Attachment 1-Cost Forms Dragonfly.xlsx
XLSX spreadsheet 50 KB Posted
- Attached to
- DRAGONFLY PARACHUTE DECELERATOR SYSTEM Federal contract opportunity
- Solicitation number
- 80LARC22R0001
About this file
This document includes cost proposal templates for a federal contract opportunity with the National Aeronautics and Space Administration Langley Research Center. The templates provide a framework for proposing costs by contract year, phase, labor category and cost element for the Dragonfly Parachute Decelerator System. Offerors are invited to submit proposals in response to providing the design, fabrication, delivery and associated data for the parachute decelerator subsystem. The contract type will be cost-plus-fixed-fee, with a potential period of performance of four and a half years. Proposals are due by December 3, 2021 and shall be submitted electronically through NASA's Enterprise File Sharing and Sync Box platform. The anticipated contract award date is February 11, 2022, with an effective date of February 14, 2022. The work will primarily be performed offsite at the contractor's facilities, with possible onsite access required to NASA Langley, Johnson and Ames locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 02 Documents.zip | ZIP file | |
| SF30 Amendment 02.pdf | ||
| SF30 Amendment 01.pdf | ||
| Attachment 8-DF-PDS Supplemental Dcs.zip | ZIP file | |
| Attachment 7-SF1408.pdf | ||
| Exhibit A DF PDS SOW Final Release V1.pdf | ||
| Exhibit C SOW DRL_DRD Final Release V1.pdf | ||
| Attachment 3-Blackout Notice.pdf | ||
| Attachment 5-NASA OCI Guide.pdf | ||
| Attachment 6-Sample Consent Letter.pdf | ||
| 80LARC22R0001 RFP.pdf | ||
| Exhibit B SOW Reqs Final Release V1.pdf | ||
| Attachment 2-Past Performance Questionnaire.pdf | ||
| Attachment 4-OCI Instructions.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Form A
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| COST FORM A |
| Total Cost Sumamry |
| Dragonfly - PDS |
| Phase | CLIN | Item | Contract | Contract | Contract | Contract | Contract | ||
| Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL | ||||
| Total Contract (Note 1) | B | 1 | Phase B Data Package | ||||||
| C | 2 | Phase C Data Package | |||||||
| D | 3 | Engineering Model Delivery & Inspection | |||||||
| D | 4 | Flight Unit Delivery | |||||||
| D | 5 | Phase D Data Package | |||||||
| Total Contract Value | |||||||||
| Instructions: | |||||||||
| (1) Cost Form A is the summary of proposed costs by Contract Year / Phase / CLIN. |
Cost Form A-1
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| COST FORM A-1 |
| Summary of Total Costs Proposed by Year and Element |
| Dragonfly - PDS |
| COST ELEMENTS | See below-Instructions | Contract | Contract | Contract | Contract | Contract | |
| 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL |
| HOURS | 3 |
| Prime Contractor Hours | |
| Significant Subcontractor Hours | |
| Subcontractor 1 | |
| Subcontractor 2 | |
| Total Significant Subcontract Hours | |
| Other Subcontract Hours | |
| Consultant Hours | |
| TOTAL LABOR HOURS |
| DIRECT LABOR COSTS | 4 |
| FRINGE | 5 |
| OVERHEAD | 5 |
| ON-SITE | |
| OFF-SITE | |
| TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD |
| Subcontract/Consultant Costs | 6 |
| Subcontractor 1 | |
| Subcontractor 2 | |
| Other Subcontract Costs | |
| Consultants | |
