Att_7_-_Assessment_Plan.pdf
PDF 187 KB Posted
- Solicitation number
- 0000038908
- Issued by
- California
About this file
This Assessment Plan document outlines the evaluation methodology for RFO 25-1024, a request for proposal issued by California Energy Safety for technical consultant services to modernize the Bay Conservation and Development Commission's (BCDC) regionwide permit program and study programmatic approaches for habitat restoration and multi-benefit shoreline protection projects. The evaluation process consists of three phases: Phase 1 Administrative Assessment, which reviews offers for compliance with mandatory RFO requirements such as timeliness, completeness, and submission of required documentation; Phase 2 Technical Assessment, which evaluates the quality and approach of proposed solutions; and Phase 3 Cost Assessment, which analyzes pricing competitiveness. The solicitation requires respondents to propose four consultant positions: Project Manager, Business Solutions Analyst, User Experience/Interaction Designer, and Senior Software Engineer. All consultant staff must meet minimum qualifications outlined in the TDDC MSA, and respondents must submit three reference forms for each proposed consultant demonstrating relevant experience within the past five years.
The evaluation framework allocates 350 technical points maximum, 200 cost points maximum, and up to 120 interview points, for a combined total of 550 points without interviews or 670 points if interviews are conducted. Technical scoring includes pass/fail assessments for mandatory qualifications and consultant references, with 50 points each allocated for desirable qualifications per consultant position and 50 points each for three sections of the Understanding and Approach narrative response; respondents must achieve a minimum of 75 points in the Understanding and Approach section to be considered responsive. Cost assessment awards maximum points to the lowest Combined Total Cost (calculated for two-year base plus optional contract years) with proportionally lower scores applied to higher-cost proposals using a percentage-based formula. The award will be made to the responsible, responsive respondent achieving the highest combined total score across all assessment phases. All required attachments, including the Agreement, Cost Worksheet, Consultant Experience Worksheets and Resumes, Consultant Reference Forms, Understanding and Approach narrative, and various compliance certifications, must be submitted to avoid rejection for non-responsiveness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_SFBC-P-25-15_Modernize_Regionwide_Permits.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFO 25-1024
Attachment 7
ATTACHMENT 7
ASSESSMENT PLAN
1. INTRODUCTION
A multiple phase process will be used to review and rate offers. Offers that do not comply with the mandatory components stipulated in this RFO may be deemed non-responsive and the Respondent disqualified. Energy Safety may reject any offer found to be non-responsive at any stage of the review. Energy Safety reserves the right to modify or cancel this procurement in its entirety or in part at any time.
The Respondent is required to thoroughly review the RFO to ensure that its offer is fully compliant with the RFO requirements and thereby avoid the possibility of being ruled non-responsive. If Energy Safety finds that an offer has a material deviation from a specified requirement, the Respondent’s offer may be deemed non-responsive.
2. PHASE 1 – ADMINISTRATIVE ASSESSMENT
Shortly after the submission deadline, the State will conduct an administrative review of each offer for initial responsiveness to the RFO requirements (e.g., timeliness, completeness) to determine that Administrative Assessment requirements have been met.
If deemed necessary, Energy Safety may collect additional documentation (e.g., missing forms, missing appendix items, missing data from RFO forms, etc.) to verify responsiveness to the RFO Phase 1 – Administrative Assessment requirements.
Table 1: Administrative Assessment Summary
PHASE 1 – ADMINISTRATIVE ASSESSMENT SCORING
Table of Contents Pass/Fail Agreement Cover Letter Pass/Fail Respondent’s TDDC MSA with highlighted pricing list Pass/Fail Cost Worksheet Pass/Fail Narrative Response Pass/Fail Consultant Experience Worksheet and Resumes (MQs Pass/Fail; 50 points/DQ) 200 Points
Consultant Reference Form (Three for each proposed consultant) Pass/Fail Understanding and Approach 150 Points Bidder Declaration Form GSPD-05-105 Pass/Fail California Civil Rights Law Certification Pass/Fail List of Ineligible Businesses Compliance Pass/Fail
3. PHASE 2 - TECHNICAL ASSESSMENT/SCORING
Offers that meet Phase 1 – Administrative Assessment requirements and contain the required documentation will be submitted to the Energy Safety Assessment Team for Phase 2 – Technical Assessment.
Reviewers will assign a Pass/Fail, a numeric score, or a ranking to each offer based on its adequacy, thoroughness, and the degree to which the offered solution best meets Energy Safety’s needs and represents the best value to Energy Safety.
The Energy Safety Assessment Team will use the following scoring system to assign points. Following this table is a list of the considerations that reviewers may consider when assigning points to a response.
