These architectural construction documents detail a renovation project for Building 50's basement kitchen at the Saint Cloud VA Medical Center in Minnesota. The project involves a comprehensive repair and upgrade of the basement kitchen area, encompassing approximately 1,417 square feet across multiple rooms including a kitchen tray service area, HAC spaces, cart staging, and a cart wash area. The documents are 100% construction documents dated September 29, 2025, prepared by Stone Group Architects and include detailed plans for demolition, floor layouts, ceiling plans, interior elevations, wall sections, and finish specifications.

Key technical aspects include installing new ceramic wall tiles, quarry tile flooring, wall protection systems, and updating mechanical, electrical, and plumbing infrastructure. The project requires strict adherence to VA infection control protocols, with specific requirements for construction barriers, negative air pressure monitoring, and dust containment. The renovation involves removing existing equipment, reconfiguring spaces, installing new doors and windows, and implementing accessibility features consistent with VA barrier-free design standards. The project is part of VA solicitation 36C26326B0009_1 under Veterans Health Administration Veterans Integrated Service Network 23, with the work focused on modernizing and improving the facility's kitchen and support spaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS & ANNOTATION LEGEND:

TYPICAL DIMENSION LINE

BREAK LINE

DETAIL INDICATORXX

X-XXX

DETAIL INDICATORXX

X-XXX

XX WALL SECTION INDICATOR

X

X-XXX XX X-XXX EXTERIOR ELEVATION INDICATOR

ELEVATION / LEVEL INDICATOR

CENTER LINE

INTERIOR ELEVATION INDICATORX-XXX

XX

X-XXX

XX

XX

XX

XX

NORTH ARROW(S)

CG

CORNER GUARD

FEC FIRE EXTINGUISHER CABINET

X.X KEYNOTE

X NEW GRID LINE

XXX

ROOM

XXX FINISH INDICATOR

XXX

XX

DRAWING TITLE

X"=X'-X"

XX

TRUE

NORTH

PLAN

NORTH

XX

X-XXX

BUILDING SECTION INDICATOR

XX

X-XXX

DETAIL INDICATOR

X-XXX

NORTH

EXISTING GRID LINEX

XX / XXX

SPOT ELEVATION INDICATOR

LEVEL TITLE

TYPICAL DRAWING BLOCK TITLE

DRAWING REFERENCE

X'-X"

ELEVATION / LEVEL INDICATOR

LEVEL TITLE

X'-X"

X' X"

D R

A W

IN

G

R E

F E

R E

N C

E S

P

D F

L

IN

K S

SPOT COORDINATE INDICATOR

X'-X"

CR

X'-X" / X'-X"

SLOPE INDICATOR

X

XX

XX

REVISION / ISSUE INDICATOR

CARD READER

ROOF TYPE INDICATOR

WINDOW / STOREFRONT TYPE INDICATOR

PARTITION TYPE

DOOR / OPENING INDICATOR

(BORROWED LIGHT INCLUDED)

ROOM INDICATOR

EQUIPMENT INDICATOR

TYPE X

X'-X" A.F.F.

CEILING TYPE INDICATOR

XXX

VICINITY MAP

PROJECT VICINITY

NORTHNORTH

BLDG 50

KEY PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT OF RECORD

A/E:

STAMP

CONSULTANTS

321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

100% CONSTRUCTION DOCUMENTS

REPAIR BUILDING 50 BASEMENT KITCHEN

SAINT CLOUD, MN

VA# 656-20-130

STONE GROUP ARCHITECTS

600 E 7TH STREET

SIOUX FALLS, SD 57103

605-271-1144

DUNHAM

50 SOUTH SIXTH STREET

SUITE 1100

MINNEAPOLIS, MN 55402

612-465-7550

P.O.C.: JASON GOTWALTT (M)

BEN ZURN (E)

MECHANICAL, ELECTRICAL, PLUMBING:

Phase

Drawing Title

DATE:

APPROVED: SERVICE LINE DIRECTOR DATE:

APPROVED: GEMS COORDINATOR DATE:

APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:

APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECT COR

APPROVED: SAFETY MANAGER

DATE:

C U s e rs

\d .t o u g a s \D o c u m e n ts \2

V

A S t C lo u d

R e p a ir B

B a s e m e n t K it c h e n d a rr in tJ

Y L

.r v t

/3

/2

:5

:1

P

M

GI000

COVER SHEET

P.O.C.: JESSE KLANKOWSKI

JK DT09-30-2025

ABBREVIATIONS

SYMBOLS

CENTERLINE

# POUND / NUMBER

& AND

< ANGLE

<< DOUBLE ANGLE

@ AT

d PENNEY

Ø ROUND OR DIAMETER

A

A/E ARCHITECT / ENGINEER

AB ANCHOR BOLT

ABBRV ABBREVIATION

ABV ABOVE

AC ASPHALTIC CONCRETE / AIR CONDITIONER

ACC ACCESSIBLE

ACM ALUMINUM COMPOSITE MATERIAL

ACOUS ACOUSTICAL

ACP ACOUSTICAL CEILING PANEL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADD ADDENDUM

ADH ADHESIVE

ADJ ADJUSTABLE / ADJACENT / ADJOINING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AL ALUMINUM

ALN ALIGN

ALT ALTERNATIVE / ALTERNATE

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPROX APPROXIMATE

APX APPROXIMATE

ARCH ARCHITECT / ARCHITECTURAL

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS

AWF ARCHITECTURAL WINDOW FILM

B

B&B BOARD AND BATTEN / BALLED AND BURLAPPED

BATT BLANKET INSULATION / FIBERGLASS INSULATION

BD BOARD / BARN DOOR

BEV BEVELED

BF BIFOLD

BFF BELOW FINISH FLOOR

BL BRICK LEDGE

BLDG BUILDING

BLKG BLOCK / BLOCKING

BM BEAM

BO BOTTOM OF

BOC BOTTOM OF CONCRETE

BOF BOTTOM OF FOOTING

BOT BOTTOM

BRG BEARING

BRK BRICK

BRKT BRACKET

BRNG BEARING

BSMT BASEMENT

BTWN BETWEEN

BUF BUILT UP FLOORING

BUR BUILT UP ROOFING

C

C CELSIUS

CA CONSTRUCTION ADMINISTRATION

CAB CABINET

CB CERAMIC BASE

ABBREVIATIONS

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS / COILING DOOR

CEM CEMENT

CF CUBIC FEET/ CUBIC FOOT

CG CORNER GUARD

CH CHANNEL

CHR CHAIR RAIL

CIPC CAST-IN-PLACE CONCRETE

CIV CIVIL

CJ CONSTRUCTION JOINT / CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR / CLEARANCE / CLEAR SPACE

CM CONSTRUCTION MANAGER

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

CO CHANGE ORDER / CLEANOUT

COL COLUMN

COMB COMBINATION / COMBINE / COMBINED

COMP COMPOSITE / COMPOSITION

CONC CONCRETE

CONN CONNECT / CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS / CONTINUE / CONTINUED

CONTR CONTRACT / CONTRACTOR

COORD COORDINATE / COORDINATION / COORDINATOR

CORR CORRUGATED / CORRIDOR

CPPT CARPET TILE

CPT CARPET

CR CRASH RAIL / CARD READER

CSMT CASEMENT

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER / CENTERED

CV CENTER VISION

D

D DEPTH / DEEP

DBL DOUBLE

DD DESIGN DEVELOPMENT / DUTCH DOOR

DEMO DEMOLITION / DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWR DRAWER