| Total Subcontract/Consultants Costs |
MATERIALS & PARTS
TOTAL MATERIALS & PARTS
MATERIAL BURDEN 5
SUBTOTAL MATERIAL & MATERIAL BURDEN
| OTHER DIRECT COSTS | 7 |
| Miscellaneous | |
| TRAVEL | |
| SUBTOTAL OTHER DIRECT COSTS |
G&A 5
SUBTOTAL
Facilities Capital Cost of Money 5
TOTAL COSTS
FEE 8
TOTAL CONTRACT PRICE
| INSTRUCTIONS |
| (1) Cost Form A-1 is the summary of all proposed costs. |
| (2) Provide formulas (bases and rates) used to derive all dollars shown on all Cost Forms. |
| (3) Direct Labor Hours must flow from Cost Form B, significant subcontractors', Cost Form B, Cost Form C and Cost Form D. |
| Lines may be added for significant subcontractors if needed. |
| (4) Direct Labor Cost must flow from Cost Form B. |
| (5) The applicable indirect rate and its basis from Cost Form F must be clearly identified in the calculation of the associated indirect cost. |
| (6) Subcontract/Consultant Costs represent significant subcontractors, other subcontractors, and consultants that were distributed labor hours by the offeror. Each significant subcontractor, as defined in RFP Provision L.xx, must be supported by separate subcontractor Cost Forms. Only significant subcontractor's proposed costs must be identified separately. Lines may be added for significant subcontractors if needed. Other subcontract costs must Flow from Cost Form D. Consultant costs must flow from Cost Form C. |
| (7) Other Direct Costs must flow from Cost Form E. |
| (8) Clearly identify the fee percentage and basis in the calculation of fee. |
Cost Form A-2
| Offeror Name: | |||||||||||||||||||||||
| Proposal Title and Date: | |||||||||||||||||||||||
| Proposal Number: | |||||||||||||||||||||||
| COST FORM A-2 | |||||||||||||||||||||||
| Summary of Total Costs Proposed by Pase/CLIN, Year and Element | |||||||||||||||||||||||
| Dragonfly - PDS | |||||||||||||||||||||||
| PHASE B CLIN 1 | PHASE C CLIN 2 | PHASE D CLIN 3 | |||||||||||||||||||||
| COST ELEMENTS | Contract | Contract | Contract | Contract | Contract | COST ELEMENTS | Contract | Contract | Contract | Contract | Contract | COST ELEMENTS | Contract | Contract | Contract | Contract | Contract | ||||||
| 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL | 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL | 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL |
| HOURS | 3 | HOURS | 3 | HOURS | 3 |
| Prime Contractor Hours | Prime Contractor Hours | Prime Contractor Hours | |||
| Significant Subcontractor Hours | Significant Subcontractor Hours | Significant Subcontractor Hours | |||
| Subcontractor 1 | Subcontractor 1 | Subcontractor 1 | |||
| Subcontractor 2 | Subcontractor 2 | Subcontractor 2 | |||
| Total Significant Subcontract Hours | Total Significant Subcontract Hours | Total Significant Subcontract Hours | |||
| Other Subcontract Hours | Other Subcontract Hours | Other Subcontract Hours | |||
| Consultant Hours | Consultant Hours | Consultant Hours | |||
| TOTAL LABOR HOURS | TOTAL LABOR HOURS | TOTAL LABOR HOURS |
| DIRECT LABOR COSTS | 4 | DIRECT LABOR COSTS | 4 | DIRECT LABOR COSTS | 4 |
| FRINGE | 5 | FRINGE | 5 | FRINGE | 5 |
| OVERHEAD | 5 | OVERHEAD | 5 | OVERHEAD | 5 |
| ON-SITE | ON-SITE | ON-SITE | |||
| OFF-SITE | OFF-SITE | OFF-SITE | |||
| TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD | TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD | TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD |
