This document is an attachment providing site visit information for a federal contract opportunity.
The attachment outlines details for an organized site visit on Monday, September 9, 2024 at 10:00 a.m. Arizona Standard Time at the Williams Creek National Fish Hatchery in McNary, AZ. It provides directions to the site, notes limited cell service but available WiFi, and instructs contractors to RSVP to the Contract Specialist and Project Leader no later than 24 hours prior to the visit. The related federal contract opportunity is for the design, shipping, and erection of an open-sided roofed steel structure over an existing 54'x110' concrete fish rearing raceway at the Williams Creek National Fish Hatchery. Interested contractors are strongly encouraged to conduct the site visit per FAR 36.523. Requests for information and quotes shall be submitted to the Contract Specialist via email.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FC124Q0033_Amd_0003.pdf | ||
| Amend3_3-0019_NoticeToOfferors_0003.pdf | ||
| Sol_140FC124Q0033_Amd_0002.pdf | ||
| Amend2_140FC124Q0033_Q-A_0002.pdf | ||
| Amend1_Attach3_BidSchedule_0001.docx | DOCX document | |
| Sol_140FC124Q0033_Amd_0001.pdf | ||
| Amend1_TermsConditionsUpdated_AZ-WmCrkNFH_Structure_42pp_0001.pdf | ||
| Sol_140FC124Q0033.pdf | ||
| 3-0019_Notice_to_Offerors.pdf | ||
| 140FC124Q0033_TC_AZ-WmCrkNFH_Structure_42pp.pdf | ||
| Attch2_SitePhoto_EbankRaceways_10008672.jpg | JPG image | |
| Attach3_BidSchedule.docx | DOCX document | |
| Attch5_WD_AZ20240027v3_240719_7pp.pdf | ||
| Attch1_SOW_ConstructNewCanopyForExistingE-BankRaceway.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
52.236-27 – SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for Monday, September 9, 2024, at 10:00 a.m. Arizona Standard Time
(c) Participants will meet at Williams Creek NFH, McNary, AZ. See attachment for directions to the site.
(d) Site Visit Point of Contact: Craig Thomas, Project Leader, Mobile: 509-433-4869, Email:
craig_thomas@fws.gov
Contractors must RSVP to the Contract Specialist (nicole_c_Johnson@fws.gov) and Project Leader (craig_thomas@fws.gov) no later than 24 hours prior to the site visit if planning to attend.
This contact information is for site visit registration and information ONLY. Do not send technical or other questions about the RFQ to the Project Leader – all questions must be sent to the contract specialist at nicole_c_johnson@fws.gov.
(e) Please provide the following information with your site registration email.
1. Name
2. Company
3. Position
(End of Provision)
DIRECTIONS:
The address #1 Williams Creek Hatchery Road, McNary, AZ, 85930 is not a "real" address, but it works for shipping boxes via UPS and FedEx. Most google map searches for 'Williams Cr. NFH' will get you to the hatchery. But with so many people using different maps and phones it may not always work for everyone.
Below are written directions and Google map. Cell service is very limited at the Hatchery, but there is WIFI at the Office/Feed building.
Driving instructions:
From Hon Dah Casino/Hotel head south on HWY 73 drive about 4 miles and make a left hand turn shortly after a road sign that says Williams Cr. NFH. The left turn is on a downhill as the HWY makes a sweeping right hand turn that can make it challenging to see oncoming traffic.
After making left turn stay on asphalt road for approx. 8 to 8.5 miles, the hatchery is at the dead end of the road. There is one sign for Williams Cr. NFH. about 1-mile after turning off HWY 73, Stay on pavement (Do not make any turns onto gravel roads) and watch for a couple of rough spots on road starting about 5-7 miles along the way.
From Hon Dah it's about a 20-25 min. drive to Williams Cr.
mailto:nicole_c_Johnson@fws.gov mailto:craig_thomas@fws.gov mailto:nicole_c_johnson@fws.gov
Attachment 4
Be more mindful on drive back out to highway, you will need to drive on the wrong side of the road at a couple of spots.