Table 2: Technical Assessment Summary
PHASE 2 – TECHNICAL ASSESSMENT MAXIMUM
SCORE
Applicable TDDC MSA Mandatory Qualifications Pass/Fail Consultant Mandatory Qualifications Pass/Fail Consultant References (Three for each proposed consultant) Pass/Fail Consultant Desirable Qualifications (Project Manager) 50 Points Consultant Desirable Qualifications (Business Solutions Analyst) 50 Points Consultant Desirable Qualifications (User Experience/Interaction Designer)
50 Points
Consultant Desirable Qualifications (Senior Software Engineer) 50 Points Understanding and Approach*
Section 1 (50 points) 50 Points Section 2 (50 points) 50 Points Section 3 (50 points) 50 Points
Total Possible Technical Points 350
*Respondent’s must score a minimum of 75 points in Phase 2 – Technical Assessment, Understanding and Approach to be considered responsive.
Table 3: Cost Assessment
PHASE 3 – COST ASSESSMENT MAXIMUM
SCORE
Cost Worksheet 200 Total Possible Cost Points 200
Table 4: Interview Assessment
INTERVIEW ASSESSMENT (if held) MAXIMUM
SCORE
Interviews 120 Total Possible Interview Points 120
Table 5: Total Scores
COMBINED TOTALS MAXIMUM SCORE
Total Possible Technical Points 350
Total Possible Cost Points 200 Total Possible Combined Points (no interviews) 550
Total Possible Interview Points 120 Total Possible Combined Points including interviews 670
In assigning points, the Energy Safety Assessment Team may consider issues including, but not limited to, the extent to which one offer, compared to another offer:
1. Lacks information, depth, or breadth, or lacks significant facts and/or details, and/or
2. Contains weaknesses, defects or deficiencies, and/or
3. Demonstrates a complete understanding of Energy Safety’s needs and the services sought, and/or
4. Adequately illustrates the Respondent’s capability to perform all services and meet all
Statement of Work and performance requirements, and/or
5. Will contribute to the achievement of the Energy Safety’s goals and objectives if implemented, and/or
6. Demonstrates the Respondent’s capacity and/or commitment to exceed regular service needs (e.g., offers enhanced or advanced features, approaches, or methods;
offers creative or innovative business solutions).
4. ADMINISTRATIVE ASSESSMENT
The Administrative Assessment Summary (Table 1) will be scored based on the responsiveness to the requirements listed. Requirements will be given either a “Pass” (e.g., complied with requirement, completed and returned document) or “Fail” (e.g., did not comply with requirement, did not complete or return document). If a Respondent receives a Fail for any of these requirements, the Offer may be rejected.
5. TECHNICAL ASSESSMENT
The technical requirements (Table 2: Technical Assessment Summary) will be scored with a combination of Pass or Fail and points.
6. CONSULTANT EXPERIENCE WORKSHEET AND RESUME
The following describes the assessment and scoring of consultant qualifications. All Contractor staff proposed must meet the minimum experience and education requirements for the classification in the Respondents TDDC MSA.
Refer to Attachment 4.1, 4.2, 4.3, and 4.4 – Consultant Experience Worksheet and Resume for the Minimum Qualifications criteria (Pass/Fail) and Desirable Qualifications (50 points each). Resumes must be attached.
A. CONSULTANT MINIMUM QUALIFICATIONS
The Respondent’s proposed consultants must meet the Minimum Qualifications as outlined in Attachment 4.1 - 4.4 – Consultant Experience Worksheet and Resume.
The Energy Safety Assessment Team will assess consultant experience to determine if the Consultant meets the mandatory qualifications on a pass/fail basis.
B. CONSULTANT DESIRABLE QUALIFICATIONS
Refer to Table 2: Technical Assessment Summary for the maximum points allocated for Desirable Qualifications (DQ). Submission of DQs is optional and at the discretion of the Respondent and are not considered in Administrative Assessment Summary for submission compliance. During the Technical Assessment, points will be awarded based on the Consultant’s ability to meet the Optional DQs.
If Energy Safety is unable to validate that the information supplied qualifies for any desirable scored experience points, no points will be awarded for such experience. If the State is able to validate that the consultant meets the DQs, the Respondent will earn the points designated for that qualification.
7. CONSULTANT REFERENCE FORM
The purpose of the consultant reference requirement is to provide Energy Safety with the ability to assess the Consultant’s experience in providing similar or relevant services to other organizations through a satisfaction rating provided by the consultant’s previous clients. The description of consultant experiences similar to the needs identified in the scope of work must be detailed and comprehensive enough to permit the Energy Safety to assess the similarity of previous work to the work anticipated for the Contract resulting from this RFO. References must be externally independent from the proposed consultant and the Respondent’s organization and corporate structure.
The Consultant’s reference contact should be someone who performed a management or supervisory role on the referenced project and must be willing and able (e.g., familiar with what transpired, not bound by confidentiality, etc.) to answer questions which validate the information on the submitted form.
