Attach 6 - Tracking Layer T0 WFOV GFE List (Draft) .pdf

PDF 263 KB Posted

Attached to
SDA Tracking Layer Tranche 0 DRAFT RFP Federal contract opportunity
Solicitation number
SDA-SN-20-0009
Issued by
Space Development Agency

View the file

Other files for this federal contract opportunity

Other files attached to SDA Tracking Layer Tranche 0 DRAFT RFP, newest first.
File Type Posted
Tracking T0 Questions and Answers.xlsx XLSX spreadsheet
Attach 7 - Tracking Layer T0 WFOV CDRLs (Draft).pdf PDF
Attach 4 - Tracking Layer T0 WFOV Evaluation Factors (Draft).pdf PDF
Attach 3 Tracking Layer T0 WFOV TRD (Draft).xlsx XLSX spreadsheet
Attach 1 - Tracking Layer TO WFOV SOW (Draft).pdf PDF
HQ085020R0003.pdf PDF
Attach 5 - Tracking Layer T0 WFOV Deliverables List (Draft).pdf PDF
Attach 2 - Tracking Layer T0 WFOV Proposal Instructions (Draft).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation HQ085020R0003

Section J

[Attachment 6]

GOVERNMENT FURNISHED EQUIPMENT (GFE) LIST FOR THE

SDA TRACKING LAYER TRANCHE 0 (T0)

WIDE FIELD OF VIEW (WFOV) PROGRAM

Draft Dated May 11, 2020

FACILITIES:

Number Short Title Description Delivered or

Available by

F1 Space Operations

Center

Facility(s) where mission data processing and satellite C2 will take place.

Location(s) TBD

CDR

F2 Hardware In The

Loop testbed

Facility and test equipment to verify physical and network layer interoperability

PDR

PROPERTY:

Number Short Title Description Delivered or

Available by

P1 Ground Entry

Points

Terrestrial antenna(s) and modem(s) to receive telemetry and transmit commands to the T0 WFOV satellites. Location(s) is

TBD

CDR

P2 Launch Vehicle Rocket(s) that SDA will procure from the

USSF for T0 WFOV program

FRR

SERVICE:

Delivered or

Available by

S1 Communications

Network

Ground fiber network service that SDA will lease on behalf of the program.

Quality of service and locations of service will be driven by program’s technical needs

PER

S2 Launch Vehicle

Integration

Service to integrate the satellites and launch dispenser onto the launch vehicle

FRR

Solicitation HQ085020R0003

Section J

[Attachment 6]

S3 Launch Vehicle

Operations Service to operate the launch vehicles FRR

INFORMATION:

Delivered or

Available by

I1

Open Systems

Interconnection

(OSI) model

Interface Control

Document (ICD)

ICD that controls the physical, data and network interfaces between the T0 WFOV program and adjacent SDA programs

Draft by PDR

Final by CDR

File details come from the government source that posted it. Updated .