This document provides a Quality Assurance Surveillance Plan (QASP) for maintenance services for overhead doors under Solicitation SP4702-23-Q-0032 issued by the Defense Logistics Agency. The QASP describes surveillance procedures for validating contractor performance including periodic inspections, complaint investigations, and progress meetings. It outlines roles and responsibilities for the Contracting Officer's Representative and Program Manager to oversee surveillance. The plan details performance metrics for services and corrective action processes for deficiencies.

View the file

Other files for this federal contract opportunity

Other files attached to CSC-23508 DSCC Overhead Doors Service and Maintenance -AMEND 0002, newest first.
File Type Posted
SF30 Amendment 0002.pdf PDF
Attachment 01_Site Visit Sign-In sheet_SP470223Q0032_scan.pdf PDF
SF30 Amendment 0001.pdf PDF
Attachment 04 SECTION B Bid schedule.xlsx XLSX spreadsheet
Attachment 03 Service Contract Wage Rates.pdf PDF
Attachment 08 Combined Site Maps.pdf PDF
Attachment 10 DSCC VISITOR PROCESS (new).pdf PDF
SP4702-23-Q-0032.pdf PDF
Attachment 02 General Conditions.pdf PDF
Attachment 05 SECTION C PWS - Overhead Door Maintenance.pdf PDF
Attachment 01 Security Safety and Fire Provisions.pdf PDF
Attachment 06 SECTION I Clauses.pdf PDF
Attachment 07 Door Chart for SOW.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan

(QASP)

Overhead Door Maintenance

CSC# _23508____________

Contract # _______________________

1. Purpose

1.1 The purpose of this document is to provide guidance on administering subject contract such that the best possible quality in performance can be assured through appropriate surveillance, and addressing of any performance failures as appropriate.

1.2 The contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.

It is also used for assessing contractor’s overall performance, both the good and the bad, which will be used to determine future contract actions with a company (e.g. exercising of options, determining contractor responsibility, and past performance for future awards).

2. Surveillance Procedures

2.1 The Government may inspect and evaluate the Contractor’s performance to ensure Services are received in accordance with requirements in this contract. When a performance threshold has not been met or Contractor performance has not been accomplished, the Government will initiate a Contract Discrepancy Report (CDR) for issuance to the Contractor. The Contractor shall respond to the DS-FCIE Contract Officer Representative (COR) or designee within 10 calendar days of receipt.

2.2 Periodic Validations. The government will evaluate the contractor’s work periodically during performance of the Service. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service within 24 hours of notification or a mutually acceptable time frame.

2.3 Complaints. The Government will receive and investigate complaints.

The Government will be responsible for initially validating customer complaints. The DS-FCIE COR shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR designee and the Contractor. For validated customer complaints of inadequate Service as stated in the Contract, the Contractor shall provide a written corrective action plan within 48 hours of notification.

2.4 Documenting Surveillance.

2.4.1 Progress Meetings. The COR or designees, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed; opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections and valid customer complaints against each performance objective observed and steps taken by the Contractor to prevent occurrences in the future. The minutes of these meetings will be prepared in writing by the COR or designee and any other signatures as deemed appropriate, distributed to the functional area Leads, COR and the Contractor. Should the Contractor not concur with the minutes, the Contractor shall provide a written notification to the COR and Contracting Office identifying areas of non-concurrence for resolution.

2.4.2 Contractor may be asked to provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends.

2.4.3 All documentation resulting from surveillance must be made part of the contract file.

3. Surveillance Plan Summary

The Surveillance Plan Summary is the list of performance objectives and standards that must be performed by the contractor. This details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

3a. Deliverable: Services received as stated and in accordance with this contract.

3b. Standard: Specific to the requirements as stated in the contract.

3c. Measurement Universe: Satisfactory completion of all corrections defined as discrepancies during surveillance.

3d. Acceptable Performance Metric: Successful performance of equipment, facility or related product identified in the Service contract consistent with normal operational features of the item and to the satisfaction of the COR or designee. This will include any training if identified in the contract.

3e. Method of Surveillance: 100% or as defined in the Service contract.

Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities.

