Attach_D_Subcontracting_Percentage_Worksheet.pdf
PDF 87 KB Posted
- Attached to
- EC-Vegetation Management Federal contract opportunity
- Solicitation number
- 140R4022Q0012
About this file
This document contains a subcontracting percentage worksheet template and instructions for its use. The worksheet is to be used by a prime contractor and subcontractor to calculate the subcontracting labor percentage under a contract. It instructs the user to input direct labor costs, fringe benefits, and general and administrative overhead rates for both the prime contractor and subcontractor. It then provides a formula to calculate the subcontracting labor cost percentage based on these figures.
The related federal contract opportunity is solicitation number 140R4022Q0012 for EC-Vegetation Management services issued by the Department of the Interior Bureau of Reclamation. No further details are provided on response dates, award dates, pricing terms, set asides, incumbents or other salient information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R4022Q0012_Solicitation_Clauses_Amendment_0001_0001.pdf | ||
| Purpose_of_Amendment_0001.pdf | ||
| EC_Vegetation_Management_Question_and_Answer_0001.pdf | ||
| Attach_A_Performance_Work_Statement.pdf | ||
| 140R4022Q0012_Synopsis_Solicitation.pdf | ||
| Attach_E_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attach_C_Service_Wage_Determinations.pdf | ||
| Attach_B_Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior
FAR Clause 52.219-14, Limitations of Subcontracting
Subcontracting Percentage Worksheet
PRIME CONTRACTOR: ____ ___ SOURCE: ___ ___
SUBCONTRACTOR: _____ SOURCE: _____ _
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $ $
FRINGE BENEFITS* $ $
SUBTOTAL (A) $ (B) $
LABOR G&A** @ % $ $
TOTAL LABOR COSTS (C) $ (D) $
To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
Attachment D
Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
Next, using the formula below, calculate the subcontracting labor percentage.
(D)
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = _______ %
* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31 .205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
** G&A denotes General and Administrative Costs
*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
File details come from the government source that posted it. Updated .