Attach H - VA St Cloud Repair B50 Kitchen 100 CD_Drawings.pdf
PDF 40 MB Posted
- Solicitation number
- 36C26326B0009_1
About this file
These architectural construction documents detail a renovation project for Building 50's basement kitchen at the Saint Cloud VA Medical Center in Minnesota. The project involves a comprehensive repair and upgrade of the basement kitchen area, encompassing approximately 1,417 square feet across multiple rooms including a kitchen tray service area, HAC spaces, cart staging, and a cart wash area. The documents are 100% construction documents dated September 29, 2025, prepared by Stone Group Architects and include detailed plans for demolition, floor layouts, ceiling plans, interior elevations, wall sections, and finish specifications.
Key technical aspects include installing new ceramic wall tiles, quarry tile flooring, wall protection systems, and updating mechanical, electrical, and plumbing infrastructure. The project requires strict adherence to VA infection control protocols, with specific requirements for construction barriers, negative air pressure monitoring, and dust containment. The renovation involves removing existing equipment, reconfiguring spaces, installing new doors and windows, and implementing accessibility features consistent with VA barrier-free design standards. The project is part of VA solicitation 36C26326B0009_1 under Veterans Health Administration Veterans Integrated Service Network 23, with the work focused on modernizing and improving the facility's kitchen and support spaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SYMBOLS & ANNOTATION LEGEND:
TYPICAL DIMENSION LINE
BREAK LINE
DETAIL INDICATORXX
X-XXX
DETAIL INDICATORXX
X-XXX
XX WALL SECTION INDICATOR
X
X-XXX XX X-XXX EXTERIOR ELEVATION INDICATOR
ELEVATION / LEVEL INDICATOR
CENTER LINE
INTERIOR ELEVATION INDICATORX-XXX
XX
X-XXX
XX
XX
XX
XX
NORTH ARROW(S)
CG
CORNER GUARD
FEC FIRE EXTINGUISHER CABINET
X.X KEYNOTE
X NEW GRID LINE
XXX
ROOM
XXX FINISH INDICATOR
XXX
XX
DRAWING TITLE
X"=X'-X"
XX
TRUE
NORTH
PLAN
NORTH
XX
X-XXX
BUILDING SECTION INDICATOR
XX
X-XXX
DETAIL INDICATOR
X-XXX
NORTH
EXISTING GRID LINEX
XX / XXX
SPOT ELEVATION INDICATOR
LEVEL TITLE
TYPICAL DRAWING BLOCK TITLE
DRAWING REFERENCE
X'-X"
ELEVATION / LEVEL INDICATOR
LEVEL TITLE
X'-X"
X' X"
D R
A W
IN
G
R E
F E
R E
N C
E S
P
D F
L
IN
K S
SPOT COORDINATE INDICATOR
X'-X"
CR
X'-X" / X'-X"
SLOPE INDICATOR
X
XX
XX
REVISION / ISSUE INDICATOR
CARD READER
ROOF TYPE INDICATOR
WINDOW / STOREFRONT TYPE INDICATOR
PARTITION TYPE
DOOR / OPENING INDICATOR
(BORROWED LIGHT INCLUDED)
ROOM INDICATOR
EQUIPMENT INDICATOR
TYPE X
X'-X" A.F.F.
CEILING TYPE INDICATOR
XXX
VICINITY MAP
PROJECT VICINITY
NORTHNORTH
BLDG 50
KEY PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT OF RECORD
A/E:
STAMP
CONSULTANTS
321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
100% CONSTRUCTION DOCUMENTS
REPAIR BUILDING 50 BASEMENT KITCHEN
SAINT CLOUD, MN
VA# 656-20-130
STONE GROUP ARCHITECTS
600 E 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
DUNHAM
50 SOUTH SIXTH STREET
SUITE 1100
MINNEAPOLIS, MN 55402
612-465-7550
P.O.C.: JASON GOTWALTT (M)
BEN ZURN (E)
MECHANICAL, ELECTRICAL, PLUMBING:
Phase
Drawing Title
DATE:
APPROVED: SERVICE LINE DIRECTOR DATE:
APPROVED: GEMS COORDINATOR DATE:
APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:
APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECT COR
APPROVED: SAFETY MANAGER
DATE:
C U s e rs
\d .t o u g a s \D o c u m e n ts \2
V
A S t C lo u d
R e p a ir B
B a s e m e n t K it c h e n d a rr in tJ
Y L
.r v t
/3
/2
:5
:1
P
M
GI000
COVER SHEET
P.O.C.: JESSE KLANKOWSKI
JK DT09-30-2025
ABBREVIATIONS
SYMBOLS
CENTERLINE
# POUND / NUMBER
& AND
< ANGLE
<< DOUBLE ANGLE
@ AT
d PENNEY
Ø ROUND OR DIAMETER
A
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
ABBRV ABBREVIATION
ABV ABOVE
AC ASPHALTIC CONCRETE / AIR CONDITIONER
ACC ACCESSIBLE
ACM ALUMINUM COMPOSITE MATERIAL
ACOUS ACOUSTICAL
ACP ACOUSTICAL CEILING PANEL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE / ADJACENT / ADJOINING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AL ALUMINUM
ALN ALIGN
ALT ALTERNATIVE / ALTERNATE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
APX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
AWF ARCHITECTURAL WINDOW FILM
B
B&B BOARD AND BATTEN / BALLED AND BURLAPPED
BATT BLANKET INSULATION / FIBERGLASS INSULATION
BD BOARD / BARN DOOR
BEV BEVELED
BF BIFOLD
BFF BELOW FINISH FLOOR
BL BRICK LEDGE
BLDG BUILDING
BLKG BLOCK / BLOCKING
BM BEAM
BO BOTTOM OF
BOC BOTTOM OF CONCRETE
BOF BOTTOM OF FOOTING
BOT BOTTOM
BRG BEARING
BRK BRICK
BRKT BRACKET
BRNG BEARING
BSMT BASEMENT
BTWN BETWEEN
BUF BUILT UP FLOORING
BUR BUILT UP ROOFING
C
C CELSIUS
CA CONSTRUCTION ADMINISTRATION
CAB CABINET
CB CERAMIC BASE
ABBREVIATIONS
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS / COILING DOOR
CEM CEMENT
CF CUBIC FEET/ CUBIC FOOT
CG CORNER GUARD
CH CHANNEL
CHR CHAIR RAIL
CIPC CAST-IN-PLACE CONCRETE
CIV CIVIL
CJ CONSTRUCTION JOINT / CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLKG CAULKING
CLO CLOSET
CLR CLEAR / CLEARANCE / CLEAR SPACE
CM CONSTRUCTION MANAGER