Contracting Officer’s Representative (COR) - The COR or the Project Manager (PM) is responsible for providing technical oversight of the Contractor’s performance.

Assigned Primary COR: Douglas Ables Organization: DLA Installation Support – Engineering Telephone: 614-949-0207 Email: douglas.ables@dla.mil

Assigned PM / Alternate COR - The PM and Alternate COR specific to this Service Contract:

Name: John Patrick Organization: DLA Installation Support – Engineering Telephone: 614-692-3645 Email: john.patrick@dla.mil

4. Contractor

Name:

Contract Number:

Telephone:

POC:

Email:

5. Performance Reporting

Please note: The Performance Assessment Report (PAR), Part I, must be completed by the PM. The Customer Complaint Record and Corrective Action Report (CAR) completed as necessary by the PM.

6.1 Performance Assessment Report (PAR):

The PM will complete the PAR, Part I (Parts II and III as necessary) after services have been completed by the Contractor and forward to the

COR.

6.2 Customer Complaint Record:

The PM will complete only as necessary and forward to the COR.

6.3 Corrective Action Report (CAR):

The PM will complete only as necessary and forward to the COR.

(4/28/15)

PERFORMANCE ASSESSMENT REPORT (PAR)

PART I. PERFORMANCE MUST BE COMPLETED BY THE PM AND FORWARDED TO THE COR AFTER SERVICES HAVE BEEN

COMPLETED.

1. CONTRACTOR 2. CONTRACT NUMBER 3. TYPE OF SERVICES

4. PROGRAM MANAGER’S (PM) NAME 5. PHONE 6. DATE WORK COMPLETED

7. (CHECK ALL BOXES THAT APPLY)

NEW

REPEAT

DEFICIENCY

NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS

CHECKED)

10. DETAILED PERFORMANCE ASSESSMENT

11. REVIEWED AND APPROVED BY COR / SIGNATURE AND DATE

PART II. CONTRACTOR VALIDATION PM ONLY COMPLETE AS NECESSARY.

12. CONTRACTOR REPRESENTATIVE CONCUR NON-CONCUR 13. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

14. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR

NON-CONCURRENCE OF PROGRAM MANAGER’S CITED DEFICIENCY

PART III. ACTION CORRECTED PM ONLY COMPLETE AS NECESSARY.

15. CONTRACTOR REPRESENTATIVE REMARKS

16. CONCUR NON-CONCUR PROGRAM MANAGER’S (PM) NAME AND DATE

17. PROGRAM MANAGER’S (PM) REMARKS (REQUIRED)

18. REVIEWED AND APPROVED BY COR / SIGNATURE AND DATE

CUSTOMER COMPLAINT RECORD

1 .DATE/TIM E OF COMPLAINT

SOURCE OF COMPLAINT

2. ORGANIZATION 3. BUILDING NUMBER 4. INDIVIDUAL 5. PHONE NUMBER

6.NATURE OF COMPLAINT

7. CONTRACT REFERENCE

8.VALIDATION

9.DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

10.ACTION TAKEN BY CONTRACTOR

11.RECEIVED/VALIDATED BY PROGRAM MANAGER (PM) / SIGNATURE AND DATE

CORRECTIVE ACTION REPORT (CAR)

1. CONTRACTOR

2. CONTRACTOR REPRESENTATIVE

3. CONTRACT NUMBER

4. TYPE OF SERVICE

5. ORGANIZATION

6. DATE DEFICIENCY CORRECTED

7. DEFICIENCY

FINDING:

FINDING IMPACT:

PLEASE RESPOND WITH A WRITTEN CORRECTIVE ACTION PLAN THAT DETAILS THE CORRECTIVE ACTION OF THE CITED DEFICIENCY, THE CAUSE OF THE DEFICIENCY, AND ACTIONS TAKEN TO PREVENT RECURRENCE.

8. REVIEWED BY PROGRAM MANAGER / SIGNATURE AND DATE

9. COR DETERMINATION / SIGNATURE AND DATE

ACCEPTED REJECTED

Quality Assurance Surveillance Plan (QASP)
1. Purpose
2. Surveillance Procedures
3. Surveillance Plan Summary
Roles and Responsibilities
4. Contractor
5. Performance Reporting