DWTR DUMBWAITER

E

(E) EXISTING

E EAST

EA EACH

EDT ELECTROSTATIC DISSIPATIVE TILE

EF EACH FACE

EG END GUARD

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ABBREVIATIONS

ELVR ELEVATOR

EMER EMERGENCY

ENGR ENGINEER / ENGINEERED

ENL ENLARGED

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER

MEMBRANE

EPS EXPANDED POLYSTYRENE BOARD

EPT EPOXY PAINT

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

EST ESTIMATE

ETC ETCETERA

ETR EXISTING TO REMAIN

EV ELECTRIC VEHICLE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXC EXCAVATE / EXCAVATION

EXH EXHAUST

EXP EXPANSION/EXPOSED

EXST EXISTING

EXT EXTERIOR

F

FA FIRE ALARM

FAB FABRICATE / FABRICATION / FABRICATED

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FFE FINISHED FLOOR ELEVATION

FG FULL GLASS

FIN FINISH / FINISHED

FLR FLOOR / FLOORING

FLUOR FLUORESCENT

FO FACE OF

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD / FACE OF STRUCTURE

FP FLUSH PANEL / FIRE PROTECTION / FLOOR PLAN

FR FIRE RESISTANT / FRAME

FRP FIBERGLASS REINFORCED PANEL

FRPOLY FIBERGLASS REINFORCED POLYMER

FS FLOOR SINK

FT FOOT / FEET / FIRE TREATED

FTG FOOTING

FURN FURNISH / FUNITURE

FUT FUTURE

G

G GALLON / GALLONS

GA GAGE / GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GI GALVANIZED IRON

GL GLASS

GLU GLUE

GSF GROSS SQUARE FOOTAGE / GROSS SQUARE FEET

GT GROUT

GWB GYPSUM WALL BOARD

GYP GYPSUM

ABBREVIATIONS

H

H HIGH / HEIGHT

HB HOSE BIB

HC HANDICAP / HOLLOW CORE / HAT CHANNEL

HD HEAVY DUTY

HDBD HARDBOARD

HDR HEADER

HDWR HARDWARE

HG HALF GLASS

HM HOLLOW METAL

HORZ HORIZONTAL

HR HOUR / HANDRAIL

HSK HOUSEKEEPING

HT HEIGHT

HVAC HEATING, VENTILATION, AIRCONDITIONING

HWC HYGIENIC WALL CLADDING

I

IB INTEGRAL BASE

IBC INTERNATIONAL BUILDING CODE

ICC INTERNATIONAL CODE COUNCIL

ID INSIDE DIAMETER / INSIDE DIMENSION / INTERIOR

DESIGN

IFC INTERNATIONAL FIRE CODE

IN INCH / INCHES

INCL INCLUDE /INCLUDED / INCLUDING

INFO INFORMATION

INSP INSPEC / INSPECTION / INSPECTOR

INSTR INSTRUCTION / INSTRUCTIONS

INSUL INSULATE/ INSULATED / INSULATION

INT INTERIOR

J

JAN JANITOR

JST JOIST

JT JOINT

K

KCJ KEYED CONSTRUCTION JOINT

KO KNOCK OUT

L

L LENGHT / LONG

LAB LABORATORY

LAM LAMINATE / LAMINATED

LAV LAVATORY

LB POUND

LF LINEAR FEET

LH LEFT HAND

LKR LOCKER

LOC LOCATION

LONG LONGITUDINAL

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MC MEDICINE CABINET

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURE / MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MNTG MOUNTING

ABBREVIATIONS

MO MASONRY OPENING

MR MIRROR

MT METAL TRIM

MTL METAL

N

(N) NEW

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NSF NET SQUARE FOOTAGE / NET SQUARE FEET

NTS NOT TO SCALE

NV NARROW VISION

O

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED; CONTRACTOR INSTALLED

OFOI OWNER FURNISHED; OWNER INSTALLED

OH OVERHEAD

OPG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN / ORDINANCE

ORIG ORIGINAL

OZ OUNCE

P

P PAINT

PAR PARALLEL

PCF POUNDS PER CUBIC FOOT

PD PRE-DESIGN / POCKET DOOR

PED PEDISTAL

PEM PRE-ENGINEERED METAL

PEMB PRE-ENIGNNERED METAL BUILDING

PERF PERFORATED

PERP PERPENDICULAR

PL PLATE

PLAM PLASTIC LAMINATE

PLMG PLUMBING

PLUMB PLUMBING

PLYWD PLYWOOD

PNL PANEL

PR PAIR / PROPOSAL REQUEST

PRCST PRECAST

PREFAB PREFABRICATE / PREFABRICATED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT / PRESSURE TREATED / PORCELAIN TILE

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PTR PAPER TOWEL RECEPTICAL

PVC POLYVINYL CHOLORIDE

Q

QT QUARRY TILE / QUART / QUARTS

R

R RADIUS / RISER

RB RESILIENT BASE

RBR RUBBER

RC RESILIENT CHANNEL

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REBAR REINFORCING BAR

REC RECESSED

REF REFERENCE / REFRIGERATOR

ABBREVIATIONS

REINF REINFORC (D), (ING), (MENT)

REQ REQUIRE

REQD REQUIRED

RES RESINOUS

RET RETURN / RETURNED

REV REVISION / REVISIONS / REVISED

RF RESILIENT FLOORING

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RI RIGID INSULATION

RL RIDGE LINE

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RVS REVERSE / REVERSE SIDE

RWC RIGID WALL COVERING

RWL RAIN WATER LEADER

S

S SOUTH

SAFB SOUND ATTENUATION FIRE BLANKETS

SB SPLASH BACK

SC SOLID CORE / SPECIALTY COATING

SCHED SCHEDULE

SCR SHOWER CURTAIN ROD

SD SOAP DISPENSER / SCHEMATIC DESIGN / SLIDING

DOOR

SDG SIDING

SECT SECTION

SF SQUARE FOOTAGE / SQUARE FEET

SG SAFETY GLASS

SHT SHEET

SHTHG SHEATHING

SIM SIMILAR

SLDG SLIDING

SLNT SEALANT

SND SANITARY NAPKIN DISPENSER

SNX SANIARY NAPKIN DISPOSAL

SOG SLAB ON GRADE

SPEC SPECIFICATION / SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SSM SOLID SURFACE MATERIAL

SST STAINLESS STEEL

ST STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURE / STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SW SHEARWALL