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
CO CHANGE ORDER / CLEANOUT
COL COLUMN
COMB COMBINATION / COMBINE / COMBINED
COMP COMPOSITE / COMPOSITION
CONC CONCRETE
CONN CONNECT / CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS / CONTINUE / CONTINUED
CONTR CONTRACT / CONTRACTOR
COORD COORDINATE / COORDINATION / COORDINATOR
CORR CORRUGATED / CORRIDOR
CPPT CARPET TILE
CPT CARPET
CR CRASH RAIL / CARD READER
CSMT CASEMENT
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER / CENTERED
CV CENTER VISION
D
D DEPTH / DEEP
DBL DOUBLE
DD DESIGN DEVELOPMENT / DUTCH DOOR
DEMO DEMOLITION / DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWR DRAWER
DWTR DUMBWAITER
E
(E) EXISTING
E EAST
EA EACH
EDT ELECTROSTATIC DISSIPATIVE TILE
EF EACH FACE
EG END GUARD
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ABBREVIATIONS
ELVR ELEVATOR
EMER EMERGENCY
ENGR ENGINEER / ENGINEERED
ENL ENLARGED
EOP EDGE OF PAVEMENT
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
MEMBRANE
EPS EXPANDED POLYSTYRENE BOARD
EPT EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EST ESTIMATE
ETC ETCETERA
ETR EXISTING TO REMAIN
EV ELECTRIC VEHICLE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXC EXCAVATE / EXCAVATION
EXH EXHAUST
EXP EXPANSION/EXPOSED
EXST EXISTING
EXT EXTERIOR
F
FA FIRE ALARM
FAB FABRICATE / FABRICATION / FABRICATED
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FULL GLASS
FIN FINISH / FINISHED
FLR FLOOR / FLOORING
FLUOR FLUORESCENT
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD / FACE OF STRUCTURE
FP FLUSH PANEL / FIRE PROTECTION / FLOOR PLAN
FR FIRE RESISTANT / FRAME
FRP FIBERGLASS REINFORCED PANEL
FRPOLY FIBERGLASS REINFORCED POLYMER
FS FLOOR SINK
FT FOOT / FEET / FIRE TREATED
FTG FOOTING
FURN FURNISH / FUNITURE
FUT FUTURE
G
G GALLON / GALLONS
GA GAGE / GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GI GALVANIZED IRON
GL GLASS
GLU GLUE
GSF GROSS SQUARE FOOTAGE / GROSS SQUARE FEET
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
ABBREVIATIONS
H
H HIGH / HEIGHT
HB HOSE BIB
HC HANDICAP / HOLLOW CORE / HAT CHANNEL
HD HEAVY DUTY
HDBD HARDBOARD
HDR HEADER
HDWR HARDWARE
HG HALF GLASS
HM HOLLOW METAL
HORZ HORIZONTAL
HR HOUR / HANDRAIL
HSK HOUSEKEEPING
HT HEIGHT
HVAC HEATING, VENTILATION, AIRCONDITIONING
HWC HYGIENIC WALL CLADDING
I
IB INTEGRAL BASE
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
ID INSIDE DIAMETER / INSIDE DIMENSION / INTERIOR
DESIGN
IFC INTERNATIONAL FIRE CODE
IN INCH / INCHES
INCL INCLUDE /INCLUDED / INCLUDING
INFO INFORMATION
INSP INSPEC / INSPECTION / INSPECTOR
INSTR INSTRUCTION / INSTRUCTIONS
INSUL INSULATE/ INSULATED / INSULATION
INT INTERIOR
J
JAN JANITOR
JST JOIST
JT JOINT
K
KCJ KEYED CONSTRUCTION JOINT
KO KNOCK OUT
L
L LENGHT / LONG
LAB LABORATORY
LAM LAMINATE / LAMINATED
LAV LAVATORY
LB POUND
LF LINEAR FEET
LH LEFT HAND
LKR LOCKER
LOC LOCATION
LONG LONGITUDINAL
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MC MEDICINE CABINET
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURE / MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MNTG MOUNTING
ABBREVIATIONS
MO MASONRY OPENING
MR MIRROR
MT METAL TRIM
MTL METAL
N
(N) NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NSF NET SQUARE FOOTAGE / NET SQUARE FEET
NTS NOT TO SCALE
NV NARROW VISION
O
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED; CONTRACTOR INSTALLED
OFOI OWNER FURNISHED; OWNER INSTALLED
OH OVERHEAD
OPG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN / ORDINANCE
ORIG ORIGINAL
OZ OUNCE
P
P PAINT
PAR PARALLEL
PCF POUNDS PER CUBIC FOOT
PD PRE-DESIGN / POCKET DOOR
PED PEDISTAL
PEM PRE-ENGINEERED METAL
PEMB PRE-ENIGNNERED METAL BUILDING
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE
PLAM PLASTIC LAMINATE
PLMG PLUMBING
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PR PAIR / PROPOSAL REQUEST
PRCST PRECAST
PREFAB PREFABRICATE / PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT / PRESSURE TREATED / PORCELAIN TILE
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PTR PAPER TOWEL RECEPTICAL
PVC POLYVINYL CHOLORIDE
Q
QT QUARRY TILE / QUART / QUARTS
R
R RADIUS / RISER
RB RESILIENT BASE
RBR RUBBER
RC RESILIENT CHANNEL
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
REC RECESSED
REF REFERENCE / REFRIGERATOR
ABBREVIATIONS
REINF REINFORC (D), (ING), (MENT)
REQ REQUIRE
REQD REQUIRED
RES RESINOUS
RET RETURN / RETURNED
REV REVISION / REVISIONS / REVISED
RF RESILIENT FLOORING
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RI RIGID INSULATION
RL RIDGE LINE
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RVS REVERSE / REVERSE SIDE
RWC RIGID WALL COVERING
RWL RAIN WATER LEADER
S
S SOUTH
SAFB SOUND ATTENUATION FIRE BLANKETS
SB SPLASH BACK
SC SOLID CORE / SPECIALTY COATING
SCHED SCHEDULE
SCR SHOWER CURTAIN ROD
SD SOAP DISPENSER / SCHEMATIC DESIGN / SLIDING
DOOR
SDG SIDING
SECT SECTION
SF SQUARE FOOTAGE / SQUARE FEET
SG SAFETY GLASS
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLDG SLIDING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNX SANIARY NAPKIN DISPOSAL
SOG SLAB ON GRADE
SPEC SPECIFICATION / SPECIFICATIONS
SQ SQUARE
SS SOLID SURFACE
SSM SOLID SURFACE MATERIAL
SST STAINLESS STEEL