| Subcontract/Consultant Costs | 6 | Subcontract/Consultant Costs | 6 | Subcontract/Consultant Costs | 6 |
| Subcontractor 1 | Subcontractor 1 | Subcontractor 1 | |||
| Subcontractor 2 | Subcontractor 2 | Subcontractor 2 | |||
| Other Subcontract Costs | Other Subcontract Costs | Other Subcontract Costs | |||
| Consultants | Consultants | Consultants | |||
| Total Subcontract/Consultants Costs | Total Subcontract/Consultants Costs | Total Subcontract/Consultants Costs |
MATERIALS & PARTS MATERIALS & PARTS MATERIALS & PARTS
TOTAL MATERIALS & PARTS TOTAL MATERIALS & PARTS TOTAL MATERIALS & PARTS
MATERIAL BURDEN 5 MATERIAL BURDEN 5 MATERIAL BURDEN 5
SUBTOTAL MATERIAL & MATERIAL BURDEN SUBTOTAL MATERIAL & MATERIAL BURDEN SUBTOTAL MATERIAL & MATERIAL BURDEN
| OTHER DIRECT COSTS | 7 | OTHER DIRECT COSTS | 7 | OTHER DIRECT COSTS | 7 |
| Miscellaneous | Miscellaneous | Miscellaneous | |||
| TRAVEL | TRAVEL | TRAVEL | |||
| SUBTOTAL OTHER DIRECT COSTS | SUBTOTAL OTHER DIRECT COSTS | SUBTOTAL OTHER DIRECT COSTS |
| G&A | 5 | G&A | 5 | G&A | 5 |
| PROGRAM MGMT OFFICE (PMO) | 5 | PROGRAM MGMT OFFICE (PMO) | 5 | PROGRAM MGMT OFFICE (PMO) | 5 |
SUBTOTAL SUBTOTAL SUBTOTAL
Facilities Capital Cost of Money 5 Facilities Capital Cost of Money 5 Facilities Capital Cost of Money 5
TOTAL COSTS TOTAL COSTS TOTAL COSTS
FEE 8 FEE 8 FEE 8
| TOTAL CONTRACT PRICE | TOTAL CONTRACT PRICE | TOTAL CONTRACT PRICE | |||||||
| PHASE D CLIN 4 | |||||||||
| Instructions: | COST ELEMENTS | Contract | Contract | Contract | Contract | Contract | |||
| (1) Cost Form A-2 is the summary of proposed costs by Contract Year / cost element / Phase / CLIN. | 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL | ||
| (2) Total Costs for each Phase / Clin and Year must flow to Cost Form A. | |||||||||
| HOURS | 3 | ||||||||
| Prime Contractor Hours | |||||||||
| Significant Subcontractor Hours | |||||||||
| Subcontractor 1 | |||||||||
| Subcontractor 2 | |||||||||
| Total Significant Subcontract Hours | |||||||||
| Other Subcontract Hours | |||||||||
| Consultant Hours | |||||||||
| TOTAL LABOR HOURS |
| DIRECT LABOR COSTS | 4 |
| FRINGE | 5 |
| OVERHEAD | 5 |
| ON-SITE | |
| OFF-SITE | |
| TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD |
| Subcontract/Consultant Costs | 6 |
| Subcontractor 1 | |
| Subcontractor 2 | |
| Other Subcontract Costs | |
| Consultants | |
| Total Subcontract/Consultants Costs |
MATERIALS & PARTS
TOTAL MATERIALS & PARTS
MATERIAL BURDEN 5
SUBTOTAL MATERIAL & MATERIAL BURDEN
| OTHER DIRECT COSTS | 7 |
| Miscellaneous | |
| TRAVEL | |
| SUBTOTAL OTHER DIRECT COSTS |
| G&A | 5 |
| PROGRAM MGMT OFFICE (PMO) | 5 |
SUBTOTAL
Facilities Capital Cost of Money 5
TOTAL COSTS
FEE 8
| TOTAL CONTRACT PRICE | |||||||
| PHASE D CLIN 5 | |||||||
| COST ELEMENTS | Contract | Contract | Contract | Contract | Contract | ||
| 1,2 | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL |
| HOURS | 3 |
| Prime Contractor Hours | |
| Significant Subcontractor Hours | |
| Subcontractor 1 | |
| Subcontractor 2 | |
| Total Significant Subcontract Hours | |
| Other Subcontract Hours | |
| Consultant Hours | |
| TOTAL LABOR HOURS |
| DIRECT LABOR COSTS | 4 |
| FRINGE | 5 |
| OVERHEAD | 5 |
| ON-SITE | |
| OFF-SITE | |
| TOTAL DIRECT LABOR INCLUDING FRINGE & OVERHEAD |
| Subcontract/Consultant Costs | 6 |
