Attachment 0009 AED Requirments Data.pdf

PDF 4 KB Posted

Attached to
CH-47 Video Interface Group
Solicitation number
W58RGZ-21-R-0091
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

03/20/2020

M505-01PRID 822-2017-002Part Number

5836-01-591-1755NSN CH-47System

VIDEO INTERFACE GROUPNomenclature

NAdequate DMWR Available?

DMWR ID

DMWR Date

DMWR Chg #

YPre-Award Survey Recommended?

NCorrelation Performance Study Required ? YPVA Recommended?

Not Applicable

Identify Any Special Processes, Test Procedures, and/or Instructions

NCritical Safety Item?

There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Video Interface Group at the time of this review.

Special Airworthiness Considerations

SRD-A/W Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 30 Jan 2020. The part is Non-CSI and Non-NST. DEM

Other Requirements / Comments

13499If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:

YSpecial Post-Contract Award Requirements?

The Prime or OEM is required to submit an M & O Plan 30 days after contract award to Aviation Engineering Directorate (AED).

The M & O plan will be reviewed and require approval by AED prior to government acceptance of contract deliverable assets.

Special Post-Contract Award Requirements

No DMWR is available. Recommend contacting CH-47 PM IUID Office, Jennifer Bishop, for any updates and/or waiver/deviation of IUID Contracting DFAR clauses on the IUID marking of the Video Interface Group.

Other Requirements / Comments (Part II)

No DMWR and non-CSI. QE-STD 2 is not required.

Other Requirements / Comments (Part III)

FCDD-SRD-A/W-AMA-M-Sustainment has re-verified the CSI/NST status through the ARISE CIM database on 21 Feb 2020.

The part is Non-CSI and Non-NST. No changes made. DEM

Other Requirements / Comments (Part IV)

Other Requirements / Comments (Part V)

NDoes QE-STD-2 Apply?

N

Additional CSI Requirements

CSI Contains CSI Replacement Parts? NEngineering Testing Required?

The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:

1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.

RStatus

NTDPL?

Approved Date

M&O AED REQUIREMENTS DATA

Correlation Performance Study Requirements

Commerciality Determination

Commercial Item? N NBest Commercial Practice Acceptable?

03/20/2020

M505-01PRID 822-2017-002Part Number

5836-01-591-1755NSN CH-47System

Not Applicable

Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes

MEOs Required for Competitive Contract?

RStatus

File details come from the government source that posted it. Updated .