ST STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SW SHEARWALL
SYM SYMMETRICAL
T
T TREAD
T&B TOP AND BOTTOM
T&G TOUNGE AND GROOVE
TB TOWEL BAR
TBD TO BE DETERMINED
TEMP TEMPORARY / TEMPERED
TER TERRAZZO
TFE TOP FOOTING ELEVATION
THD THREA / THREADED / THREADS
THK THICKNESS
ABBREVIATIONS
THRU THROUGH
TKBD TACKBOARD
TL TILE
TO TOP OF
TOB TOP OF BEAM
TOC TOP O F CONCRETE / TOP OF CURB
TOD TOP OF DECK
TOF TOP OF FOOTING / TOP OF FOUNDATION
TOJ TOP OF JOIST
TOM TOP OF MASONRY
TOP TOP OF PIER
TOS TOP OF SLAB / TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPO THERMOPLASTIC POLYOLEFIN
TPTN TOILET PARTITION
TRANS TRANSVERSE / TRANSPARENT
TS TUBE STEEL / TRANSITION STRIP
TYP TYPICAL
U
UG UNDERGROUND
UH UNIT HEATER
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UTIL UTILITY / UTILITIES
UTL UTILITY / UTILITIES
V
V SHEAR
VAR VARIES
VB VAPOR BARRIER
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFY VERIFY
VIF VERIFY IN FIELD
VR VAPOR RETARDER
VWC VINYL WALL COVERING
W
(W) WIDE FLANGE
W WEST / WIDTH / WIDE / WIDE FLANGE
W/ WITH
W/O WITHOUT
WA WEDGE ACHOR
WB WOOD BASE
WC WATER CLOSET
WD WOOD / WOODWORK
WDW WINDOW
WF WIDE FLANGE
WG WALL GUARD
WH WATER HEATER
WI WROUGHT IRON
WL WIND LOAD
WP WATERPROOF / WATERPROOFING
WR WATER RESISTANT
WSCT WAINSCOT
WSF WELDED SHEET FLOORING
WT WEIGHT / WINDOW TREATMENT
WWF WELDED WIRE FABRIC
REPAIR BUILDING 50 BASEMENT
KITCHEN
100% CONSTRUCTION DOCUMENTS
09-30-2025
4801 VETERANS DRIVE, ST CLOUD, MN 56303
VA# 656-20-130
BUILDING 50
ST CLOUD VA HEALTHCARE SYSTEM
SHEET INDEX
01 - GENERAL
GI000 COVER SHEET
GI001 CODE REVIEW
GI011 ACCESSIBILITY DETAILS
GI021 ICRA
GI022 SITE / PHASING PLAN
GI101 BASEMENT LEVEL LIFE SAFETY PLAN
05 - ARCHITECTURAL DEMOLITION
AD101 BASEMENT LEVEL DEMOLITION PLAN
AD111 BASEMENT LEVEL DEMOLITION RCP
06 - ARCHITECTURAL
AE100 CRAWL SPACE FLOOR PLAN
AE101 BASEMENT LEVEL FLOOR PLAN
AE102 BASEMENT LEVEL FLOOR DRAINAGE PLAN
AE111 BASEMENT LEVEL REFLECTED CEILING PLAN
AE301 WALL SECTIONS & WALL TYPES
AE451 INTERIOR ELEVATIONS, DOOR SCHEDULE & DETAILS
AE501 ARCHITECTURAL DETAILS
AE801 BASEMENT LEVEL FINISH PLAN
07 - PLUMBING
M000 MECHANICAL TITLE SHEET
FD101 BASEMENT LEVEL - DEMOLITION FIRE PROTECTION PLAN
FP101 BASEMENT LEVEL - FIRE PROTECTION PLAN
PD001 CRAWL SPACE - DEMOLITION PLUMBING PLAN
PD101 BASEMENT LEVEL - DEMOLITION PLUMBING PLAN
P001 CRAWL SPACE PLUMBING PLAN
P101 BASEMENT LEVEL PLUMBING PLAN
P301 DOMESTIC WATER RISER DIAGRAM
P302 WASTE AND VENT RISER DIAGRAM
P400 PLUMBING DETAILS
P500 PLUMBING SCHEDULES
08 - MECHANICAL
MHD101 BASEMENT LEVEL - DEMOLTION HVAC PLAN
MPD001 CRAWL SPACE - DEMOLITION PIPING PLAN
MPD101 BASEMENT LEVEL - DEMOLITION PIPING PLAN
MH101 BASEMENT LEVEL HVAC PLAN
MP001 CRAWL SPACE PIPING PLAN
MP101 BASEMENT LEVEL PIPING PLAN
M301 AIRFLOW DIAGRAMS
M400 MECHANICAL DETAILS
M401 MECHANICAL ELEVATION AND ISOMETRIC VIEWS
M402 KITCHEN EXHAUST HOOD DETAILS
M500 MECHANICAL SCHEDULES
M501 MECHANICAL ELECTRICAL MAU SCHEDULES
M600 SEQUENCE OF OPERATIONS
M601 SEQUENCE OF OPERATIONS
09 - ELECTRICAL
E000 ELECTRICAL TITLE SHEET
E100 BASEMENT ORIENTATION PLAN
ED101 BASEMENT LEVEL DEMOLITION PLAN
EL101 BASEMENT LEVEL LIGHTING PLAN
EP001 CRAWLSPACE POWER PLAN
EP101 BASEMENT LEVEL POWER PLAN
ES101 BASEMENT LEVEL SYSTEMS PLAN
FA101 BASEMENT LEVEL FIRE ALARM PLAN
FA500 FIRE ALARM DETAILS
E300 ELECTRICAL RISER
E500 ELECTRICAL DETAILS
E600 ELECTRICAL SCHEDULES
TOTAL SHEET COUNT: 53
Revision# Description Date:
1 100% CONSTRUCTION DOCUMENTS 09-29-2025
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT OF RECORD
A/E:
STAMP
CONSULTANTS
321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
100% CONSTRUCTION DOCUMENTS
REPAIR BUILDING 50 BASEMENT KITCHEN
SAINT CLOUD, MN
VA# 656-20-130
STONE GROUP ARCHITECTS
600 E 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
DUNHAM
50 SOUTH SIXTH STREET
SUITE 1100
MINNEAPOLIS, MN 55402
612-465-7550
P.O.C.: JASON GOTWALTT (M)
BEN ZURN (E)
MECHANICAL, ELECTRICAL, PLUMBING:
Phase
Drawing Title
DATE:
APPROVED: SERVICE LINE DIRECTOR DATE:
APPROVED: GEMS COORDINATOR DATE:
APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:
APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECT COR
APPROVED: SAFETY MANAGER
DATE:
C U s e rs
\d .t o u g a s \D o c u m e n ts \2
V
A S t C lo u d
R e p a ir B
B a s e m e n t K it c h e n d a rr in tJ
Y L
.r v t
/3
/2
:5
:2
P
M
GI001
CODE REVIEW
P.O.C.: JESSE KLANKOWSKI
JK DT09-30-2025
HORIZONTAL BUILDING SEPARATION
ALLOWANCE
NONE N/A NFPA 5000 CH6
INCIDENTAL USES SEPARATION IF REQUIRED SOILED, LINEN, CLEAN, STORGE> 100SF SEE LIFE SAFETY PLANS NFPA 5000 CH6
SEPARATION OF OCCUPANCIES IF REQUIRED 2 HR PER 2HR NFPA 5000 CH6
ALLOWABLE AREA UNLIMITED PARTIAL REMODEL OF EXISITNG NFPA 5000 CH7
SPRINKLER SYSTEM FULL SPRINKLER SYSTEM MODIFICATIONS TO EXISTING NFPA 13
ALLOWABLE NUMBER OF STORIES ABOVE
GRADE PLANE
UNLIMITED 3 STORIES (EXISTING) NFPA 5000 CH7
ALLOWABLE BUILDING HEIGHT IN FEET... UNLIMITED 60 FT (EXISTING) NFPA 5000 CH7
BUILDING CONSTRUCTION TYPE TYPE 1 (221) NFPA 5000 CH6
ADDRESS IDENTIFICATION EXISTING N/A 501.2
BUILDING HEIGHTS & AREAS NFPA
SPECIALTY OCCUPANCY REQUIREMENTS NFPA
MIXED OCCUPANCY (EXISTING) BUSINESS (NFPA), B (IBC) NFPA CHAPTER...