| Subcontractor 1 | |
| Subcontractor 2 | |
| Other Subcontract Costs | |
| Consultants | |
| Total Subcontract/Consultants Costs |
MATERIALS & PARTS
TOTAL MATERIALS & PARTS
MATERIAL BURDEN 5
SUBTOTAL MATERIAL & MATERIAL BURDEN
| OTHER DIRECT COSTS | 7 |
| Miscellaneous | |
| TRAVEL | |
| SUBTOTAL OTHER DIRECT COSTS |
| G&A | 5 |
| PROGRAM MGMT OFFICE (PMO) | 5 |
SUBTOTAL
Facilities Capital Cost of Money 5
TOTAL COSTS
FEE 8
TOTAL CONTRACT PRICE
Cost Form B
| Offeror Name: | ||||
| Proposal Title and Date: | ||||
| Proposal Number: | ||||
| COST FORM B | COST FORM B | COST FORM B | COST FORM B | COST FORM B |
| Summary of Direct Labor Hours and Costs | Summary of Direct Labor Hours and Costs | Summary of Direct Labor Hours and Costs | Summary of Direct Labor Hours and Costs | Summary of Direct Labor Hours and Costs |
| Dragonfly - PDS | Dragonfly - PDS | Dragonfly - PDS | Dragonfly - PDS | Dragonfly - PDS |
| Contract Year 1 | Contract Year 2 | Contract Year 3 | Contract Year 4 | Contract Year 5 | |||||||||||||||
| Hourly | Direct | Hourly | Direct | Hourly | Direct | Hourly | Direct | Hourly | Direct | ||||||||||
| Labor Category | Hours | Labor Rate | Labor Costs | Labor Category | Hours | Labor Rate | Labor Costs | Labor Category | Hours | Labor Rate | Labor Costs | Labor Category | Hours | Labor Rate | Labor Costs | Labor Category | Hours | Labor Rate | Labor Costs |
Total Direct Labor Year One Total Direct Labor Year Two Total Direct Labor Year Three Total Direct Labor Year Four Total Direct Labor Year Five
| Instructions: | Instructions: | Instructions: | Instructions: | Instructions: |
| (1) Direct Labor Rates must flow from Cost Form F. | (1) Direct Labor Rates must flow from Cost Form F. | (1) Direct Labor Rates must flow from Cost Form F. | (1) Direct Labor Rates must flow from Cost Form F. | (1) Direct Labor Rates must flow from Cost Form F. |
| (2) Direct Labor Hours and Costs for each year must flow to Cost Form A-1. | (2) Direct Labor Hours and Costs for each year must flow to Cost Form A-1. | (2) Direct Labor Hours and Costs for each year must flow to Cost Form A-1. | (2) Direct Labor Hours and Costs for each year must flow to Cost Form A-1. | (2) Direct Labor Hours and Costs for each year must flow to Cost Form A-1. |
Cost Form C
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| C O S T F O R M C |
| Summary of Consultant Costs |
| Dragonfly-PDS |
Consultants Costs Year One Year Two Year Three Year Four Year Five Total Contract
| Consultants |
| Hours |
| Rate |
Total Consultant Costs
| INSTRUCTIONS: |
| (1) For evaluation purposes, use the number of hours distributed to consultants by the offeror. |
| (2) Total Consultant Costs for each year must flow to Cost Form A-1. |
Cost Form D
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| Cost Form D |
| Summary of Other Subcontract Costs, Fee/Profit and Price |
| Dragonfly-PDS |
Other Subcontracts Hours Costs Fee/Profit Total Price
| Other Subcontracts |
| Hours |
| Rate |
Total Other Subcontractors
| INSTRUCTIONS: |
| (1) List all Other Subcontractors that do not meet the Significant Subcontractor threshold. See RFP Section L.XXXXX. |
| (2) For evaluation purposes, use the number of hours distributed to other subcontracts by the offeror. |
| (3) Show total proposed hours/costs, fee/profit and price for each Subcontractor for the total contract period of performance. |
