Attach J-4 Rock Creek Trail Bridge Drawings_Q0098.pdf

PDF 13 MB Posted

Attached to
BITTERROOT NATIONAL FOREST - Rock Creek Trail Bridge Replacement Federal contract opportunity
Solicitation number
12034320Q0098
Issued by
Department of Agriculture Forest Service R1-Northern Region

View the file

Other files for this federal contract opportunity

Other files attached to BITTERROOT NATIONAL FOREST - Rock Creek Trail Bridge Replacement, newest first.
File Type Posted
Questions and Answers No. 2_Q0098.pdf PDF
Amendment 1 Changes and QA Q0098.pdf PDF
Attach J-1 WD MT20200079_Q0098.pdf PDF
Attach J-2 Rock Creek Experience Questionnaire_Q0098.pdf PDF
Rock Creek Trail Bridge RFQ_12034320Q0098.pdf PDF
Attach J-3 Rock Creek Trail Bridge_580-3.0_FSSS_Q0098.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Native Surfadng

4'-0"

8'-0"

4'-0" f'-CIL , Trail

Trail Embankment

NORTH APPROACH (ABUT. NO. 1) TRAIL CONSTRUCTION

Abutment No. 3 Backwa/1. See Sheet 12

I

Not to Scale

//1/ 1/ , 6'-0"

9.

3'x 3'x9'

Gab/on Basket

- - I -

I I. .+ ,J I � -•t I f?J l'fl Ii I

SOUTH APPROACH (ABUT. NO. 3) PLAN

Scale: 1"

= 5'

398D

397D

398D

397D

NORTH APPROACH CONSTRUCTION:

Begin fill at Sta 0+99 and continue to face of

Backwall at Sta. 1+06.5.

Estimated Volume of Trail Embankment = 75 cf.

Native Surfacing

Trail Embankment

(I')

Separation Geotextile Type II-A

Gabion Basket

3974.6 "' , typical

398D

GABION BASKETS

Use Gab/on Baskets fabricated from Welded Wire Mesh (U.S. Standard Gage 9). Baskets Constructed from Twisted Wire Mesh WIii Not Be Allowed.

Use hard, durable rock to fl/I the Gablons.

SOUTH APPROACH CONSTRUCTION:

Begin fill at Sta 1 + 71 at face of Backwall and continue to Sta. 1+83

Estimated Volume of Trail Embankment = 100 cf.

REGION ONE

DRAWING DATE: Date � Revised Date ___ --1 � Revised Date_· ----t � Revised Date ___ -t � Revised Date

ROCK CREEK TRAIL BRIDGE

TRAIL DETAILS

Designed CT Drawn CT

Design Checked MTJ Drawing Checked MTJ SHEET 5 OF 16

Gabion basket placement to be field verified and approved by the CO prior to filling.

West gabion basket shall be placed to also direct seepage flow down drainage.

(Commercial source)

File details come from the government source that posted it. Updated .