BUILDING OCCUPANCY (EXISTING) HEALTH CARE (NFPA), I-2 (IBC) NFPA CHAPTER...
OCCUPANCY GROUP NFPA
BUILDING CLASSIFICATION
HEIGHT N/A N/A
LOT FRONTAGE N/A N/A
STREET SIDE YARD N/A N/A
SIDE N/A N/A
REAR N/A N/A
FRONT N/A N/A
SETBACKS REQ NFPA
NUMBER OF VAN ACCESSIBLE STALLS
REQUIRED
N/A N/A
NUMBER OF ACCESSIBLE STALLS REQUIRED N/A N/A
NUMBER OF STALLS REQUIRED N/A N/A
PARKING REQ: NFPA
CODE / AHJ REQUIREMENTS ACTUAL PROVIDED
NFPA CODE
REFERENCE
PERMIT REQ'D Y/N: NO
ZONE:
AHJ: VA SAFETY OFFICER AND FACILITY SAFETY ENGINEER
* STATE AND LOCAL ORDINANCES AS APPLY
* 2025 VA SPACE PLANNING CRITERIA (VA-TIL)
* 2025 VA STANDARDS (VA-TIL)
* 2022 FACILITY GUIDELINES INSTITUTE (FGI)
* 2004 INTERNATIONAL BUILDING CODE (IBC)
* 2024 NFPA 13
* 2024 NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION
* 2024 NFPA 99 HEALTHCARE FACILITIES CODE
* 2024 NFPA 1 FIRE CODE & ALL REFERENCE CODE THEREIN
APPLICABLE CODES: *2024 NFPA 101 LIFE SAFETY CODE
SITE AREA: MULTI BUILDING SITE
ST. CLOUD, MN
SITE ADDRESS: 4801 VETERANS DRIVE
St. Cloud VA Healthcare System - Repair Building 50 Basement Kitchen
PROJECT NO: 221958
CODE REVIEW
CARBON MONOXIDE DETECTORS NO NO NFPA 101
20.3.4.5.2
ATTIC FLR 2 FEC EXISTING NFPA 10 6.2.1.1
2ND FLR 2 FEC EXISTING NFPA 10 6.2.1.1
1ST FLR 2 FEC EXISTING NFPA 10 6.2.1.1
BASEMETN 2 FEC 2 PROVIDED NFPA 10 6.2.1.1
NUMBER OF FEC REQUIRED PER FLR
MAX TRAVEL DISTANCE TO FEC 75 FEET >75 FEET NFPA 10 6.2.1.1
MAXIMUM FLOOR AREA FOR
EXTINGUISHER
11,250 SQ FT >11,250 SQ FT NFPA 10 6.2.1.1
MAXIMUM FLOOR AREA PER UNIT OF
CLASS A
3,000 SQ FT >3,000 SQ FT NFPA 10 6.2.1.1
MINIMUM RATED SINGLE EXITNGUISHER EXT TYPE = 2A 2A NFPA 10 6.2.1.1
FIRE EXTINGUISHER REQUIREMENTS
FIRE DEPARTMENT ACCESS WITHIN 300 FT OF ALL PORTIONS OF THE FIRST
FLOOR OF THE BUILDING
EXISTING NFPA 1
CH18.2.3.2.2.1
AUTOMATIC SPRINKLER SYSTEM NFPA 13 NFPA 13 - FULLY AUTOMATIC, SUPERVISED
SYSTEM
NFPA 13 CH4
FIRE PROTECTION SYSTEMS REVIEW INTERNATIONAL FIRE CODE (IFC) NFPA
FLOOR FINISH CLASS I OR CLASS II CLASS 1 NFPA 101 CH10.2.7
FLOORS
OTHERS CLASS A, B, OR C CLASS A NFPA 101...
EXITS & EXIT ACCESS CORRIDORS CLASS A OR B CLASS A NFPA 101...
WALLS & CEILINGS
INTERIOR FINISHES NFPA
FIRE WALL 706.1 MOST RESTRICTIVE OCCUPANCY SHALL
GOVERN IF FIRE WALLS ARE REQUIRED
EXISTING NFPA 101
CH6.1.14.4
MAXIMUM AREA OF EXTERIOR WALL
OPENINGS
UNLIMITED (EXCEEDS 30'-0" AND IS FULLY
SPRINKLED BUILDING)
EXISTING NFPA 80 CH4.4.4
FIRE WALLS REQUIRED (Y/N) - NO
BUILDINGS ON THE SAME LOT (Y/N) - YES
30 FEET OR GREATER 20 FEET N/A
GREATER THAN 3 FEET TO LESS THAN
30 FEET
24 INCHES PLUS 8 INCHES FOR EVERY FOOT OF
FSD BEYOND 3 FEET OR FRACTION THEREOF
N/A
GREATER THAN 2 FEET TO 3 FEET 24 INCHES N/A
O FEET TO 2 FEET PROJECTIONS NOT PERMITTED N/A
EXTERIOR PROJECTIONS N/A NFPA 101 CH9.7
SYSTEM IN PLACE FULLY AUTOMATIC SPRINKLER SYSTEM INSTALLED
FIRE & SMOKE PROTECTION NFPA
JOINING DOORS 45 MIN NFPA CH19
UNIT DOORS 20 MIN NFPA CH19
RATED WALL OPENINGS AT CORRIDORS
SHAFT WALL 2 EXISTING NFPA 101 CH8.6
ELEVATOR 2
EXISTING NFPA 101 CH8.6
STAIRS 2
EXISTING NFPA 101 CH8.6
CORRIDOR RATING .5
EXISTING NFPA 220 TBL 4.1.1
ROOF CONSTRUCTION 2
EXISTING NFPA 220 TBL 4.1.1
NFPA 220 TBL 4.1.1
FLOOR CONSTRUCTION 2
EXISTING NFPA 220 TBL 4.1.1
NON BEARING WALLS AND PARTITIONS -
INTERIOR
SEE LIFE SAFETY PLANS NFPA 220 TBL 4.1.1
NONBEARING WALLS AND PARTITIONS -
EXTERIOR
SEE LIFE SAFETY PLANS NFPA 220 TBL 4.1.1
INTERIOR 2
EXISTING NFPA 220 TBL 4.1.1
EXTERIOR 2
EXISTING NFPA 220 TBL 4.1.1
BEARING WALLS 2
EXISTING NFPA 220 TBL 4.1.1
PRIMARY STRUCTURE 2
EXISTING NFPA 220 TBL 4.1.1
CONSTRUCTION TYPE: NFPA
CODE / AHJ REQUIREMENTS ACTUAL PROVIDED
NFPA CODE
REFERENCE
ROOF ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... EXISTING N/A
CEILING ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... SEE CEILING LEGENDS AND ARCH SECTION... N/A
FLOOR ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... EXISTING N/A
WALL ASSEMBLIES SEE CHAPTER 6 FOR RATED ASSEMBLY... SEE WALL TYPE LEGENDS AND ARCH SECTIO... N/A
UL-RATED SYSTEMS AND DESIGN
NUMBER NFPA
SOUND TRANSMISSION STC RATING OF AL LEAST 50 BETWEEN ADJACENT
DWELLING UNITS AND 35 BETWEEN DWELLING
UNITS AND ADJACENT PUBLIC SPACES.