| (4) Total Other Subcontract price shall flow to Cost Form A-1. |
Cost Form E
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| COST FORM E |
| Summary for Proposed Other Direct Costs |
| Dragonfly-PDS |
Other Direct Costs Year One Year Two Year Three Year Four Year Five Total Contract
| Travel |
| Miscellaneous |
| Subtotal |
Other ODCs
Subtotal Other Direct Costs
Total Other Direct Costs
| INSTRUCTIONS: |
| (1) List seperatley the amounts proposed for travel and miscellaneous as shown above. |
| (2) List separately any other ODCs; provide supporting details and explanations for each additional ODC proposed. |
| (3) Total Other Direct Costs for each year must flow to Cost Form A-1. |
Cost Form F
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| COST FORM F |
| Direct Labor and Indirect Rates by Contractor Fiscal Year and Contract Year |
| Dragonfly-PDS |
| DIRECT LABOR RATES | Contractor Fiscal Years | Contract Years | |||||||||
| Labor Categories | Exempt / Nonexempt | CFY 2022 | CFY 2023 | CFY 2024 | CFY 2025 | CFY 2026 | Year One | Year Two | Year Three | Year Four | Year Five |
| INDIRECT RATES | Contractor Fiscal Years | Contract Years | |||||||||
| Indirect Rates (List) | Allocation Base | CFY 2022 | CFY 2023 | CFY 2024 | CFY 2025 | CFY 2026 | Year One | Year Two | Year Three | Year Four | Year Five |
| Fringe Benefits | |||||||||||
| Overhead | |||||||||||
| Material/Subcontract Handling | |||||||||||
| G&A |
Facilities Capital Cost of Money
Fixed Fee
| Escalation - Labor |
| Escalation - Other |
| Instructions: |
| (1) Identify Contractor Fiscal Year Rates. |
| (2) If Contract Year rates cross over Contractor Fiscal Year (CFY) rates, show derivation. |
| (3) Contract Year Direct Labor Rates must flow to Cost Form B. |
| (4) Contract Year Indirect Rates must be used to show the indirect costs on Cost Form A-1. |
Cost Form G
| Offeror Name: |
| Proposal Title and Date: |
| Proposal Number: |
| COST FORM G |
| Status of Systems Reviews and Cost Accounting Standards |
| Dragonfly-PDS |
| Approval Status | |||||||
| Description | Status | Date Approved | Yes | No | Pending | N/A | Outstanding Issues |
| Systems Reviews | 1 | ||||||
| Accounting System | |||||||
| Estimating System | |||||||
| Purchasing System | |||||||
| Billling System | |||||||
| Compensation System | |||||||
| Budgeting System | |||||||
| Other Systems |
| Cost Accounting Standards | 2 |
| Cost Accounting Standards Disclosure Statement | |
| Unresolved Cost Accounting Standards Issues |
Forward Pricing Rate Agreement (FPRA) 3
| Instructions: |
| (1) Provide evidence of an approved accounting system including the approval date and name of the reviewing office. Provide a copy of the |
| approval letter in your proposal. Show the approval status for all other systems and provide status of any corrective actions. |
| (2) Provide a statement on the status of the Cost Accounting Standards Disclosure Statement and whether the submitted proposal was developed |
| in accordance with the Disclosure Statement. Also, describe the status of any unresolved Cost Accounting Standards Issues. |
| (3) Indicate whether your labor and indirect rates are based on a Forward Pricing Rate Agreement, what period the FPRA covers, and the approval date. |
| Provide a copy of the FPRA in your proposal. |