SYM SYMMETRICAL

T

T TREAD

T&B TOP AND BOTTOM

T&G TOUNGE AND GROOVE

TB TOWEL BAR

TBD TO BE DETERMINED

TEMP TEMPORARY / TEMPERED

TER TERRAZZO

TFE TOP FOOTING ELEVATION

THD THREA / THREADED / THREADS

THK THICKNESS

ABBREVIATIONS

THRU THROUGH

TKBD TACKBOARD

TL TILE

TO TOP OF

TOB TOP OF BEAM

TOC TOP O F CONCRETE / TOP OF CURB

TOD TOP OF DECK

TOF TOP OF FOOTING / TOP OF FOUNDATION

TOJ TOP OF JOIST

TOM TOP OF MASONRY

TOP TOP OF PIER

TOS TOP OF SLAB / TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPO THERMOPLASTIC POLYOLEFIN

TPTN TOILET PARTITION

TRANS TRANSVERSE / TRANSPARENT

TS TUBE STEEL / TRANSITION STRIP

TYP TYPICAL

U

UG UNDERGROUND

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UTIL UTILITY / UTILITIES

UTL UTILITY / UTILITIES

V

V SHEAR

VAR VARIES

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFY VERIFY

VIF VERIFY IN FIELD

VR VAPOR RETARDER

VWC VINYL WALL COVERING

W

(W) WIDE FLANGE

W WEST / WIDTH / WIDE / WIDE FLANGE

W/ WITH

W/O WITHOUT

WA WEDGE ACHOR

WB WOOD BASE

WC WATER CLOSET

WD WOOD / WOODWORK

WDW WINDOW

WF WIDE FLANGE

WG WALL GUARD

WH WATER HEATER

WI WROUGHT IRON

WL WIND LOAD

WP WATERPROOF / WATERPROOFING

WR WATER RESISTANT

WSCT WAINSCOT

WSF WELDED SHEET FLOORING

WT WEIGHT / WINDOW TREATMENT

WWF WELDED WIRE FABRIC

REPAIR BUILDING 50 BASEMENT

KITCHEN

100% CONSTRUCTION DOCUMENTS

09-30-2025

4801 VETERANS DRIVE, ST CLOUD, MN 56303

VA# 656-20-130

BUILDING 50

ST CLOUD VA HEALTHCARE SYSTEM

SHEET INDEX

01 - GENERAL

GI000 COVER SHEET

GI001 CODE REVIEW

GI011 ACCESSIBILITY DETAILS

GI021 ICRA

GI022 SITE / PHASING PLAN

GI101 BASEMENT LEVEL LIFE SAFETY PLAN

05 - ARCHITECTURAL DEMOLITION

AD101 BASEMENT LEVEL DEMOLITION PLAN

AD111 BASEMENT LEVEL DEMOLITION RCP

06 - ARCHITECTURAL

AE100 CRAWL SPACE FLOOR PLAN

AE101 BASEMENT LEVEL FLOOR PLAN

AE102 BASEMENT LEVEL FLOOR DRAINAGE PLAN

AE111 BASEMENT LEVEL REFLECTED CEILING PLAN

AE301 WALL SECTIONS & WALL TYPES

AE451 INTERIOR ELEVATIONS, DOOR SCHEDULE & DETAILS

AE501 ARCHITECTURAL DETAILS

AE801 BASEMENT LEVEL FINISH PLAN

07 - PLUMBING

M000 MECHANICAL TITLE SHEET

FD101 BASEMENT LEVEL - DEMOLITION FIRE PROTECTION PLAN

FP101 BASEMENT LEVEL - FIRE PROTECTION PLAN

PD001 CRAWL SPACE - DEMOLITION PLUMBING PLAN

PD101 BASEMENT LEVEL - DEMOLITION PLUMBING PLAN

P001 CRAWL SPACE PLUMBING PLAN

P101 BASEMENT LEVEL PLUMBING PLAN

P301 DOMESTIC WATER RISER DIAGRAM

P302 WASTE AND VENT RISER DIAGRAM

P400 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

08 - MECHANICAL

MHD101 BASEMENT LEVEL - DEMOLTION HVAC PLAN

MPD001 CRAWL SPACE - DEMOLITION PIPING PLAN

MPD101 BASEMENT LEVEL - DEMOLITION PIPING PLAN

MH101 BASEMENT LEVEL HVAC PLAN

MP001 CRAWL SPACE PIPING PLAN

MP101 BASEMENT LEVEL PIPING PLAN

M301 AIRFLOW DIAGRAMS

M400 MECHANICAL DETAILS

M401 MECHANICAL ELEVATION AND ISOMETRIC VIEWS

M402 KITCHEN EXHAUST HOOD DETAILS

M500 MECHANICAL SCHEDULES

M501 MECHANICAL ELECTRICAL MAU SCHEDULES

M600 SEQUENCE OF OPERATIONS

M601 SEQUENCE OF OPERATIONS

09 - ELECTRICAL

E000 ELECTRICAL TITLE SHEET

E100 BASEMENT ORIENTATION PLAN

ED101 BASEMENT LEVEL DEMOLITION PLAN

EL101 BASEMENT LEVEL LIGHTING PLAN

EP001 CRAWLSPACE POWER PLAN

EP101 BASEMENT LEVEL POWER PLAN

ES101 BASEMENT LEVEL SYSTEMS PLAN

FA101 BASEMENT LEVEL FIRE ALARM PLAN

FA500 FIRE ALARM DETAILS

E300 ELECTRICAL RISER

E500 ELECTRICAL DETAILS

E600 ELECTRICAL SCHEDULES

TOTAL SHEET COUNT: 53

Revision# Description Date:

1 100% CONSTRUCTION DOCUMENTS 09-29-2025

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT OF RECORD

A/E:

STAMP

CONSULTANTS

321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

100% CONSTRUCTION DOCUMENTS

REPAIR BUILDING 50 BASEMENT KITCHEN

SAINT CLOUD, MN

VA# 656-20-130

STONE GROUP ARCHITECTS

600 E 7TH STREET

SIOUX FALLS, SD 57103

605-271-1144

DUNHAM

50 SOUTH SIXTH STREET

SUITE 1100

MINNEAPOLIS, MN 55402

612-465-7550

P.O.C.: JASON GOTWALTT (M)

BEN ZURN (E)

MECHANICAL, ELECTRICAL, PLUMBING:

Phase

Drawing Title

DATE:

APPROVED: SERVICE LINE DIRECTOR DATE:

APPROVED: GEMS COORDINATOR DATE:

APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:

APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECT COR

APPROVED: SAFETY MANAGER

DATE:

C U s e rs

\d .t o u g a s \D o c u m e n ts \2

V

A S t C lo u d

R e p a ir B

B a s e m e n t K it c h e n d a rr in tJ

Y L

.r v t

/3

/2

:5

:2

P

M

GI001

CODE REVIEW

P.O.C.: JESSE KLANKOWSKI

JK DT09-30-2025

HORIZONTAL BUILDING SEPARATION

ALLOWANCE

NONE N/A NFPA 5000 CH6

INCIDENTAL USES SEPARATION IF REQUIRED SOILED, LINEN, CLEAN, STORGE> 100SF SEE LIFE SAFETY PLANS NFPA 5000 CH6

SEPARATION OF OCCUPANCIES IF REQUIRED 2 HR PER 2HR NFPA 5000 CH6

ALLOWABLE AREA UNLIMITED PARTIAL REMODEL OF EXISITNG NFPA 5000 CH7

SPRINKLER SYSTEM FULL SPRINKLER SYSTEM MODIFICATIONS TO EXISTING NFPA 13

ALLOWABLE NUMBER OF STORIES ABOVE

GRADE PLANE

UNLIMITED 3 STORIES (EXISTING) NFPA 5000 CH7

ALLOWABLE BUILDING HEIGHT IN FEET... UNLIMITED 60 FT (EXISTING) NFPA 5000 CH7

BUILDING CONSTRUCTION TYPE TYPE 1 (221) NFPA 5000 CH6

ADDRESS IDENTIFICATION EXISTING N/A 501.2

BUILDING HEIGHTS & AREAS NFPA

SPECIALTY OCCUPANCY REQUIREMENTS NFPA

MIXED OCCUPANCY (EXISTING) BUSINESS (NFPA), B (IBC) NFPA CHAPTER...

BUILDING OCCUPANCY (EXISTING) HEALTH CARE (NFPA), I-2 (IBC) NFPA CHAPTER...

