Attach 3 - Photos for Hirsch System Project.pdf
PDF 7 MB Posted
- Attached to
- Hirsch Security System Upgrade
- Solicitation number
- FA4814TF077
About this file
This document package includes photos and diagrams related to an upcoming federal contract solicitation for upgrading an existing Hirsch security system. The incumbent contractor will integrate a new full backend system and replace end-of-life controllers and access points at the Department of the Air Force Air Mobility Command facility. Specifically, the contractor will install new Hirsch access points and controllers in the auditorium, administration area, kitchen, communications closets, and other locations shown in the diagrams. The existing Hirsch system utilizes primary and secondary controllers, time zones, and door groups that will need to be integrated into the new backend system layout. The solicitation number is FA4814TF077 for the Hirsch Security System Upgrade opportunity with the Department of the Air Force Air Mobility Command. Responses are due by April 27, 2023.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DCC Hirsch Security System Upgrade Project
Add Additional Access Points & Upgrade End-of-life Controller 104/27/2023
First Floor Hirsch
Existing Hirsch Access PointTampa
Room
Auditorium
Corona Room
DV
Area Admin
Area
New Hirsch Access Point
Second Floor
2nd Floor Comm Closet
Auditorium Balcony
Existing Hirsch Access Point
New Hirsch
Point
Hirsch System
Existing Hirsch System
Corona Room
Admin Area
New Hirsch System
Existing
Laptop
Existing System
Primary
Secondary
Unit to Integrate
New
Full Backend System Layout
New
Secondary
Primary
Controller #1
SNIB3
Controller #2
SNIB3
Controller #3
Onboard
Controller #3 and Commercial Ports
APPROX 6 FEET
Screen Shot Time Zones
Screen Shot Existing Controllers Names
Screen Shot Existing Doors
Screen Shot Existing Doors
Screen Shot Door Groups
Auditorium Exterior Access
Point
Auditorium
New Hirsch Access Point
Approximate Distance to Main
Controller System is 300ft
Auditorium Emergency Exit
Interior Admin Area Access Point
Admin Area New Hirsch Access Point
Approximate Distance to Main
System is 90ft
Admin Area
Kitchen Exterior Access Point
Kitchen
New Hirsch Access Point
Approximate Distance to Main
System is 168ft
Kitchen
Interior DV Communication Closet Access Point
DV
Comm Closet
New Hirsch Access Point
Approximate Distance to Main
System is 174ft
DV Communication Closet
New Hirsch
Point
2nd Floor Comm Closet
Main Comm Closet Approximate
Main Com Closet Distance to Main Controller
System is 182ft
Approximate 2nd Floor Com
Closet Distance to Main
Controller System is 232ft
Interior Main Communication Closet
(Inner & Outer) and
2nd Floor Communication Closet (Inner & Outer)
Main Communication Closet Outer
Main Communication Closet Inner
2nd Floor Communication Closet Outer
2nd Floor Communication Closet Inner
Conference Center
Celebrating 20 years of service to the
Department of Defense
Thank you for partnering with us!
| DCC Hirsch Security System �Upgrade Project |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Existing System |
| Unit to Integrate |
| Full Backend System Layout |
| Controller #1 |
| Controller #2 |
| Controller #3 |
| Controller #3 and Commercial Ports |
| Screen Shot Time Zones |
| Screen Shot Existing Controllers Names |
| Screen Shot Existing Doors |
| Screen Shot Existing Doors |
| Screen Shot Door Groups |
| Slide Number 17 |
| Auditorium Emergency Exit |
| Slide Number 19 |
| Admin Area |
| Slide Number 21 |
| Kitchen |
| Slide Number 23 |
| DV Communication Closet |
| Slide Number 25 |
| Main Communication Closet Outer |
| Main Communication Closet Inner |
| 2nd Floor Communication Closet Outer |
| 2nd Floor Communication Closet Inner |
| Slide Number 30 |
File details come from the government source that posted it. Updated .