N/A
LABELING FIRE WALLS LABEL ALL FIRE WALLS ABOVE ALL CEILINGS. NFPA 101 CH8.2.2.5
MISCELLANEOUS INFORMATION NFPA
SPECIALTY REQUIREMENTS NONE EXISTING
REQUIRED? YES EXISTING
ELEVATORS & CONVEYING SYSTEMS NFPA
SERVICE SINK 1 SEE PLUMBING PLANS N/AA
DRINKING FOUNTAINS 0 EXISTING N/A
LAVATORIES - FEMALE 1 PER UNIT EXISTING N/A
LAVATORIES - MALE 1 PER UNIT EXISTING N/A
WATER CLOSETS - FEMALE 1 PER UNIT EXISTING N/A
WATER CLOSETS - MALE 1 PER UNIT EXISTING N/A
OCCUPANCY #
MINIMUM NUMBER OF REQUIRED
PLUMBING FIXTURES
REQUIRED TYPE OF FIXTURES PROVIDED TYPE OF FIXTURE N/A
PLUMBING SYSTEMS NFPA
SPECIAL OCCUPANCIES I-2 HOSPITALS: 10% MINIMUM (VA: 100%) N/A ABAAS (VA BARRIER)
ACCESSIBLE DWELLING UNITS & SLEEPING
UNITS
N/A N/A ABAAS (VA BARRIER)
ACCESSIBLE ROUTES FOR DWELLINGS N/A N/A ABAAS (VA BARRIER)
ACCESSIBLE PARKING SPACES N/A N/A ABAAS (VA BARRIER)
ACCESSIBLE ENTRANCES I-2 HOSPITALS; 50% (VA: 100%) EXISTING ABAAS (VA BARRIER)
ACCESSIBLE ROUTE AT LEAST ONE ACCESSIBLE ROUTE. EXISTING ABAAS (VA BARRIER)
REQUIREMENTS APPLICABLE EXCEPTIONS? NONE ABAAS (VA BARRIER)
ACCESSIBILITY 68 UNITS NFPA
DEAD END CORRIDOR LENGTH 20'-0" SEE LIFE SAFETY PLAN NFPA 101...
MAX COMMON PATH OF TRAVEL 100'-0" SEE LIFE SAFETY PLAN NFPA 101...
ALLOWABLE EXIT ACCESS TRAVEL
DISTANCE
200'-0"HEALTHCARE = (PATIENT ROOM TO EXIT
DOOR = 50')
95' SEE LIFE SAFETY PLAN NFPA 101
CH19.2.6.2
AREA OF REFUGE REQUIRED NO FULLY SPRINKLED BUILDING NFPA 101...
MEANS OF EGRESS ILLUMINATION
REQUIRED?
YES EXISTING NFPA 101 CH7.8
MINIMUM NUMBER OF EXITS OR ACCESS
TO EXITS PER STORY
2 EXISTING NFPA 101 CH19.2.4
SPECIAL EXCEPTIONS NONE N/A NFPA 101 CH7
NUMBER OF EXITS & EXIT ACCESS
DOORWAYS REQUIRED
2 (IN AREAS WITH MORE THAN 50 OCC.) EXISTING NFPA 101 CH7
MINIMUM CORRIDOR WIDTH 44" EXISTING NFPA 101 CH7
DOOR SWINGS ≥ 50 OCCUPANT = SWING IN DIRECTION OF
TRAVEL
DOORS (multiply by 0.2 inches/occupant) SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.1
STAIRWAYS (multiply by 0.3 inches/occupant - sprinkled throughout)
SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.1
MEANS OF EGRESS SIZING
HEALTHCARE 50 GROSS SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.2
HEALTHCARE 240 GROSS SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.2
LIST TYPE LIST FACTOR TOTAL OCCUPANTS NFPA 101 CH7.3.1.2
OCCUPANCY LOAD - FUNCTION OF SPACE
(LIST BELOW)
OCCUPANT LOAD FACTOR
MEANS OF EGRESS NFPA
CODE / AHJ REQUIREMENTS ACTUAL PROVIDED NFPA
Figure 302.2 Carpet Pile Height
Figure 303.2 Vertical Change in Level
1/ 2" m ax
1/ 4" m ax
Figure 302.3 Elongated Openings in Floor or
Ground Surfaces d ir ec ti o n o f tr av el lo n g d im d o m in an t p er p in d ic u la r to
1/2" max dominant direction of travel
Figure 303.3 Beveled Change in Level
1/
1/
1/
1/
Figure 304.3.1.2 Circular Turning Space - Existing
Buildings Size and Overlap
Figure 304.3.1.1 Circular Turning Space - New Buildings Size and Overlap m ax
Overlap of knee and toe clearance Overlap of knee and toe clearance
6.
2.
m ax
P er ø 5'-7" min ø 5'-0" min
Figure 304.3.2.2 T-Shaped Turning Space New Buildings - Size and Overlap ar m ar m base
Figure 304.3.2.1(A) T-Shaped Turning Space New Buildings - Option 1 ar m ar m base
68" min min
16" min
36" min
16" m in m in36 m in
Figure 304.3.2.1(B) T-Shaped Turning Space New Buildings - Option 2 ar m ar m base
64" min min
11" min
42" min
11" m in m in m in
Figure 304.3.2.1(C) T-Shaped Turning Space New Buildings - Option 3 ar m ar m base
64" min min
12" min
40" min
12" m in m in m in
60" min min
12" min
36" min
12" m in36 m in m in
Figure 305.3.2 Clear Floor or Ground
Space- Existing Buildings
Figure 305.5 Position of Clear Floor or Ground Space
Figure 305.7.1 Maneuvering Clearance in an
Alcove, Forward Approach
Figure 305.7.2 Maneuvering Clearance in an
Alcove, Parallel Approach
(a) forward
(b) parallel
Figure 305.3.1 Clear Floor or Ground Space- New Buildings
52" min m in
48" min m in
30" min m in
48" min m in
36" min
X
4"
60" min
X
5"
Figure 306.2 Toe Clearance
Figure 306.3 Knee Clearance
(b) plan
(a) elevation
9"
6" max m in
17"- 25"
(b) plan
(a) elevation m in
25" max
11" min
8" min m in
Figure 307.2 Limits of Protruding Objects
4" max
X
7"
X
0"
Figure 307.3 Post-Mounted Protruding Objects
(b)(a)
0"
12" max 12" max m ax X > 12"
X > 12" m in
Figure 307.4 Vertical Clearance
M ax
X
Figure 308.3.1 Unobstructed Side Reach
Figure 308.3.2 Unobstructed High Side Reach
Figure 308.2.2 Obstructed High Forward Reach
Figure 308.2.1 Unobstructed
Forward Reach
(a) (b)
(b)(a) m in m ax m ax
20" max m ax
20"- 25" max
10" max m in m ax
10" max 10" - 24" max m ax m ax m ax m ax
B U
IL
D
IN
G
B L
O C
K S
1. ALL CONSTRUCTION & RENOVATION SHALL MEET THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARD (ABAAS).
2. SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF
THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE VA BARRIER FREE
DESIGN STANDARD: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT
ACCESSIBILITY STANDARDS (PG-18-13).
