Attach 01 SOW Parking Lot Brookings SD .pdf
PDF 413 KB Posted
- Attached to
- Parking Lot Replacement, Brookings SD Federal contract opportunity
- Solicitation number
- 12805B21Q0399
About this file
This statement of work and related solicitation describe a parking lot replacement project for the USDA Agricultural Research Service in Brookings, South Dakota. The contractor will remove the existing 5,002 square yard asphalt parking lot and install a new minimum 4-inch thick asphalt surface sloped to drain away from Building 001, along with chip sealing and 1,332 linear feet of striping. The mandatory site visit will take place on July 27, 2021, with registration required by July 26. Offers are due within 45 days of award with a price range of $100,000 to $250,000. The small business set-aside solicitation is posted on beta.SAM.gov and questions must reference the solicitation number and be directed to the points of contact listed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12805B21Q0399 Amendment 0001 SF30.pdf | ||
| Attach 01 SOW Parking Lot Brookings SD Amend 0001 .pdf | ||
| Attach 05 Fill In Biobased Statement Letter.docx | DOCX document | |
| Attach 02 SD20210001 Wage Decision.pdf | ||
| Attach 04 ARS-372 Contractors Request for Payment.pdf | ||
| 12805B21Q0399 Parking Lot Solicitation.pdf | ||
| Attach 03 ARS-371 Const Progress Payment Schedule.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Lot Replacement Brookings, SD
STATEMENT OF WORK
USDA Agricultural Research Service
Project Title: Parking Lot Replacement, Brookings SD
1. Government Points of Contact
a) Administrative Contracting Officer (ACO):
Toinette Aranda 970-492-7016 toinette.aranda@usda.gov
b) Occupational Health and Safety Representative:
Shenna Henk 970-492-7033 shenna.henk@usda.gov
Dwayne Cordray dwayne.cordray@usda.gov
c) Engineer Project Manager (EPM)/Contracting Officer’s Representative (COR):
Mark McWilliams
(970) 631-7513 mark.mcwilliams@ars.usda.gov
d) Location Monitor (LM):
Craig McCuin 605-693-5203 craig.mccuin@usda.gov
2. Location: The site of work is the US Agricultural Research Service location, Brookings, SD.
3. Site Visit: A site visit and inspection tour is required. Vendor will be notified of the exact time and date to attend the site visit.
4. Scope of Service: The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.
a) The Contractor shall provide services for the following tasks marked by an “X”.
[X] Provide a technical and cost proposal to complete the project as per project requirements.
[X] Provide and install all material to complete the project as per project requirements.
mailto:toinette.aranda@usda.gov mailto:shenna.henk@usda.gov mailto:dwayne.cordray@usda.gov mailto:mark.mcwilliams@ars.usda.gov mailto:craig.mccuin@usda.gov
5. Project Requirements: Contractor shall furnish a technical and cost proposal to remove existing parking lot as identified in the following section #6 of this SOW. The contractor’s proposal shall include unit priced breakdown of labor and materials (including subcontracted efforts) demonstrating wage rates, material, and equipment costs. The contractor shall provide a turn-key product including proper installation of all material and equipment per manufacturer’s recommendations.
a) The contractor shall work with the site personnel to ensure project is accomplished in a timely manner.
b) Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000.
Employee payroll logs for the project will be required to verify application of accurate wage rates.
6. Description of Work:
Parking Lot Removal:
a. Contractor shall remove existing asphalt parking lot covering approximately 5,002 square yards (See Figure 1 and Figure 2). Supply proper packaging, transport, and disposal. Dispose of waste at the proper landfill facilities or reclamation facilities.
Parking Lot Install:
b. Contactor shall develop and submit for review and approval, a sloping and drainage plan for ARS review. Plan shall include curb and gutter, shaping, and other relevant components for directional water flow. Proposed plan shall include drainage to the north, away from the north or east, away from Building 001.
c. Install asphalt parking lot. Install new, a minimum 4 inch thick asphalt parking lot surface in accordance with sloping and drainage plan. Surface course asphalt meeting the pavement overlay mixture as the state of South Dakota mix design. Slope of parking lot will be to the north away from Building 001 to prevent water and ice from forming in front of the main entrance of Building 001.
d. Install chip sealant on new asphalt surfaces. Chip seal shall include all prep work, cleaning, sealing, installing, and sweeping of excess chips.
e. Striping. Add approximately 1,332 linear feet of striping.
f. Contractor shall present functional operation upon completion of the project.
Figure 1
Figure 2
7. References & Standards: All construction shall comply with ARS Facilities Design Standards (ARS Manual 242.1, 5-01-12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15-134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.
8. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
9. Existing Installations/Demolition:
a) Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in-progress research.
b) The Owner reserves the right to retain any equipment or materials removed as part of this scope of work. The Contractor shall coordinate any equipment or materials to be retained with the Owner prior to starting demolition operations. The Contractor shall legally dispose all equipment or material removed that will not be retained.
c) The contractor shall divert project waste to recycle where practical. The Contractor shall track and document the amount of waste diverted to recycle. The contractor shall submit diversion documentation as part of closeout. If no waste is diverted to recycle, the contractor shall submit a letter stating so and why diversion was not practical.
10. Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
11. Temporary Facilities:
a) Temporary utilities (water and electricity) may be furnished to the Contractor by the
Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.
b) Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need
12. Site Cleanup: The construction site shall be kept clean and free of debris at all times.
Restore areas disturbed as nearly as possible to the original appearance and condition.
Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
13. Submittals:
a) For all proposed material, contractor shall provide concrete mix design, relevant illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, or catalog data.
b) The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.
c) Submittals are required for all building materials and equipment and shall be provided to the CO and COR for review and approval.
d) Contractor is responsible for any costs incurred for equipment ordered without prior approval.
14. Final Inspection:
a) The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time.
COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.
15. Warranty:
a) In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
16. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
17. Latent Defects:
a) The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.
18. Acceptance:
a) Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and accepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor
END