Three Attachment 5 - Consultant Reference Forms must be completed for each proposed consultant from clients (References) that the Consultant has provided timely and effective services or deliverables working on projects that represent work similar in nature to the services requested in this RFO and are within the last five years of the offer due date for this RFO.
Consultant references will be scored on a pass/fail basis, based upon the ratings provided by the Reference(s). Any conflicting information may result in the response being deemed non-responsive. Any Attachment 5 – Consultant Reference Form that has a reference rating score of “Unsatisfactory" and/or "Marginal" will be deemed non-responsive.
8. UNDERSTANDING AND APPROACH
Respondents must provide a narrative response to prompts 1 through 3, Attachment 6 – Understanding and Approach.
In preparing the response to Attachment 6, do not simply restate or paraphrase information in this RFO and Exhibit A, Statement of Work. Respondents must describe or demonstrate, in the Respondent’s own words, the information required and provide examples from the Respondent’s and/or Consultant’s previous project experience.
Please refer to Table 2: Technical Assessment Summary above and Attachment 6 – Understanding and Approach for details on how points may be achieved. Energy Safety’s Assessment Team will evaluate the Respondent’s Understanding and Approach as follows:
Table 6: Understanding and Approach Scoring Criteria
Points per Prompt Criteria
50 Exceptional
Exceeds expectations with comprehensive, specific, and relevant experience and provides explanation and examples of work performed in a manner easily evaluated. Information provided is detailed and directly applicable to the work described in Exhibit A, Statement of Work. Examples provided document Consultant’s experience. Response documents Consultants dedication and successful outcomes.
40 Strong Meets all expectations with good detail. Information provided is detailed and applicable. Provides explanation and examples of Consultant’s proficiency.
30 Adequate Meets basic expectations with moderate detail. Explains and provides examples but lacks direct relevance.
20 Limited Partially meets expectations, vague or lacking detail. Little explanation and examples are presented which may or may not be relevant.
10 Poor Minimally addresses criterion, lacks relevance.
0 Non- Responsive Not addressed at all.
9. INTERVIEW (If held)
Energy Safety may choose to interview up to the top two highest ranking Respondents.
Additional Respondents may be interviewed depending on the total number of responses received, at the discretion of Energy Safety. Energy Safety may, at its sole discretion, choose not to conduct interviews. Interviews, if held, may be in-person, or via telephone, via teleconference, etc. The purpose of the interview, if held, is to confirm or assess the following:
1. The Respondent’s understanding of Energy Safety’ needs and the project importance.
2. The Respondent’s commitment to provide timely and effective services.
3. The capabilities and strengths of the Respondent’s management team and the
Consultant.
4. The soundness and strengths of the Respondent’s approach to accomplish the objectives and manage the project to ensure successful completion of all Statement of Work requirements.
5. Consultant’s capabilities and understanding of the work as identified in Exhibit A, Statement of Work.
If Energy Safety chooses to conduct interviews, the length of each interview must not exceed one hour, and the same questions will be asked of each interviewee. In addition to the Respondent’s official authorized representative(s), Energy Safety requires the presence of the proposed Consultant to attend the interview. As applicable, Energy Safety will communicate the specific interview requirement information to the affected Respondents via mail, e-mail, or telephone prior to the scheduled interview, only to those Respondents chosen for an interview.
Table 7: Interview
Points Criteria
120 Exceptional
Exceeds expectations with comprehensive, specific, and relevant experience and provides explanation and examples of work performed in a manner easily evaluated. The information provided is detailed and directly applicable to the work described in Exhibit A, Statement of Work. Examples provided document Consultant’s experience. Response documents Consultants dedication and successful outcomes.
90 Strong Meets all expectations with good detail. The information provided is detailed and applicable. Provides explanation and examples of Consultant’s proficiency.
60 Adequate Meets basic expectations with moderate detail. Explains and provides examples but lacks direct relevance.
30 Limited Partially meets expectations, vague or lacking detail. Little explanation and examples are presented which may or may not be relevant.
0 Poor Does not meet expectations, does not provide detail or examples or fails to address question asked.
10. PHASE 3 – COST ASSESSMENT
Energy Safety will review and score Attachment 2 - Cost Worksheet to verify that it is complete and includes the hourly rates the Respondent's proposed Consultant. The hourly rate must be equal or less than the hourly rate for the classification on Respondents TDDC MSA. If the Respondent's Attachment 2 - Cost Worksheet is incomplete or does not conform to the requirements and format outlined in the RFO, the Respondent may be deemed non-responsive and its offer rejected.