OCCUPANCY GROUP NFPA

BUILDING CLASSIFICATION

HEIGHT N/A N/A

LOT FRONTAGE N/A N/A

STREET SIDE YARD N/A N/A

SIDE N/A N/A

REAR N/A N/A

FRONT N/A N/A

SETBACKS REQ NFPA

NUMBER OF VAN ACCESSIBLE STALLS

REQUIRED

N/A N/A

NUMBER OF ACCESSIBLE STALLS REQUIRED N/A N/A

NUMBER OF STALLS REQUIRED N/A N/A

PARKING REQ: NFPA

CODE / AHJ REQUIREMENTS ACTUAL PROVIDED

NFPA CODE

REFERENCE

PERMIT REQ'D Y/N: NO

ZONE:

AHJ: VA SAFETY OFFICER AND FACILITY SAFETY ENGINEER

* STATE AND LOCAL ORDINANCES AS APPLY

* 2025 VA SPACE PLANNING CRITERIA (VA-TIL)

* 2025 VA STANDARDS (VA-TIL)

* 2022 FACILITY GUIDELINES INSTITUTE (FGI)

* 2004 INTERNATIONAL BUILDING CODE (IBC)

* 2024 NFPA 13

* 2024 NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION

* 2024 NFPA 99 HEALTHCARE FACILITIES CODE

* 2024 NFPA 1 FIRE CODE & ALL REFERENCE CODE THEREIN

APPLICABLE CODES: *2024 NFPA 101 LIFE SAFETY CODE

SITE AREA: MULTI BUILDING SITE

ST. CLOUD, MN

SITE ADDRESS: 4801 VETERANS DRIVE

St. Cloud VA Healthcare System - Repair Building 50 Basement Kitchen

PROJECT NO: 221958

CODE REVIEW

CARBON MONOXIDE DETECTORS NO NO NFPA 101

20.3.4.5.2

ATTIC FLR 2 FEC EXISTING NFPA 10 6.2.1.1

2ND FLR 2 FEC EXISTING NFPA 10 6.2.1.1

1ST FLR 2 FEC EXISTING NFPA 10 6.2.1.1

BASEMETN 2 FEC 2 PROVIDED NFPA 10 6.2.1.1

NUMBER OF FEC REQUIRED PER FLR

MAX TRAVEL DISTANCE TO FEC 75 FEET >75 FEET NFPA 10 6.2.1.1

MAXIMUM FLOOR AREA FOR

EXTINGUISHER

11,250 SQ FT >11,250 SQ FT NFPA 10 6.2.1.1

MAXIMUM FLOOR AREA PER UNIT OF

CLASS A

3,000 SQ FT >3,000 SQ FT NFPA 10 6.2.1.1

MINIMUM RATED SINGLE EXITNGUISHER EXT TYPE = 2A 2A NFPA 10 6.2.1.1

FIRE EXTINGUISHER REQUIREMENTS

FIRE DEPARTMENT ACCESS WITHIN 300 FT OF ALL PORTIONS OF THE FIRST

FLOOR OF THE BUILDING

EXISTING NFPA 1

CH18.2.3.2.2.1

AUTOMATIC SPRINKLER SYSTEM NFPA 13 NFPA 13 - FULLY AUTOMATIC, SUPERVISED

SYSTEM

NFPA 13 CH4

FIRE PROTECTION SYSTEMS REVIEW INTERNATIONAL FIRE CODE (IFC) NFPA

FLOOR FINISH CLASS I OR CLASS II CLASS 1 NFPA 101 CH10.2.7

FLOORS

OTHERS CLASS A, B, OR C CLASS A NFPA 101...

EXITS & EXIT ACCESS CORRIDORS CLASS A OR B CLASS A NFPA 101...

WALLS & CEILINGS

INTERIOR FINISHES NFPA

FIRE WALL 706.1 MOST RESTRICTIVE OCCUPANCY SHALL

GOVERN IF FIRE WALLS ARE REQUIRED

EXISTING NFPA 101

CH6.1.14.4

MAXIMUM AREA OF EXTERIOR WALL

OPENINGS

UNLIMITED (EXCEEDS 30'-0" AND IS FULLY

SPRINKLED BUILDING)

EXISTING NFPA 80 CH4.4.4

FIRE WALLS REQUIRED (Y/N) - NO

BUILDINGS ON THE SAME LOT (Y/N) - YES

30 FEET OR GREATER 20 FEET N/A

GREATER THAN 3 FEET TO LESS THAN

30 FEET

24 INCHES PLUS 8 INCHES FOR EVERY FOOT OF

FSD BEYOND 3 FEET OR FRACTION THEREOF

N/A

GREATER THAN 2 FEET TO 3 FEET 24 INCHES N/A

O FEET TO 2 FEET PROJECTIONS NOT PERMITTED N/A

EXTERIOR PROJECTIONS N/A NFPA 101 CH9.7

SYSTEM IN PLACE FULLY AUTOMATIC SPRINKLER SYSTEM INSTALLED

FIRE & SMOKE PROTECTION NFPA

JOINING DOORS 45 MIN NFPA CH19

UNIT DOORS 20 MIN NFPA CH19

RATED WALL OPENINGS AT CORRIDORS

SHAFT WALL 2 EXISTING NFPA 101 CH8.6

ELEVATOR 2

EXISTING NFPA 101 CH8.6

STAIRS 2

EXISTING NFPA 101 CH8.6

CORRIDOR RATING .5

EXISTING NFPA 220 TBL 4.1.1

ROOF CONSTRUCTION 2

EXISTING NFPA 220 TBL 4.1.1

NFPA 220 TBL 4.1.1

FLOOR CONSTRUCTION 2

EXISTING NFPA 220 TBL 4.1.1

NON BEARING WALLS AND PARTITIONS -

INTERIOR

SEE LIFE SAFETY PLANS NFPA 220 TBL 4.1.1

NONBEARING WALLS AND PARTITIONS -

EXTERIOR

SEE LIFE SAFETY PLANS NFPA 220 TBL 4.1.1

INTERIOR 2

EXISTING NFPA 220 TBL 4.1.1

EXTERIOR 2

EXISTING NFPA 220 TBL 4.1.1

BEARING WALLS 2

EXISTING NFPA 220 TBL 4.1.1

PRIMARY STRUCTURE 2

EXISTING NFPA 220 TBL 4.1.1

CONSTRUCTION TYPE: NFPA

CODE / AHJ REQUIREMENTS ACTUAL PROVIDED

NFPA CODE

REFERENCE

ROOF ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... EXISTING N/A

CEILING ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... SEE CEILING LEGENDS AND ARCH SECTION... N/A

FLOOR ASSEMBLIES SEE WALL TYPE LEGENDS AND ARCH SECTION... EXISTING N/A

WALL ASSEMBLIES SEE CHAPTER 6 FOR RATED ASSEMBLY... SEE WALL TYPE LEGENDS AND ARCH SECTIO... N/A

UL-RATED SYSTEMS AND DESIGN

NUMBER NFPA

SOUND TRANSMISSION STC RATING OF AL LEAST 50 BETWEEN ADJACENT

DWELLING UNITS AND 35 BETWEEN DWELLING

UNITS AND ADJACENT PUBLIC SPACES.

N/A

LABELING FIRE WALLS LABEL ALL FIRE WALLS ABOVE ALL CEILINGS. NFPA 101 CH8.2.2.5

MISCELLANEOUS INFORMATION NFPA

SPECIALTY REQUIREMENTS NONE EXISTING

REQUIRED? YES EXISTING

ELEVATORS & CONVEYING SYSTEMS NFPA

SERVICE SINK 1 SEE PLUMBING PLANS N/AA

DRINKING FOUNTAINS 0 EXISTING N/A

LAVATORIES - FEMALE 1 PER UNIT EXISTING N/A

LAVATORIES - MALE 1 PER UNIT EXISTING N/A

WATER CLOSETS - FEMALE 1 PER UNIT EXISTING N/A

WATER CLOSETS - MALE 1 PER UNIT EXISTING N/A

OCCUPANCY #

MINIMUM NUMBER OF REQUIRED

PLUMBING FIXTURES

REQUIRED TYPE OF FIXTURES PROVIDED TYPE OF FIXTURE N/A

PLUMBING SYSTEMS NFPA

SPECIAL OCCUPANCIES I-2 HOSPITALS: 10% MINIMUM (VA: 100%) N/A ABAAS (VA BARRIER)

ACCESSIBLE DWELLING UNITS & SLEEPING

UNITS

N/A N/A ABAAS (VA BARRIER)

ACCESSIBLE ROUTES FOR DWELLINGS N/A N/A ABAAS (VA BARRIER)

ACCESSIBLE PARKING SPACES N/A N/A ABAAS (VA BARRIER)

ACCESSIBLE ENTRANCES I-2 HOSPITALS; 50% (VA: 100%) EXISTING ABAAS (VA BARRIER)

ACCESSIBLE ROUTE AT LEAST ONE ACCESSIBLE ROUTE. EXISTING ABAAS (VA BARRIER)

REQUIREMENTS APPLICABLE EXCEPTIONS? NONE ABAAS (VA BARRIER)

ACCESSIBILITY 68 UNITS NFPA

DEAD END CORRIDOR LENGTH 20'-0" SEE LIFE SAFETY PLAN NFPA 101...

