This document contains a pricing schedule for ship maintenance services for the USCGC BISCAYNE BAY (WTGB-140). The schedule lists over 30 line items for cleaning, inspecting, overhauling, renewing, and replacing various systems and components on the cutter. Notable items include cleaning exhaust piping, inspecting valves and circuit breakers, renewing deck coverings and doors, and relocating a water tank switch. Accompanying the pricing schedule is a cost estimate template seeking labor rates by location and composite labor rate assumptions. Quotes for these ship maintenance services are due to the US Coast Guard by February 28, 2022. The work appears targeted for performance during an upcoming FY2022 dockside availability period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC BISCAYNE BAY (WTGB-140) DOCKSIDE AVAILABILITY FY2022 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Tank (Water Mist), Clean And Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, Ballast, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-005 | Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-006 | Boiler Exhaust Stack Uptakes, Commercial Clean | JOB | 1 | $0.00 | |
| D-007 | Bubbler Diesel Engine Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-008 | Circuit Breakers (60 Hz), Inspect and Test | JOB | 1 | $0.00 | |
| D-009 | Vent Ducts, Engine And Motor Room, All, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-010 | Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-011 | Vent Ducts, All Other, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-012 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | 1 | $0.00 | |
| D-013 | Water Mist Tank Low Level Switch, Relocate | JOB | 1 | $0.00 | |
| D-014 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-015 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-016 | Vertical Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-017 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-018 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-019 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-020 | Grey Water Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-021 | Sewage Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-022 | Point of Use Potable Water Filters, Install | JOB | 1 | $0.00 | |
| D-023 | Deck Covering, Electrical Matting, Renew | JOB | 1 | $0.00 | |
| D-024 | Firemain Valves, Overhaul or Renew | JOB | 1 | $0.00 | |
| D-025 | Weathertight Doors, Renew | JOB | 1 | $0.00 | |
| D-026 | Garbage Disposal, Renew | JOB | 1 | $0.00 | |
| D-027 | Window, Renew | JOB | 1 | $0.00 | |
| D-028 | Paint Locker Shelving, Install | JOB | 1 | $0.00 | |
| D-029 | Bosn’s Storeroom Coaming, Renew | JOB | 1 | $0.00 | |
| D-030 | Main Drainage Valves, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-031 | Main Motor Cable, Replacement | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 360 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(10/27/2021)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N