Energy Safety will perform the following steps to complete the Cost Assessment:
1. List the Total Base Cost for each Respondent (Total for two years)
2. Arrive at the Combined Total Cost (Base + Optional Contract Years).
3. Calculate each Respondent's percentage by dividing the lowest Combined Total Cost by the Respondent's Combined Total Cost.
4. Multiply the percentage calculated with the maximum cost points to determine the points score.
The lowest Combined Total Cost will receive the maximum Cost Assessment points. All other Respondents will receive a proportionally lower score. The following table is an example of how points are awarded for the Cost Assessment.
https://sb.cityinnovate.com/account/solicitations/documents/54146 https://sb.cityinnovate.com/account/solicitations/documents/54146
Table 8: Cost Assessment Validation Table (example only)
11. RESPONDENT’S TOTAL RESPONSE SCORE
The highest scoring response will be the responsible, responsive Respondent that has the highest combined score. See below for Sample Point Summary.
Table 9: Sample Point Summary
Respondent Administrative Assessment
Technical Assessment
Interview Assessment
Cost Assessment Total Score
A PASS 350 120 180 650
B PASS 200 100 200 500
Award, if made, will be to the Respondent who meets all requirements of the RFO, Phase 1 Administrative Assessment and achieves the highest Total Score which includes points from Phase 2 – Technical Assessment and Phase 3 – Cost Assessment.
12. CHECKLIST
A complete offer package will consist of the required documents identified below.
Complete this checklist to confirm the items in your offer. All required attachments must be returned to be deemed responsive. This checklist is provided for Respondent use only and need not be submitted with the final offer.
Table 10: Checklist Attachment X Name/Description
Table of Contents Agreement Cover Letter Respondents TDDC MSA with highlighted pricing list
Attachment 2 Cost Worksheet Attachment 3 Narrative Response
Attachment 4.1 Consultant Experience Worksheet and Resume (Project Manager)
Attachment 4.2 Consultant Experience Worksheet and Resume (Business Solutions Analyst)
Attachment 4.3 Consultant Experience Worksheet and Resume (User Experience/Interaction Designer)
Attachment 4.4 Consultant Experience Worksheet and Resume (Senior Software Engineer)
Attachment 5 Consultant Reference Form Attachment 6 Understanding and Approach
Link Bidder Declaration Form (GSPD-05-105)
A B C
Respondent’s Name
Combined Total Cost
Lowest Combined Total Cost
Next Lowest Combined Total Cost
Respondent’s Cost Assessment Score
(B * 200 = C)
Response A $1,000,000 $900,000/$1,000,000 = .90 (90%) .9 * 200 = 180
Response B $900,000 $900,000/$900,000 = 1.0 (100%) 1.0 * 200 = 200 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf
Link Disabled Veteran Business Enterprise Declaration Form DGS PD 843 (if applicable)
Link California Civil Rights Laws Attachment Link Iran Contracting Act Verification Form
NOTE: ENERGY SAFETY MAKES NO WARRANTY THAT THE CHECKLIST IS A FULL,
COMPREHENSIVE LISTING OF EVERY REQUIREMENT SPECIFIED IN THE RFO. CHECKING
OFF THE ITEMS ON THE CHECKLIST DOES NOT CONSTITUTE RESPONSIVENESS TO THE
REQUIREMENT(S). THE CHECKLIST IS ONLY A TOOL TO ASSIST RESPONDENTS IN
COMPILING THEIR SUBMISSION. RESPONDENTS ARE ENCOURAGED TO CAREFULLY
READ THE ENTIRE RFO. THE NEED TO VERIFY ALL DOCUMENTATION PRIOR TO THE
SUBMISSION OF A RESPONSE CANNOT BE OVER EMPHASIZED.
http://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf http://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/pd_843.pdf http://www.documents.dgs.ca.gov/dgs/fmc/dgs/ols004.pdf https://www.dgs.ca.gov/-/media/Divisions/PD/PTCS/OPPL/SCM/Iran_Contracting_Act_Verification_Form.pdf
| 1. INTRODUCTION |
| 2. PHASE 1 – ADMINISTRATIVE ASSESSMENT |
| 3. PHASE 2 - TECHNICAL ASSESSMENT/SCORING |
| 4. ADMINISTRATIVE ASSESSMENT |
| 5. TECHNICAL ASSESSMENT |
| 6. CONSULTANT EXPERIENCE WORKSHEET AND RESUME |
| A. CONSULTANT MINIMUM QUALIFICATIONS |
| B. CONSULTANT DESIRABLE QUALIFICATIONS |
| 7. CONSULTANT REFERENCE FORM |
| 8. UNDERSTANDING AND APPROACH |
| 9. INTERVIEW (If held) |
| 10. PHASE 3 – COST ASSESSMENT |
| 11. RESPONDENT’S TOTAL RESPONSE SCORE |
| 12. CHECKLIST |