MAX COMMON PATH OF TRAVEL 100'-0" SEE LIFE SAFETY PLAN NFPA 101...

ALLOWABLE EXIT ACCESS TRAVEL

DISTANCE

200'-0"HEALTHCARE = (PATIENT ROOM TO EXIT

DOOR = 50')

95' SEE LIFE SAFETY PLAN NFPA 101

CH19.2.6.2

AREA OF REFUGE REQUIRED NO FULLY SPRINKLED BUILDING NFPA 101...

MEANS OF EGRESS ILLUMINATION

REQUIRED?

YES EXISTING NFPA 101 CH7.8

MINIMUM NUMBER OF EXITS OR ACCESS

TO EXITS PER STORY

2 EXISTING NFPA 101 CH19.2.4

SPECIAL EXCEPTIONS NONE N/A NFPA 101 CH7

NUMBER OF EXITS & EXIT ACCESS

DOORWAYS REQUIRED

2 (IN AREAS WITH MORE THAN 50 OCC.) EXISTING NFPA 101 CH7

MINIMUM CORRIDOR WIDTH 44" EXISTING NFPA 101 CH7

DOOR SWINGS ≥ 50 OCCUPANT = SWING IN DIRECTION OF

TRAVEL

DOORS (multiply by 0.2 inches/occupant) SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.1

STAIRWAYS (multiply by 0.3 inches/occupant - sprinkled throughout)

SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.1

MEANS OF EGRESS SIZING

HEALTHCARE 50 GROSS SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.2

HEALTHCARE 240 GROSS SEE LIFE SAFETY PLAN NFPA 101 CH7.3.1.2

LIST TYPE LIST FACTOR TOTAL OCCUPANTS NFPA 101 CH7.3.1.2

OCCUPANCY LOAD - FUNCTION OF SPACE

(LIST BELOW)

OCCUPANT LOAD FACTOR

MEANS OF EGRESS NFPA

CODE / AHJ REQUIREMENTS ACTUAL PROVIDED NFPA

Figure 302.2 Carpet Pile Height

Figure 303.2 Vertical Change in Level

1/ 2" m ax

1/ 4" m ax

Figure 302.3 Elongated Openings in Floor or

Ground Surfaces d ir ec ti o n o f tr av el lo n g d im d o m in an t p er p in d ic u la r to

1/2" max dominant direction of travel

Figure 303.3 Beveled Change in Level

1/

1/

1/

1/

Figure 304.3.1.2 Circular Turning Space - Existing

Buildings Size and Overlap

Figure 304.3.1.1 Circular Turning Space - New Buildings Size and Overlap m ax

Overlap of knee and toe clearance Overlap of knee and toe clearance

6.

2.

m ax

P er ø 5'-7" min ø 5'-0" min

Figure 304.3.2.2 T-Shaped Turning Space New Buildings - Size and Overlap ar m ar m base

Figure 304.3.2.1(A) T-Shaped Turning Space New Buildings - Option 1 ar m ar m base

68" min min

16" min

36" min

16" m in m in36 m in

Figure 304.3.2.1(B) T-Shaped Turning Space New Buildings - Option 2 ar m ar m base

64" min min

11" min

42" min

11" m in m in m in

Figure 304.3.2.1(C) T-Shaped Turning Space New Buildings - Option 3 ar m ar m base

64" min min

12" min

40" min

12" m in m in m in

60" min min

12" min

36" min

12" m in36 m in m in

Figure 305.3.2 Clear Floor or Ground

Space- Existing Buildings

Figure 305.5 Position of Clear Floor or Ground Space

Figure 305.7.1 Maneuvering Clearance in an

Alcove, Forward Approach

Figure 305.7.2 Maneuvering Clearance in an

Alcove, Parallel Approach

(a) forward

(b) parallel

Figure 305.3.1 Clear Floor or Ground Space- New Buildings

52" min m in

48" min m in

30" min m in

48" min m in

36" min

X

4"

60" min

X

5"

Figure 306.2 Toe Clearance

Figure 306.3 Knee Clearance

(b) plan

(a) elevation

9"

6" max m in

17"- 25"

(b) plan

(a) elevation m in

25" max

11" min

8" min m in

Figure 307.2 Limits of Protruding Objects

4" max

X

7"

X

0"

Figure 307.3 Post-Mounted Protruding Objects

(b)(a)

0"

12" max 12" max m ax X > 12"

X > 12" m in

Figure 307.4 Vertical Clearance

M ax

X

Figure 308.3.1 Unobstructed Side Reach

Figure 308.3.2 Unobstructed High Side Reach

Figure 308.2.2 Obstructed High Forward Reach

Figure 308.2.1 Unobstructed

Forward Reach

(a) (b)

(b)(a) m in m ax m ax

20" max m ax

20"- 25" max

10" max m in m ax

10" max 10" - 24" max m ax m ax m ax m ax

B U

IL

D

IN

G

B L

O C

K S

1. ALL CONSTRUCTION & RENOVATION SHALL MEET THE ARCHITECTURAL BARRIERS ACT

ACCESSIBILITY STANDARD (ABAAS).

2. SUPPLEMENTAL TO THE (ABAAS), CONSTRUCTION & RENOVATION IN HEALTH FACILITIES OF

THE DEPARTMENT OF VETERAN AFFAIRS (VA) SHALL COMPLY WITH THE VA BARRIER FREE

DESIGN STANDARD: A SUPPLEMENT TO THE ARCHITECTURAL BARRIERS ACT

ACCESSIBILITY STANDARDS (PG-18-13).

GENERAL NOTES

OVERRIDE BY VA BARRIER FREE

DESIGN STANDARD

MINIMUM REQUIREMENTS

• SITES - PARKING SPACES ACCESSIBLE 1% GREATER THAN ABAAS

• SPINAL CORD INJURY/DISORDER (SCI/D) FACILITIES: 0.2 ACCESSIBLE SPACES PER

INPATIENT BED; 0.5 PER LONG-TERM CARE BED; 5.6 PER OUTPATIENT EXAM ROOM.

