| Schedule of Supplies and Services | Attachment (1) |
| Solicitation No.: 70Z08522QLREP0001 |
USCGC STONE (WMSL 758) Dockside FY23 FYQ3
| Provide all labor, materials, and equipment, except as specified, to perform the services identified in Attachment (2) REV-0, dated 20 September 2022. | ||||
| CLIN 0001 - DEFINITE WORK ITEMS | ||||
| These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item. | ||||
| Work Item | Description | QTY | Unit | Amount |
| D-001 | Tanks (Potable Water), Clean and Inspect | 1 | JOB | $0.00 |
| D-002 | Fire Detection System, Inspect and Test | 1 | JOB | $0.00 |
| D-003 | Dual Point Davit ,Biennial Maintenance, Perform | 1 | JOB | $0.00 |
| D-004 | Folding Boom Cranes, Biennial Maintenance, Perform | 1 | JOB | $0.00 |
| D-005 | Stern Boat Launch and Recovery, Level II | 1 | JOB | $0.00 |
| D-006 | Talon Grid, Inspect and Test | 1 | JOB | $0.00 |
| D-007 | Ventilation Ducting, Clean and Inspect | 1 | JOB | $0.00 |
| D-008 | Fan Coil Assembly Drain Piping, Modify | 1 | JOB | $0.00 |
| D-009 | Chilled Water System Insulation, Renew | 1 | JOB | $0.00 |
| D-010 | Ventilation Duct Insulation, Renew | 1 | JOB | $0.00 |
| D-011 | Low Pressure Air Compressor, Replace | 1 | JOB | $0.00 |
| D-012 | Deck Covering (Polymeric), Seal | 1 | JOB | $0.00 |
| D-013 | BERP and QAWTD 01-57-2, Install | 1 | JOB | $0.00 |
| D-014 | Auxiliary Seawater Piping, Modify | 1 | JOB | $0.00 |
| D-015 | Cofferdam, Install | 1 | JOB | $0.00 |
| D-016 | Temporary Services, Dockside, Home Pier | 1 | JOB | $0.00 |
| D-017 | Dry Provision Storeroom, Modify | 1 | JOB | $0.00 |
| D-018 | Cargo Handling Elevator, Annual Inspection and Test, Perform | 1 | JOB | $0.00 |
| D-020 | Fire Prevention, Provide | 1 | JOB | $0.00 |
| $0.00 |
| CLIN 0002 - OPTIONAL WORK ITEMS | |||||
| Optional items listed below will be awarded if inspection reports reveal the necessity for activation. Evaluation of the options shall not obligate the Government to exercise the option. | |||||
| Work Item | Description | QTY | Unit | Amount | |
| O-019 | Tanks (Potable Water), Preserve (Partial) - OPTIONAL | 1 | JOB | $0.00 | |
| $0.00 | $0.00 |
| COMPOSITE LABOR HOUR RATE (CLHR) | |||
| Labor Rate Per Hour | Estimated Hours** | Total | |
| 3,221 | $0.00 | $0.00 |
| Mark-Up/Loading Rate (MULR) for Materials and Subcontractors | |||
| Mark-up Percentage (%) | Estimated Unit Price** | Total | |
| $100,000.00 | $0.00 | $0.00 | |
| **NOTE: The estimated hours/unit price and extended amount indicated above are for evaluation of offers only. The CLHR and MULR provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required. |