Attachment 04 - Standardized Proposal Breakdown.xls
XLS spreadsheet 45 KB Posted
- Attached to
- LWS ATCT Elevator Modernization Federal contract opportunity
- Solicitation number
- 697DCK-23-R-00431
About this file
This document includes an attachment template for standardized elevator modernization proposals and details of a related federal contract opportunity. The Federal Aviation Administration is seeking proposals for elevator modernization and full service maintenance at the Airport Traffic Control Tower in Lewiston, Idaho. Interested vendors must have a valid SAM registration and submit a proposal in accordance with the solicitation instructions and evaluation criteria. Proposals should include a narrative description and completed cost template breaking down equipment, labor, and other costs for modernization, construction, maintenance, and any additional items. The maintenance contract would provide monthly and as-needed service for an initial base year.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-23-R-00431-003.pdf | ||
| Pre-Bid QA - Responses.pdf | ||
| Attachment 03- SCA Wage Rates Revised.txt | TXT text file | |
| 697DCK-23-R-00431-0002.pdf | ||
| 697DCK-23-R-00431-0001.pdf | ||
| Attachment 1 - LWS ATCT Elevator - PWS.pdf | ||
| Attachment 03- SCA Wage Rates.txt | TXT text file | |
| Attachment 05 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 02- Davis Bacon Wage Rates.txt | TXT text file | |
| 697DCK-23-R-00431 Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | |||
| PROJECT: | ||||
| VENDOR: | ||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||
| ITEM | EQUIPMENT COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | ||
| Modernization Requirements: | ||||
| Electronics/Controls/Software | thiat | $ - 0 | $ - 0 | |
| Electrical | $ - 0 | $ - 0 | $ - 0 | |
| Mechanical/Drives/Sheaves/Traveling Cable | $ - 0 | $ - 0 | $ - 0 | |
| Safety Equipment | $ - 0 | $ - 0 | $ - 0 | |
| Cab Interior/Finishes | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | |
| Construction/Install: | ||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| After Hours Variance: | ||||
| Modernization/Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MODERNIZATION TOTAL | $ - 0 | |||
| Performance Maintenance: | ||||
| Maintenance Fee (monthly) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Maintenance Monitoring (as required) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| MAINTENANCE TOTAL (Annual) Base Year | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
File details come from the government source that posted it. Updated .