DEDICATED FOR SCI/D PATIENTS

• HOSPITAL OUTPATIENT FACILITIES 10% OF TOTAL SPACES

• REHABILITATION AND OUTPATIENT

PHYSICAL THERAPY FACILITIES 20% OF TOTAL SPACES

• BUILDING-ACCESSIBLE SEATING, ASSEMBLY AREAS 1% GREATER THAN ABAAS

ACCESSIBLE ROUTE

• WIDTH, MIN. PATIENT CARE AREAS 6'-0"

• WIDTH, MIN. ADMINISTRATIVE AREA 5'-0"

• SLOPE, MAXIMUM (INCLUDING PARKING SPACES) 1:50 (2%)

• MINIMUM GRADIENT OF WALK REQUIRING REST

AREAS EVERY 200' 1:50 (2%)

• TURNING RADIUS 5'-6"

• TURNING RADIUS, BARIATRIC 6'-0"

• T-SHAPED TURNING SPACE 5'-6" x 5'-6"

• T-SHAPED TURNING SPACE, BARIATRIC 6'-0" x 6'-0"

FLOOR SURFACES

• CHANGES IN LEVEL NOT PERMITTED ON SCI FLOORS

• CARPET CUSHION OR PADDING NOT PERMITTED

PARKING & PASSENGER LOADING ZONES

• ACCESS AISLE REQUIREMENT FOR ACCESSIBLE

PARKING SPACES 5'-0" EACH SIDE

• PASSENGER LOADING AREA

"COMMUNICATION SYSTEM" FOR ASSISTANCE AT SCI UNITS YES

CURB RAMPS

• WIDTH, MINIMUM 4'-0"

RAMPS

• MAXIMUM SLOPE 1:20

• MAXIMUM LENGTH, WITHIN RANGE OF 1:33 - 1:26 40'

• MAXIMUM LENGTH, WITHIN RANGE OF 1:25 - 1:20 35'

• MINIMUM CLEAR WIDTH 4'-0"

• MINIMUM SIZE LEVEL LANDING,

WHERE DOORS SWING INTO LANDING 6'-0" X 6'-0"

STAIRS

• HANDRAIL HEIGHT 34"

ELEVATOR (PASSENGER)

• MINIMUM WIDTH OF ELEVATOR DOORS 4'-0"

• MINIMUM CAR SIZE 8'-0" X 6'-2" PLATFORM SIZE

• DOUBLE SET OF HANDRAILS YES

WINDOWS

• SILL HEIGHT IN PATIENT BEDROOMS 24" MAXIMUM

DOORS & DOORWAYS

• PATIENT CARE DELIVERY AREAS WITH PATIENT BED,

STRETCHER OR GURNEY ACCESS, MINIMUM WIDTH 4'-0"

WATER CLOSETS - INPATIENT NURSING UNITS

• GRAB BAR CONFIGURATION: DOUBLE SWING-UP BARS FOR ALL PATIENT TOILETS/SHOWER

ROOMS ON NURSING UNITS.

TOILET STALLS

• MINIMUM ACCESSIBLE STALL SIZE 5'-6" X 6'-0"

• MINIMUM SIZE WHEELCHAIR "FRONT-TRANSFER" STALL 3'-6" X 6'-0"

• GRAB BARS REQUIRED IN ALL STALLS

SHOWER STALLS (PATIENT)

• MINIMUM STALL DIMENSIONS 4'-0" X 4'-0"

• GRAB BARS HORIZONTAL PLUS VERTICAL BARS

TOILET ROOMS

• INPATIENT BEDROOM TOILET ROOMS,

MINIMUM WIDTH OF TOILET ROOM ENTRANCE DOORS 48"

CAFETERIAS

• KNEE CLEARANCE, FOR MINIMUM 5% TABLES 2'-3" & 2'-5" FOR AT LEAST 5%

• CUTLERY AND SUPPLY HEIGHT 40" - 48"

HEALTH CARE FACILITIES

• MEDICAL/SURGICAL NURSING UNITS,

PERCENT OF PATIENT BEDROOMS ACCESSIBLE 100%

• MEDICAL/SURGICAL NURSING UNITS,

PERCENT OF TOILET ROOMS ACCESSIBLE 100%

Figure 703.6.1 Pictogram Field

MEN not in pictogram field

6" M in

Figure 705.1 Size and Spacing of Truncated Domes base diameter of 0.9"-1.4" top diameter of 50%-65% of the base diameter

(a) elevation (enlarged)

(b) plan

.6 5"

M in

1.6" - 2.4"

1.

6"

.4

Figure 707.6.2 Numeric Key Layout

(a) 12-key ascending

(b) 12-key descending

1 2 3

4 5 6

7 8 9

* 0 #

7 8 9

4 5 6

1 2 3

* 0 #

Figure 703.2.5 Height of Raised

Characters

LIBRARY

5/ 8"

"0.

2"

Figure 703.3.1 Braille Measurement single braille cell blank cell space between words raised dot no raised dot

Figure 703.3.2 Position of Braille

AREA OF

REFUGE

3/ 8" m in

3/ 8" m in

Figure 703.7.2.1 International Symbol of Accessibility

Figure 703.7.2.2 International TTY Symbol

Figure 703.7.2.3 Volume-Controlled Telephone

Figure 703.7.2.4 International Symbol of Access for

Hearing Loss

Figure 704.2.1.1 Parallel Approach to

Telephone

Figure 704.2.1.2 Forward Approach to

Telephone

Figure 703.4.1 Height of Tactile Characters

Above Floor or Ground

Figure 703.4.2 Location of Tactile Signs at Doors

AREA OF

REFUGE

centered on tactile characters

AREA OF

REFUGE

.00

M ax

M ax

M in

M ax

18" Min

M in distance between corresponding dots from one cell directly below distance between dots in the same cell distance between corresponding dots in adjacent cells distance between dots in the same cell base diameter

C O

M M

U N

IC

A

T

IO

N E

L E

M E

N T

S A

N D

F E

A T

U R

E S

Figure 404.2.4.3 Maneuvering Clearance at Recessed Doors and Gates

Figure 404.2.4.2 Maneuvering Clearance at Sliding and Folding Doors

Figure 404.2.4.1 Maneuvering Clearance at Manual Swinging Doors and Gates

Figure 404.2.3 Clear Width of Doorways

Figure 404.2.6 Doors in Series and Gates in Series

(e) hinge approach, pull side

(j) latch approach, push side

(k) latch approach, push side

*48 min if door provided with closer

(i) latch approach, pull side

*54 min if door provided with closer

(h) latch approach, pull side

(f) hinge approach, push side

(g) hinge approach, push side

*if door provided with both closer and latch ** 48 min if both closer and latch provided

(b) front approach, push side

(c) front approach, push side

*if door provided with both closer and latch

(a) front approach, pull side

(a) hinged door

(b) sliding door

(c) folding door

(d) doorways without doors

(a) pull side

(b) push side

(c) push side, door provided with both closer and latch

(a) front approach

(b) side approach

*48 min at front approach

(c) pocket or hinge approach

(d) stop or latch approach

(d) hinge approach, pull side

(a)

(c)

(b)

(d) front approach symbol

90.

32" min

32" min

32" min

36" min

18" min m in m in

*12" min

36" min 60 m in

42" min m in

2" m in

22" min* 12" min m in

24" min

24" min m in m in m in

22" min m in m in

24" min m in

18" min

X >8

X >8 m in m in

12" min

X >8

48" min

48" min

48" min m in

66" min D O

O R

S A

N D

G A

T E

S

Sanitary Napkin Disposal

Sanitary Napkin Dispenser m ax

Soap Dispenser

Paper Towel Dispenser

T .O

. d is p en se r

O P

G m ax

Baby Changing Station to B

.O m in to h ig h es t p ar t m ax

LINE OF WALL

Coat/Robe Hook

4' -0

A

C C

5' -4

T

Y P

Door Viewer

3' -7

A

C C

5' -0

T

Y P

Mirror Height to g la ss

Fire Extinguisher Cabinet m ax t o t h e h an d le m ax

Fire Extinguisher m ax t o t h e h an d le m ax

Hand Dryer

Trash Receptacle m ax w o rk s u rf ac e o f w o rk s u rf ac e

T .O

. o p er ab le p o rt io n m ax

Toilet Seat Cover Dispenser

M O

U N

T

IN

G H

E

IG

H T

S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT OF RECORD

A/E:

