This document contains a price sheet for the remodeling of two residences as part of a federal contract opportunity with the Department of the Interior Fish and Wildlife Service Region 2. The price sheet includes line items for asbestos and hazardous remediation, demolition and disposal, plumbing replacement, electrical work including wiring, panels and lighting, communication replacement and fire alarm, and architectural reconstruction, insulation and finish work. Indirect cost line items are also included for insurance, payment and performance bonds, mobilization and demobilization, overhead costs, and profit. Contractors are to provide unit prices and total proposed amounts for work on each residence. The related federal contract opportunity is solicitation number 140F0220R0043 for the INKS DAM NFH REMODEL RESIDENCES #2 & project.

View the file

Other files for this federal contract opportunity

Other files attached to INKS DAM NFH REMODEL RESIDENCES #2 &, newest first.
File Type Posted
Sol_140F0220R0043_Amd_0001.pdf PDF
Attach-8-QTRS-3-Lead Paint Findings.pdf PDF
Attach-2-Drawings Residence-3.pdf PDF
Attach-4-Specifications-Residenc-3.pdf PDF
Attach-3-Specifications-Residence-2.pdf PDF
Attach-7-QTRs-2-Lead Paint Findings.pdf PDF
Attach-9-DBA Min. Wage Rates.pdf PDF
Attach-1-Drawings-Residence-2.pdf PDF
Sol_140F0220R0043.pdf PDF
Attach-6-Past Performance and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

Attach-5- Price Sheet RFP 140F0220R0043-Inks Dan Residence Rehab
BID SCHEDULE-RESIDENCE-2
ITEM
NO.Direct Cost Bid Item DescriptionUnitEst QTYUnit PriceAMOUNT
1Asbestos/Hazzardous RemediationJOB1.00
2Demolition and Disposal (Architectural, Plumbing
and Electrical)JOB1.00
3aPlumbing Replacement (Domestic Water,
Insulation, Valves, Sanitary Sewer and Etc.)JOB1.00
3bPlumbing - Instananeous Tankless Water HeaterJOB1.00
4aELECTRICAL - (Wiring, Conduit, Outlet Boxes,
Outlet Plates and Etc.)JOB1.00
4bELECTRICAL Power Equip- Panels, Disconnect
Switches, Grounding and Etc.JOB1.00
4cELECTRICAL - Lighting LuminairesJOB1.00
5Comunication Replacement (wiring, conduit,
outlets and Etc.) and Fire AlarmJOB1.00
6Architectual Reconstruction, Insulation & FinishJOB1.00
TOTAL PRICE FOR RESIDENCE-2
BID SCHEDULE-RESIDENCE-3
7Asbestos/Hazzardous RemediationJOB1.00$ -
8Demolition and Disposal (Architectural, Plumbing
and Electrical)JOB1.00$ -
9Plumbing Replacement (Domestic Water,
Insulation, Valves, Sanitary Sewer and Etc.)JOB1.00
10ELECTRICAL - (Wiring, Conduit, Outlet Boxes,
Outlet Plates and Etc.)JOB1.00
11ELECTRICAL Power Equip- Panels, Disconnect
Switches, Grounding and Etc.JOB1.00
12ELECTRICAL - Lighting LuminairesJOB1.00
13Comunication Replacement (wiring, conduit,
outlets and Etc.) and Fire AlarmJOB1.00
14Architectual Reconstruction, Insulation & FinishJOB1.00
Indirect Cost Item Description
15Insurance, Payment & Performance bonds
16Mobilization & Demobilization%
17Overhead Cost%
18Profit%
$TOTAL PRICE FOR RESIDENCE-3