFIED IN CONTRACT LINE ITEM(S)

c. FIRST ARTICLE TESTING (FAT) IS REQUIRED

d. FAT PER DRAWING PARAGRAPH 4.2 AND QUALITY CONFORMANCE TESTING PER DRAWING

PARAGRAPH 4.3 SHALL BE PERFORMED BY THE MANUFACTURER

e. FAT TEST REPORTS FROM THE MANUFACTURER SHALL BE SUBMITTED TO PORTSMOUTH NAVAL

SHIPYARD CODE 245.3 THROUGH THE CONTRACTING OFFICE WITHIN 30 DAYS OF CONTRACT AWARD.

GOVERNMENT OVERSIGHT IS NOT REQUIRED. CONTRACTER WILL BE NOTIFIED OF

ACCEPTANCE/REJECTION WITHIN 21 DAYS OF SUBMITTAL OF FAT REPORTS. ALTERNATIVELY,

CONTRACTOR MAY SUBMIT PROOF OF PRIOR FAT ACCEPTANCE.

F. NO SPECIAL MARKING REQUIREMENTS APPLY

g. MATERIAL SAFETY DATA SHEETS ARE NOT REQUIRED.

C.2 C500 MERCURY CONTROL (SUPPLIES)

D PRESERVATION/PACKAGING/PACKING

D.1 D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS)

E INSPECTION ACCEPTANCE

E.1 E1 RESPONSIBILITY FOR INSPECTION

ITEM NO.

STOCK NUMBER

5330-LL-DM1-2919

SPECIAL CHARACTERISTICS

USED FOR SHT AD-79 TILES

DWG; 5808479

***FIRST ARTICLE TEST REQUIRED IN ACCORDANCE TO THIS DWG***

ITEM NAME VACUUM HOLE PLUGS, RUBBER

SECTION B

H SPECIAL PROVISIONS

K Section

L Section

M Section

SMIC

5M

SPMYM325Q5006