STAMP

CONSULTANTS

321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

100% CONSTRUCTION DOCUMENTS

REPAIR BUILDING 50 BASEMENT KITCHEN

SAINT CLOUD, MN

VA# 656-20-130

STONE GROUP ARCHITECTS

600 E 7TH STREET

SIOUX FALLS, SD 57103

605-271-1144

DUNHAM

50 SOUTH SIXTH STREET

SUITE 1100

MINNEAPOLIS, MN 55402

612-465-7550

P.O.C.: JASON GOTWALTT (M)

BEN ZURN (E)

MECHANICAL, ELECTRICAL, PLUMBING:

Phase

Drawing Title

DATE:

APPROVED: SERVICE LINE DIRECTOR DATE:

APPROVED: GEMS COORDINATOR DATE:

APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:

APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECT COR

APPROVED: SAFETY MANAGER

DATE:

C U s e rs

\d .t o u g a s \D o c u m e n ts \2

V

A S t C lo u d

R e p a ir B

B a s e m e n t K it c h e n d a rr in tJ

Y L

.r v t

/3

/2

:5

:2

P

M

GI011

ACCESSIBILITY DETAILS

P.O.C.: JESSE KLANKOWSKI

JK DT09-30-2025Revision# Description Date:

A. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL INFORMATION

B. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND PARTICULATE MATTER TO THE CONSTRUCTION

AREA. CONSTRUCTION AREA PERIMITER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITED BY CLASS. ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND

LISTED IN ICRA CLASS.

C. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.

D. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON, PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE OF

CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR EACH PREMIT.

E. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR TO DECK/FLOOR ABOVE.

F. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM AND AFTER 8:00 PM OR DIRECTED BY COR.

G. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE

IN AREAS LESS THAT 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN

5000 SF AND 10000 SF.

H. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.

I. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO COMPLETELY EXCHANGE THE REGULATED AREA AIR

VOLUME (4) FOUR ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE

EVENT OF MACHINE FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.

J. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS, CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.

K. ANY DUST PARTITIONS OR ICRA - CONSTRUCTION BARRIERS CONSTRUCTED BY THE CONTRACTOR PRIOR TO THE START OF

DEMOLITION MUST REMAIN IN PLACE UNTIL THE COMPLETION OF CONSTRUCTION.

L. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO THE VA OCCUPIED AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED USE OF ALL OCCUPIED AREAS, INCULDING THE APPLICABLE MECHANICAL AND ELECTRICAL

SYSTEMS SERVING THESE AREAS.

M. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL DRAWING(S) AND DEMOLITION PLANS.

N. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENT IS FOR ARCHITECT-OWNER PLANNING PURPOSES

ONLY.

O. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS OF EGRESS THROUGHOUT ALL PHASING.

GENERAL INFECTOIN CONTROL & CONSTRUCTION BARRIER NOTES:

NOTE:

• PROVIDE 1 HOUR FIRE RATED, STARC SYSTEMS FIREBLOCK WALL

PANELS OR APPROVED EQUAL FOR ALL ICRA/CONSTRUCTION

BARRIERS AND MODIFY SPRINKLER HEADS TO BE UPTURNED AND

EXTENDED TO 18" OF STRUCTURE.

• MOBILE ICRA CONTAINMENT SYSTEMS WILL NEED TO BE USED IN

AREAS OF WORK THAT ARE OUTSIDE OF THE INDICATED ICRA /

CONSTRUCTION BARRIER LOCATIONS. SEE MECHANICAL & ELECTRICAL

DRAWINGS FOR ADDITIONAL AREAS OF WORK.

ICRA / CONSTRUCTION BARRIER

LOCATION

CATEGORY

A

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)

INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:

• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS

• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.

• WORK THAT DOES NOT CREATE DUST OR DEBRIS

• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO

EXCEED 1 AN HOUR FOR EACH TILE) WITHIN THE SHIFT.

• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE

DUST OR DEBRIS.

• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT, ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF

BULBS, RECEPTACLES, OR SWITCHES.

GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:

• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETE.

• WORK THAT CREATES MINIMAL DUST AND DEBRIS.

• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND NEW FLOORING THAT PRODUCES MINIMAL DUST AND

DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY SANDING) THAT PRODUCES MINIMAL DUST AND DEBRIS).

• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY WORK ON SANITARY PLUMBING INCLUDING SNAKING OF

DRAINS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL

DUST AND DEBRIS

• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE TERMINAL UNIT, OR A SINGLE DEVICE THAT PRODUCES

MINIMAL DUST AND DEBRIS

SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETE.

• DEMOLITION OF REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.

• DEMOLITION/REMOVAL OF MORE THAN 32 SQ. FT. OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND

BRANCH PIPING.

• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS, AND TOILETS AND ASSOCIATED PLUMBING.

• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW

DEVICES SUCH AS TERMINAL UNITS, FANS ETC.

• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.

LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

• WORK EXCEEDING 6 MONTHS IN DURATION.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• LARGE SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC

• THE INSTALLATION OF BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL, AND ASSOCIATED PLASTER WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS

INCLUDING ASSOCIATED PLUMBING.

• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE

INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.

• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.

• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT EXCHANGERS, TERMINAL UNITS, AND CONTROLS.

CATEGORY

B

CATEGORY

C

CATEGORY

D

TABLE 1 - CONSTRUCTION, RENOVATION AND/OR MAINTENANCE ACITIVITY CATEGORY

LOW RISK MEDIUM

RISK

HIGH RISK

HIGHEST

RISK

NON-PATIENT CARE AREAS SUCH AS:

• PUBLIC HALLWAYS AND GATHERING AREAS NOT IN CLINICAL AREAS

• OFFICE AREAS NOT IN CLINICAL AREAS

• BREAKROOMS NOT IN CLINICAL AREAS

• BATHROOMS OR LOCKER ROOMS NOT IN CLINICAL AREAS

• MECHANICAL/ELECTRICAL ROOMS NOT IN CLINICAL AREAS

PATIENT CARE SUPPORT AREAS SUCH AS:

• WAITING AREAS

• CLINICAL ENGINEERING (BIOMEDICAL)

• MATERIALS MANAGEMENT

• STERILE PROCESSING DEPARTMENT (DIRTY SIDE)

• KITCHEN, CAFETERIA, GIFT SHOP, COFFEE SHOP, AND FOOD

KIOSKS

PATIENT CARE AREAS SUCH AS:

• PATIENT CARE ROOMS AND AREAS, INCLUDING SPINAL CORD INJURY UNITS

• ALL ACUTE CARE UNITS, INCLUDING MENTAL HEALTH

• ALL OUTPATIENT UNITS AND CLINICS

• EMERGENCY DEPARTMENT

• COMMUNITY LIVING CENTERS, DOMICILIARIES, AND TRANSITIONAL

RESIDENCES

• EMPLOYEE HEALTH

• PHARMACY - GENERAL WORK ZONE

• MEDICATION ROOMS AND CLEAN UTILITY ROOMS

• IMAGING SUITES - DIAGNOSTIC IMAGING

• LABORATORY

PROCEDURAL, INVASIVE STERILE SUPPORT AND HIGHLY COMPROMISED PATIENT

CARE AREAS SUCH AS:

• ALL TRANSPLANT UNITS

• ALL INTENSIVE CARE UNITS

• ALL ONCOLOGY UNITS AND CHEMOTHERAPY/ INFUSION CENTER

• OR THEATERS AND RESTRICTED AREAS

• HEMODIALYSIS UNITS

• PROCEDURAL ROOMS

• PHARMACY COMPOUNDING AREA

• STERILE PROCESSING DEPARTMENT - CLEAN SIDE

• TRANSFUSION SERVICES

• IMAGING SUITES - INTERVENTIONAL IMAGING

• DEDICATED ISOLATION WARDS/UNITS FOR INFECTIOUS DISEASES

TABLE 3 - PATIENT RISK CATEGORIES

TABLE 4 - LEVEL OF INFECTION PREVENTION AND CONTROL PRECAUTIONS

PATIENT RISK CATEGORY

LOW RISK

ACTIVITY CATEGORY

A B C D

I II II III

MEDIUM RISK I II III IV

HIGH RISK I II IV IV

HIGHEST RISK II III IV IV

CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA) - CONT.

