ATTACHMENT 1 160377_PNY_Pier4W_MaintDredging - BID SCHEDULE.pdf
PDF 483 KB Posted
- Attached to
- Maintenance Dredging Project, Philadephia, PA Federal contract opportunity
- Solicitation number
- N40085-20-B-0087
About this file
This document contains a bid schedule and solicitation for a maintenance dredging project. The Navy is soliciting bids for dredging approximately 150,000 cubic yards of sediment from the west side of Pier 4 at the Philadelphia Navy Yard using a sealed clamshell bucket. Dredged materials will be transported by barge and disposed at either the Weeks Marine Whites Rehandling Basin in New Jersey or the Waste Management Corporation Biles Island disposal facility in Pennsylvania. Bids are due by a lump sum price on Contract Line Item 0001, which includes mobilization, dredging at a unit rate of $ per cubic yard, downtime compensation at a rate of $ per hour, and removal of obstructions at a rate of $ per ton. Dredging must be completed by September 24, 2021 with no work allowed between March 15 and June 30, 2021. The solicitation number is N40085-20-B-0087 and was issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 6 PNY Full Size Phila Base Map.pdf | ||
| ATTACHMENT 5 SPECS_160377_PNY_Pier4W_MaintDredging_FINAL.pdf | ||
| ATTACHMENT 2 1603077_PNY_Pier 4 West Maint Dredging Plans_FINAL.pdf | ||
| RFP FOR N40085-20-B-0087 Dredging Project.pdf | ||
| ATTACHMENT 4 Appendix_B_160377_PNY_Pier4W_MaintDredging - SPECS.pdf | ||
| ATTACHMENT 7- Pre-Proposal Inquiries Form.xlsx | XLSX spreadsheet | |
| ATTACHMENT 3 Appendix_A_160377_PNY_Pier4W_MaintDredging - SPECS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 20 MAINTENANCE DREDGING @ Philadelphia Navy Yard, Philadelphia, PA, Pier 4 West e-Projects WO# 1603077
DOCUMENT 00 22 13.00 20 Page 1
PRICE PROPOSAL FORM
FY 20 MAINTENANCE DREDGING @ Philadelphia Navy Yard, Philadelphia, PA, Pier 4 West
(eProjects WO# 1603077)
Base Price (CLIN 0001)
CLIN EST. QUANTITY UNIT UNIT PRICE TOTAL PRICE
0001AA 1 LS
0001AB 146,523 CY
0001AC 20 HR
0001AD 10 TON
TOTAL FOR CLIN 0001
DOCUMENT 00 22 13.00 20 Page 2
DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) price for the following items:
CLIN 0001 ‐ BASE PRICE – FY 20 MAINTENANCE DREDGING @ Philadelphia Navy Yard, Philadelphia, PA, Pier 4 West
Price includes the following:
CLIN 0001AA, 0001AB, 0001AC and 0001AD There will be a period of no dredging permitted beginning 15 March 2021 ending 30 June 2021.. All dredging work shall be completed no later than September 24, 2021.
CLIN ITEM UNIT UNIT
PRICE
Estimated Quantity
TOTAL PRICE
(UNIT PRICE X
NO. UNITS)
0001AA Price for mobilization and demobilization of all equipment and personnel to/from the project site.
LS
0001AB Bucket Dredging at the West Side of Pier 4 as shown on plans using a sealed environmental clamshell bucket including transportation by scow (or barge) and disposal of dredge spoils at one of the following two disposal sites:
A) Dredged materials shall be transported by bottom dumping barge or scow and disposed within the Weeks Marine Whites Rehandling Basin, located in Logan Township, Gloucester County, New Jersey.
B) Dredged materials shall be transported by barge and hydraulically unloaded at the Waste Management Corporation Biles Island disposal facility located in Morrisville, Bucks County, Pennsylvania.
CY
146,523
0001AC Downtime (Delays) Pursuant to Specs Sec. 35 20 23, 3.2.2.1 Compensation for Interruption of Operations
HR
DOCUMENT 00 22 13.00 20 Page 3
CLIN 0001 Total Cost $ ________________
1.2 GENERAL BID NOTES
a. Award will be made on the total cost of CLIN 0001. Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. This contract will be awarded as one lump sum with unit prices required for specifically selected work as shown herein. See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS.236-7008, Contract Prices."
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
0001AD Removal and disposal of artificial obstructions and/or debris within dredge area pursuant to Specs Sec. 35 20 23, Par 1.4
TON
File details come from the government source that posted it. Updated .