GENERAL NOTES
OVERRIDE BY VA BARRIER FREE
DESIGN STANDARD
MINIMUM REQUIREMENTS
• SITES - PARKING SPACES ACCESSIBLE 1% GREATER THAN ABAAS
• SPINAL CORD INJURY/DISORDER (SCI/D) FACILITIES: 0.2 ACCESSIBLE SPACES PER
INPATIENT BED; 0.5 PER LONG-TERM CARE BED; 5.6 PER OUTPATIENT EXAM ROOM.
DEDICATED FOR SCI/D PATIENTS
• HOSPITAL OUTPATIENT FACILITIES 10% OF TOTAL SPACES
• REHABILITATION AND OUTPATIENT
PHYSICAL THERAPY FACILITIES 20% OF TOTAL SPACES
• BUILDING-ACCESSIBLE SEATING, ASSEMBLY AREAS 1% GREATER THAN ABAAS
ACCESSIBLE ROUTE
• WIDTH, MIN. PATIENT CARE AREAS 6'-0"
• WIDTH, MIN. ADMINISTRATIVE AREA 5'-0"
• SLOPE, MAXIMUM (INCLUDING PARKING SPACES) 1:50 (2%)
• MINIMUM GRADIENT OF WALK REQUIRING REST
AREAS EVERY 200' 1:50 (2%)
• TURNING RADIUS 5'-6"
• TURNING RADIUS, BARIATRIC 6'-0"
• T-SHAPED TURNING SPACE 5'-6" x 5'-6"
• T-SHAPED TURNING SPACE, BARIATRIC 6'-0" x 6'-0"
FLOOR SURFACES
• CHANGES IN LEVEL NOT PERMITTED ON SCI FLOORS
• CARPET CUSHION OR PADDING NOT PERMITTED
PARKING & PASSENGER LOADING ZONES
• ACCESS AISLE REQUIREMENT FOR ACCESSIBLE
PARKING SPACES 5'-0" EACH SIDE
• PASSENGER LOADING AREA
"COMMUNICATION SYSTEM" FOR ASSISTANCE AT SCI UNITS YES
CURB RAMPS
• WIDTH, MINIMUM 4'-0"
RAMPS
• MAXIMUM SLOPE 1:20
• MAXIMUM LENGTH, WITHIN RANGE OF 1:33 - 1:26 40'
• MAXIMUM LENGTH, WITHIN RANGE OF 1:25 - 1:20 35'
• MINIMUM CLEAR WIDTH 4'-0"
• MINIMUM SIZE LEVEL LANDING,
WHERE DOORS SWING INTO LANDING 6'-0" X 6'-0"
STAIRS
• HANDRAIL HEIGHT 34"
ELEVATOR (PASSENGER)
• MINIMUM WIDTH OF ELEVATOR DOORS 4'-0"
• MINIMUM CAR SIZE 8'-0" X 6'-2" PLATFORM SIZE
• DOUBLE SET OF HANDRAILS YES
WINDOWS
• SILL HEIGHT IN PATIENT BEDROOMS 24" MAXIMUM
DOORS & DOORWAYS
• PATIENT CARE DELIVERY AREAS WITH PATIENT BED,
STRETCHER OR GURNEY ACCESS, MINIMUM WIDTH 4'-0"
WATER CLOSETS - INPATIENT NURSING UNITS
• GRAB BAR CONFIGURATION: DOUBLE SWING-UP BARS FOR ALL PATIENT TOILETS/SHOWER
ROOMS ON NURSING UNITS.
TOILET STALLS
• MINIMUM ACCESSIBLE STALL SIZE 5'-6" X 6'-0"
• MINIMUM SIZE WHEELCHAIR "FRONT-TRANSFER" STALL 3'-6" X 6'-0"
• GRAB BARS REQUIRED IN ALL STALLS
SHOWER STALLS (PATIENT)
• MINIMUM STALL DIMENSIONS 4'-0" X 4'-0"
• GRAB BARS HORIZONTAL PLUS VERTICAL BARS
TOILET ROOMS
• INPATIENT BEDROOM TOILET ROOMS,
MINIMUM WIDTH OF TOILET ROOM ENTRANCE DOORS 48"
CAFETERIAS
• KNEE CLEARANCE, FOR MINIMUM 5% TABLES 2'-3" & 2'-5" FOR AT LEAST 5%
• CUTLERY AND SUPPLY HEIGHT 40" - 48"
HEALTH CARE FACILITIES
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF PATIENT BEDROOMS ACCESSIBLE 100%
• MEDICAL/SURGICAL NURSING UNITS,
PERCENT OF TOILET ROOMS ACCESSIBLE 100%
Figure 703.6.1 Pictogram Field
MEN not in pictogram field
6" M in
Figure 705.1 Size and Spacing of Truncated Domes base diameter of 0.9"-1.4" top diameter of 50%-65% of the base diameter
(a) elevation (enlarged)
(b) plan
.6 5"
M in
1.6" - 2.4"
1.
6"
.4
Figure 707.6.2 Numeric Key Layout
(a) 12-key ascending
(b) 12-key descending
1 2 3
4 5 6
7 8 9
* 0 #
7 8 9
4 5 6
1 2 3
* 0 #
Figure 703.2.5 Height of Raised
Characters
LIBRARY
5/ 8"
"0.
2"
Figure 703.3.1 Braille Measurement single braille cell blank cell space between words raised dot no raised dot
Figure 703.3.2 Position of Braille
AREA OF
REFUGE
3/ 8" m in
3/ 8" m in
Figure 703.7.2.1 International Symbol of Accessibility
Figure 703.7.2.2 International TTY Symbol
Figure 703.7.2.3 Volume-Controlled Telephone
Figure 703.7.2.4 International Symbol of Access for
Hearing Loss
Figure 704.2.1.1 Parallel Approach to
Telephone
Figure 704.2.1.2 Forward Approach to
Telephone
Figure 703.4.1 Height of Tactile Characters
Above Floor or Ground
Figure 703.4.2 Location of Tactile Signs at Doors
AREA OF
REFUGE
centered on tactile characters
AREA OF
REFUGE
.00
M ax
M ax
M in
M ax
18" Min
M in distance between corresponding dots from one cell directly below distance between dots in the same cell distance between corresponding dots in adjacent cells distance between dots in the same cell base diameter
C O
M M
U N
IC
A
T
IO
N E
L E
M E
N T
S A
N D
F E
A T
U R
E S
Figure 404.2.4.3 Maneuvering Clearance at Recessed Doors and Gates
Figure 404.2.4.2 Maneuvering Clearance at Sliding and Folding Doors
Figure 404.2.4.1 Maneuvering Clearance at Manual Swinging Doors and Gates
Figure 404.2.3 Clear Width of Doorways
Figure 404.2.6 Doors in Series and Gates in Series
(e) hinge approach, pull side
(j) latch approach, push side
(k) latch approach, push side
*48 min if door provided with closer
(i) latch approach, pull side
*54 min if door provided with closer
(h) latch approach, pull side
(f) hinge approach, push side
(g) hinge approach, push side
*if door provided with both closer and latch ** 48 min if both closer and latch provided
(b) front approach, push side
(c) front approach, push side
*if door provided with both closer and latch
(a) front approach, pull side
(a) hinged door
(b) sliding door
(c) folding door
(d) doorways without doors
(a) pull side
(b) push side
(c) push side, door provided with both closer and latch
(a) front approach
(b) side approach
*48 min at front approach
(c) pocket or hinge approach
(d) stop or latch approach
(d) hinge approach, pull side
(a)
(c)
(b)
(d) front approach symbol
90.