LEVEL

I

LEVEL

II

LEVEL

III

LEVEL

IV

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF CONTAMINANTS AND LOOSE MATERIAL.

SAME AS CLASS I PLUS:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST

CONTAINMENT CART OR SOME OTHER SYSTEM)

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS

DIFFUSER ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR ISOLATED

FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION

6. CONTAIN TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE

AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH HARD LID)MUST BE USED TO TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS

MUST BE DAMP-WIPED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT THE ENTRANCE OF CONTAINED WORK AREA BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN

VISIBLY SOILED.

10. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OF HEPA VACUUMING SURFACES AT LEAST DAILY

SAME AS CLASS I AND II PLUS:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS. BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK

ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY AFFIXED

TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURED FROM MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING, USING APPROVED MATERIALS (UL SCHEDULED FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES/WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A WORK

SPECIFIED WAIVER IS APPROVED BY VHA'S OFFICE OF HEALTHCARE ENGINEERING); THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT. EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OF GREATER FROM ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR DIGITAL MOTORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR AND DOCUMENT NEGATIVE PRESSURIZATION. THE"BALL IN THE WALL" OR SIMILAR APPARATUS ARE NOT ACCEPTABLE.

SAME AS CLASS I, II, AND III PLUS:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS' PPE

AND CLEANING

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE WORK ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF

COVER SUITS IS ACCEPTABLE

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM. SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED

SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

TABLE 5 - REQUIRED INFECTION PREVENTION AND CONTROL MEASURES, BY LEVEL OF PRECAUTIONS

TABLE 6 (4)

CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.

HVAC SYSTEMS:

1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVELS

I - II

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER SURFACES AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED. ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN

REMOVING HARD BARRIERS:

i. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

ii. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA VACUUM.

iii. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

iv. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD BARRIER.

v. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE WORK AREA.

2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT) MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER

COMPLETION OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND BEFORE REMOVAL OF CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

ARCHITECT OF RECORD

A/E:

STAMP

CONSULTANTS

321 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

100% CONSTRUCTION DOCUMENTS

REPAIR BUILDING 50 BASEMENT KITCHEN

SAINT CLOUD, MN

VA# 656-20-130

STONE GROUP ARCHITECTS

600 E 7TH STREET

SIOUX FALLS, SD 57103

605-271-1144

DUNHAM

50 SOUTH SIXTH STREET

SUITE 1100

MINNEAPOLIS, MN 55402

612-465-7550

P.O.C.: JASON GOTWALTT (M)

BEN ZURN (E)

MECHANICAL, ELECTRICAL, PLUMBING:

Phase

Drawing Title

DATE:

APPROVED: SERVICE LINE DIRECTOR DATE:

APPROVED: GEMS COORDINATOR DATE:

APPROVED: CHIEF OF POLICE DATE: APPROVED: PATIENT SAFETY DATE:

APPROVED: INFECTION CONTROL NURSE DATE: APPROVED: CHIEF OF STAFF DATE:

APPROVED: DIRECTOR FMS DATE: APPROVED: ASSOCIATE HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECTS SECTION MANAGER DATE: APPROVED: HEALTH CARE DIRECTOR DATE:

APPROVED: PROJECT COR

APPROVED: SAFETY MANAGER

DATE:

C U s e rs

\d .t o u g a s \D o c u m e n ts \2

V

A S t C lo u d

R e p a ir B

B a s e m e n t K it c h e n d a rr in tJ

Y L

.r v t

/3

/2

:5

:2

P

M

GI021

ICRA

P.O.C.: JESSE KLANKOWSKI

JK DT09-30-2025Revision# Description Date:

DN

CODE PLAN LEGEND

0.0"

0.0"

OCCUPANTS

REQUIRED WIDTH

PROVIDED WIDTH

OCCUPANT LOAD

TD = X'-X"

PATH OF TRAVEL FOR EGRESS

TRAVEL DISTANCE (TD)

TD = X'-X"

PATH OF TRAVEL TO FIRE EXTINGUISHER

TRAVEL DISTANCE (TD)

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SMOKE SEALS ON ALL RATED DOORS.

C. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

GENERAL CODE PLAN NOTES:

1417 SF

KITCHEN

TRAY

SERVICE

54 SF

7C

OFFICE

198 SF

STAIR

120 SF

BATH

29 SF

PIPE CHASE 70 SF

7B

STORAGE

56 SF

7A

HAC

130 SF

4C

LACTATE

ROOM

302 SF

4A

FAMILY

MEDITATION

195 SF

C0SE

CORRIDOR

199 SF

2A

STORAGE

81 SF

LINEN

CHUTE

95 SF

2B

STORAGE

152 SF

EQUIP

STORAGE

565 SF

MALE

LOCKERS

818 SF

C0C

CORRIDOR

74 SF

E02

ELEVATOR

43 SF

23B

PHONE

73 SF

E01

ELEVATOR

127 SF

ELEVATOR

EQUIP.

152 SF

23A

ELECT

200 SF

RECREATION

OFFICE

1165 SF

KITCHEN

DISHWASHING

27 SF

10A

HAC

230 SF

10B

CART

STAGING

187 SF

EMPLOYEE

LOUNGE

49 SF

11B

BATH

46 SF

11A

BATH

285 SF

MECH

174 SF

4D

MECH

174 SF

4E

HAC

3.2"

40.0"

3.4"

40.0"

LEN

G

TH

O

F TR

AVEL: 99'-0"

LE

N

G T

H O

F T

R A

V E

L: 47'-6"

10.42

10.42

LE

N G

TH

O

F

TR

A V

E L:

8'

-1 0"

LENGTH OF TRAVEL: 39'-0"

LENGTH O

F TRAVEL: 3

3'-1 1"

LEN

G

TH O

F TRAVEL: 29'-9"

7 7

LEGEND

BUILDING & LIFE SAFETY REQUIREMENTS

DESCRIPTION

WALL

RATING

NEW

PARTITION KEY

NFPA 101-2021

OPENINGS DAMPERS

RATING RFRNC. TYPE RFRNC.

BUILDING SEPARATION:

FIRE BARRIER

90 MIN

OCCUPANCY/AREA SEPARATION

FIRE BARRIER

2 HR

90 MIN

HORIZONTAL EXIT (& REFUGE AREA)

FIRE BARRIER

90 MIN

VERT. OPG. (EXIT ENCLSR/SHAFT)

FIRE BARRIER

(2 HR = 4 OR MORE STORIES)

(1 HR = LESS THAN 4 STORIES)1 HR

2 HR

60 MIN

90 MIN

HAZ./INCIDENTAL USE

FIRE BARRIER

45 MIN

HAZ./INCIDENTAL USE

SMOKE PARTITIONS

(SPRINKLERED)

NR-

RESIST

SMK

NR

SELF OR AUTO

CLOSING

SUBDIVIDING SPACES

SMOKE BARRIER (I-2 OCCUPANCY)

20 MIN

SUITE SEPARATION

SMOKE PARTITION

NR

*NR

SELF OR AUTO

CLOSING

EXIT ACCESS CORRIDORS (I-2)

SMOKE PARTITIONS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .