This document is an attachment to a federal contract opportunity for Vacuum Hole Plugs. The key details are:
The contract requires the manufacture of Vacuum Hole Plugs in accordance with NAVSEA Drawing 5808479. The quantity shall be as specified in the contract line items. First Article Testing (FAT) is required per the drawing, to be performed by the manufacturer. The FAT test reports must be submitted to the government within 30 days of contract award. No special marking requirements or material safety data sheets are needed. The contract opportunity is solicitation SPMYM325Q5006, issued by the Defense Logistics Agency Land and Maritime. Drawings will be provided upon receipt of a valid DD Form 2345 and signed security agreement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Security Agreement For Protection of NNPI.pdf | ||
| Exhibit A.pdf | ||
| Combined Synopsis 25-Q-5006.docx | DOCX document | |
| Clauses - Full Text Provisions and Clauses 231228.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT
PRINTED 10/4/2024 ATTACHMENT PAGE
5330 9H
C DESCRIPTION/SPECIFICATIONS
C.1 MANUFACTURE VACUUM HOLE PLUGS IN ACCORDANCE WITH ITEM DESCRIPTION AS SPECIFIED IN
SECTION B OF THIS SCHEDULE AND IN ACCORDANCE WITH THE FOLLOWING ORDERING DATA.
a. NAVSEA DRAWING 5808479 REV "-" 2/11/88
b. QUANTITY SHALL BE AS SPECIFIED IN CONTRACT LINE ITEM(S)
c. FIRST ARTICLE TESTING (FAT) IS REQUIRED
d. FAT PER DRAWING PARAGRAPH 4.2 AND QUALITY CONFORMANCE TESTING PER DRAWING
PARAGRAPH 4.3 SHALL BE PERFORMED BY THE MANUFACTURER
e. FAT TEST REPORTS FROM THE MANUFACTURER SHALL BE SUBMITTED TO PORTSMOUTH NAVAL
SHIPYARD CODE 245.3 THROUGH THE CONTRACTING OFFICE WITHIN 30 DAYS OF CONTRACT AWARD.
GOVERNMENT OVERSIGHT IS NOT REQUIRED. CONTRACTER WILL BE NOTIFIED OF
ACCEPTANCE/REJECTION WITHIN 21 DAYS OF SUBMITTAL OF FAT REPORTS. ALTERNATIVELY,
CONTRACTOR MAY SUBMIT PROOF OF PRIOR FAT ACCEPTANCE.
F. NO SPECIAL MARKING REQUIREMENTS APPLY
g. MATERIAL SAFETY DATA SHEETS ARE NOT REQUIRED.
C.2 C500 MERCURY CONTROL (SUPPLIES)
D PRESERVATION/PACKAGING/PACKING
D.1 D4 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS)
E INSPECTION ACCEPTANCE
E.1 E1 RESPONSIBILITY FOR INSPECTION
ITEM NO.
STOCK NUMBER
5330-LL-DM1-2919
SPECIAL CHARACTERISTICS
USED FOR SHT AD-79 TILES
DWG; 5808479
***FIRST ARTICLE TEST REQUIRED IN ACCORDANCE TO THIS DWG***
ITEM NAME VACUUM HOLE PLUGS, RUBBER
SECTION B
H SPECIAL PROVISIONS
K Section
L Section
M Section
SMIC
5M
SPMYM325Q5006
1/1
File details come from the government source that posted it. Updated .