32" min
32" min
32" min
36" min
18" min m in m in
*12" min
36" min 60 m in
42" min m in
2" m in
22" min* 12" min m in
24" min
24" min m in m in m in
22" min m in m in
24" min m in
18" min
X >8
X >8 m in m in
12" min
X >8
48" min
48" min
48" min m in
66" min D O
O R
S A
N D
G A
T E
S
Sanitary Napkin Disposal
Sanitary Napkin Dispenser m ax
Soap Dispenser
Paper Towel Dispenser
T .O
. d is p en se r
O P
G m ax
Baby Changing Station to B
.O m in to h ig h es t p ar t m ax
LINE OF WALL
Coat/Robe Hook
4' -0
A
C C
5' -4
T
Y P
Door Viewer
3' -7
A
C C
5' -0
T
Y P
Mirror Height to g la ss
Fire Extinguisher Cabinet m ax t o t h e h an d le m ax
Fire Extinguisher m ax t o t h e h an d le m ax
Hand Dryer
Trash Receptacle m ax w o rk s u rf ac e o f w o rk s u rf ac e
T .O
. o p er ab le p o rt io n m ax
Toilet Seat Cover Dispenser
M O
U N
T
IN
G H
E
IG
H T
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT OF RECORD
A/E:
STAMP
CONSULTANTS
321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
100% CONSTRUCTION DOCUMENTS
REPAIR BUILDING 50 BASEMENT KITCHEN
SAINT CLOUD, MN
VA# 656-20-130
STONE GROUP ARCHITECTS
600 E 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
DUNHAM
50 SOUTH SIXTH STREET
SUITE 1100
MINNEAPOLIS, MN 55402
612-465-7550
P.O.C.: JASON GOTWALTT (M)
BEN ZURN (E)
MECHANICAL, ELECTRICAL, PLUMBING:
Phase
Drawing Title
DATE:
APPROVED: SERVICE LINE DIRECTOR DATE:
APPROVED: GEMS COORDINATOR DATE:
APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:
APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECT COR
APPROVED: SAFETY MANAGER
DATE:
C U s e rs
\d .t o u g a s \D o c u m e n ts \2
V
A S t C lo u d
R e p a ir B
B a s e m e n t K it c h e n d a rr in tJ
Y L
.r v t
/3
/2
:5
:2
P
M
GI011
ACCESSIBILITY DETAILS
P.O.C.: JESSE KLANKOWSKI
JK DT09-30-2025Revision# Description Date:
A. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION
B. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION
AREA. CONSTRUCTION AREA PERIMITER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITED BY CLASS. ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND
LISTED IN ICRA CLASS.
C. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
D. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF
CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR EACH PREMIT.
E. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO DECK/FLOOR ABOVE.
F. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR.
G. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE
IN AREAS LESS THAT 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN
5000 SF AND 10000 SF.
H. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
I. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR
VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE
EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
J. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.
K. ANY DUST PARTITIONS OR ICRA - CONSTRUCTION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF
DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF CONSTRUCTION.
L. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO THE VA OCCUPIED AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS, INCULDING THE APPLICABLE MECHANICAL AND ELECTRICAL
SYSTEMS SERVING THESE AREAS.
M. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND DEMOLITION PLANS.
N. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENT IS FOR ARCHITECT-OWNER PLANNING PURPOSES
ONLY.
O. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS THROUGHOUT ALL PHASING.
GENERAL INFECTOIN CONTROL & CONSTRUCTION BARRIER NOTES:
NOTE:
• PROVIDE 1 HOUR FIRE RATED, STARC SYSTEMS FIREBLOCK WALL
PANELS OR APPROVED EQUAL FOR ALL ICRA/CONSTRUCTION
BARRIERS AND MODIFY SPRINKLER HEADS TO BE UPTURNED AND
EXTENDED TO 18" OF STRUCTURE.
• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN
AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /
CONSTRUCTION BARRIER LOCATIONS. SEE MECHANICAL & ELECTRICAL
DRAWINGS FOR ADDITIONAL AREAS OF WORK.
ICRA / CONSTRUCTION BARRIER
LOCATION
CATEGORY
A
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO
EXCEED 1 AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE
DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT, ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF
BULBS, RECEPTACLES, OR SWITCHES.
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETE.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL DUST AND
DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING) THAT PRODUCES MINIMAL DUST AND DEBRIS).
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING SNAKING OF
DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL
DUST AND DEBRIS
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT, OR A SINGLE DEVICE THAT PRODUCES
MINIMAL DUST AND DEBRIS
SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETE.
• DEMOLITION OF REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 SQ. FT. OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND
BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS, AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW
DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
• WORK EXCEEDING 6 MONTHS IN DURATION.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC
• THE INSTALLATION OF BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL, AND ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS
INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE
INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS, AND CONTROLS.
