Amendment 1 Changes and QA Q0098.pdf

PDF 555 KB Posted

Attached to
BITTERROOT NATIONAL FOREST - Rock Creek Trail Bridge Replacement Federal contract opportunity
Solicitation number
12034320Q0098
Issued by
Department of Agriculture Forest Service R1-Northern Region

View the file

Other files for this federal contract opportunity

Other files attached to BITTERROOT NATIONAL FOREST - Rock Creek Trail Bridge Replacement, newest first.
File Type Posted
Questions and Answers No. 2_Q0098.pdf PDF
Attach J-1 WD MT20200079_Q0098.pdf PDF
Attach J-4 Rock Creek Trail Bridge Drawings_Q0098.pdf PDF
Rock Creek Trail Bridge RFQ_12034320Q0098.pdf PDF
Attach J-2 Rock Creek Experience Questionnaire_Q0098.pdf PDF
Attach J-3 Rock Creek Trail Bridge_580-3.0_FSSS_Q0098.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0001 4/29/2020

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

US Department of Agriculture Forest Service Region 1 Acquisition Management 24 Fort Missoula Road Missoula, MT 59804

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

12034320Q0098

9B. DATED (SEE ITEM 11)

4/17/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning _01 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

$ zero cost

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _01 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of Amendment 0001 is to change the contract time and provide the Government’s response to questions received:

1. Section C- 4 CONTRACT TIME should be changed from it’s current language to what is shown below:

C-4 CONTRACT TIME

It is estimated that once the contract is awarded, a notice to proceed for materials will be issued. Work can begin on or around September 8, 2020. All work must be completed by October 20, 2020. Contract time will run continuously with no shutdown.

**PLEASE NOTE: The Request for Quote due date HAS NOT CHANGED from the original closing date of MAY 19, 2020 at 3:00

P.M. MST.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JEFFREY GARDNER

Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION 12034320Q0098

AMENDMENT #1

ROCK CREEK TRAIL BRIDGE REPLACEMENT PROJECT

QUESTIONS AND ANSWERS #1

The Following questions have been received via email:

1. Question: Can small excavators, skid steers, and UTV's drive down the trail Answer: No, the two trails (Trail #580 on the south side of the lake, and Trail #502 on the north side of the lake) leading to the bridge site are inaccessible for small excavators, skid steers, and UTV’s. This is a backcountry bridge location. The expectation is that supplies and materials will be flown in or packed in. Depending on the reservoir elevation, supplies, materials, and personnel can also boat up the reservoir. At full pool the reservoir is within a tenth of a mile from the bridge site. In September though, the reservoir level could be a couple of miles from the bridge location.

2. Question: Can we use a UTV with a trailer to transport material to the project site?

Answer: No, the trails do not accommodate UTV’s and trailers.

3. Question: Will an ATV (with trailer or without) be able to bring supplies?

Answer: No, the trails do not accommodate ATV’s with or without trailers.

4. Question: Will a motorcycle be allowed to bring supplies if the ATV won't?

Answer: Motorcycle use on the trail on the south side of the lake (Trail # 580 ) will be allowed to transport people and supplies with approval from the CO.