CATEGORY
B
CATEGORY
C
CATEGORY
D
TABLE 1 - CONSTRUCTION, RENOVATION AND/OR MAINTENANCE ACITIVITY CATEGORY
LOW RISK MEDIUM
RISK
HIGH RISK
HIGHEST
RISK
NON-PATIENT CARE AREAS SUCH AS:
• PUBLIC HALLWAYS AND GATHERING AREAS NOT IN CLINICAL AREAS
• OFFICE AREAS NOT IN CLINICAL AREAS
• BREAKROOMS NOT IN CLINICAL AREAS
• BATHROOMS OR LOCKER ROOMS NOT IN CLINICAL AREAS
• MECHANICAL/ELECTRICAL ROOMS NOT IN CLINICAL AREAS
PATIENT CARE SUPPORT AREAS SUCH AS:
• WAITING AREAS
• CLINICAL ENGINEERING (BIOMEDICAL)
• MATERIALS MANAGEMENT
• STERILE PROCESSING DEPARTMENT (DIRTY SIDE)
• KITCHEN, CAFETERIA, GIFT SHOP, COFFEE SHOP, AND FOOD
KIOSKS
PATIENT CARE AREAS SUCH AS:
• PATIENT CARE ROOMS AND AREAS, INCLUDING SPINAL CORD INJURY UNITS
• ALL ACUTE CARE UNITS, INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND CLINICS
• EMERGENCY DEPARTMENT
• COMMUNITY LIVING CENTERS, DOMICILIARIES, AND TRANSITIONAL
RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY - GENERAL WORK ZONE
• MEDICATION ROOMS AND CLEAN UTILITY ROOMS
• IMAGING SUITES - DIAGNOSTIC IMAGING
• LABORATORY
PROCEDURAL, INVASIVE STERILE SUPPORT AND HIGHLY COMPROMISED PATIENT
CARE AREAS SUCH AS:
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND CHEMOTHERAPY/ INFUSION CENTER
• OR THEATERS AND RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS
• PHARMACY COMPOUNDING AREA
• STERILE PROCESSING DEPARTMENT - CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES - INTERVENTIONAL IMAGING
• DEDICATED ISOLATION WARDS/UNITS FOR INFECTIOUS DISEASES
TABLE 3 - PATIENT RISK CATEGORIES
TABLE 4 - LEVEL OF INFECTION PREVENTION AND CONTROL PRECAUTIONS
PATIENT RISK CATEGORY
LOW RISK
ACTIVITY CATEGORY
A B C D
I II II III
MEDIUM RISK I II III IV
HIGH RISK I II IV IV
HIGHEST RISK II III IV IV
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) - CONT.
LEVEL
I
LEVEL
II
LEVEL
III
LEVEL
IV
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE MATERIAL.
SAME AS CLASS I PLUS:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST
CONTAINMENT CART OR SOME OTHER SYSTEM)
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS
DIFFUSER ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED
FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION
6. CONTAIN TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH HARD LID)MUST BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT THE ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN
VISIBLY SOILED.
10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OF HEPA VACUUMING SURFACES AT LEAST DAILY
SAME AS CLASS I AND II PLUS:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED
TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURED FROM MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING APPROVED MATERIALS (UL SCHEDULED FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES/WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK
SPECIFIED WAIVER IS APPROVED BY VHA'S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OF GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MOTORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE"BALL IN THE WALL" OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.
SAME AS CLASS I, II, AND III PLUS:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS' PPE
AND CLEANING
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
TABLE 5 - REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS
TABLE 6 (4)
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS
I - II
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN
REMOVING HARD BARRIERS:
i. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
ii. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.
iii. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
iv. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.
v. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER
COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ARCHITECT OF RECORD
A/E:
STAMP
CONSULTANTS
321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
100% CONSTRUCTION DOCUMENTS
REPAIR BUILDING 50 BASEMENT KITCHEN
SAINT CLOUD, MN
VA# 656-20-130
STONE GROUP ARCHITECTS
600 E 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
DUNHAM
50 SOUTH SIXTH STREET
SUITE 1100
MINNEAPOLIS, MN 55402
612-465-7550
P.O.C.: JASON GOTWALTT (M)
BEN ZURN (E)
MECHANICAL, ELECTRICAL, PLUMBING:
Phase
Drawing Title
DATE:
APPROVED: SERVICE LINE DIRECTOR DATE:
APPROVED: GEMS COORDINATOR DATE:
APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:
APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:
APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:
APPROVED: PROJECT COR
APPROVED: SAFETY MANAGER
DATE:
C U s e rs
\d .t o u g a s \D o c u m e n ts \2
V
A S t C lo u d
R e p a ir B
B a s e m e n t K it c h e n d a rr in tJ
Y L
.r v t
/3
/2
:5
:2
P
M
GI021
ICRA
P.O.C.: JESSE KLANKOWSKI
JK DT09-30-2025Revision# Description Date:
DN
CODE PLAN LEGEND
0.0"
0.0"
OCCUPANTS
REQUIRED WIDTH
PROVIDED WIDTH
OCCUPANT LOAD
TD = X'-X"
PATH OF TRAVEL FOR EGRESS
TRAVEL DISTANCE (TD)
TD = X'-X"
PATH OF TRAVEL TO FIRE EXTINGUISHER
TRAVEL DISTANCE (TD)
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SMOKE SEALS ON ALL RATED DOORS.
C. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
GENERAL CODE PLAN NOTES:
1417 SF
KITCHEN
TRAY
SERVICE
54 SF
7C
OFFICE
198 SF
STAIR
120 SF
BATH
29 SF
PIPE CHASE 70 SF
7B
STORAGE
56 SF
7A
HAC
130 SF
4C
LACTATE
ROOM
302 SF
4A
FAMILY
MEDITATION
195 SF
C0SE
CORRIDOR
199 SF
2A
STORAGE
81 SF
LINEN
CHUTE
95 SF
2B
STORAGE
152 SF
EQUIP
STORAGE
565 SF
MALE
LOCKERS
818 SF
C0C
CORRIDOR
74 SF
E02
ELEVATOR
43 SF
23B
PHONE
73 SF
E01
ELEVATOR
127 SF
ELEVATOR
EQUIP.
152 SF
23A
ELECT
200 SF
RECREATION
OFFICE
1165 SF
KITCHEN
DISHWASHING
27 SF
10A
HAC
230 SF
10B
CART
STAGING
187 SF
EMPLOYEE
LOUNGE
49 SF
11B
BATH
46 SF
11A
BATH
285 SF
MECH
174 SF
4D
MECH
174 SF
4E
HAC
3.2"
40.0"
3.4"
40.0"
LEN
G
TH
O
F TR
AVEL: 99'-0"
LE
N
G T
H O
F T
R A
V E
L: 47'-6"
10.42
10.42
LE
N G
TH
O
F
TR
A V
E L:
8'
-1 0"
LENGTH OF TRAVEL: 39'-0"
LENGTH O
F TRAVEL: 3
3'-1 1"
LEN
G
TH O
F TRAVEL: 29'-9"
7 7
LEGEND
BUILDING & LIFE SAFETY REQUIREMENTS
DESCRIPTION
WALL
RATING
NEW
PARTITION KEY
NFPA 101-2021
OPENINGS DAMPERS
RATING RFRNC. TYPE RFRNC.
BUILDING SEPARATION:
FIRE BARRIER
90 MIN
OCCUPANCY/AREA SEPARATION
FIRE BARRIER
2 HR
90 MIN
HORIZONTAL EXIT (& REFUGE AREA)
FIRE BARRIER
90 MIN
VERT. OPG. (EXIT ENCLSR/SHAFT)
FIRE BARRIER
(2 HR = 4 OR MORE STORIES)
(1 HR = LESS THAN 4 STORIES)1 HR
2 HR
60 MIN
90 MIN
HAZ./INCIDENTAL USE
FIRE BARRIER
45 MIN
HAZ./INCIDENTAL USE
SMOKE PARTITIONS
(SPRINKLERED)
NR-
RESIST
SMK
NR
SELF OR AUTO
CLOSING
SUBDIVIDING SPACES
SMOKE BARRIER (I-2 OCCUPANCY)
20 MIN
SUITE SEPARATION
SMOKE PARTITION
NR
*NR
SELF OR AUTO
CLOSING
EXIT ACCESS CORRIDORS (I-2)
SMOKE PARTITIONS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .