About this file
This document contains drawings and construction notes for the Munising Work Center Repaving Project, a federal contract opportunity with Solicitation Number 12445524Q0058.
The project involves repaving approximately 11,354 square feet of existing asphalt pavement at the Munising Work Center in the Hiawatha National Forest, Munising Ranger District. Key details include removing and disposing of the existing asphalt, potential excavation and replacement of unsuitable aggregate base material, grading and compacting the aggregate base, and placing 3 inches of new asphalt concrete paving. The work is to be performed in accordance with the provided construction notes and drawings. The contract has a period of performance from July 1st to October 1st, with the work area closed to traffic for up to 21 days. The contractor will be responsible for providing all labor, materials, and supervision to complete the repaving work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12445524Q0058_Amd_0001.pdf | ||
| HOW_TO_FOLLOW_PROJECTS_ON_SAM_FOR_EMAIL_ALERTS.pdf | ||
| Att_05_Wage_Rates_(240426).pdf | ||
| Att_02_SOW_(240411).docx | DOCX document | |
| Att_01_Schedule_of_Items_(240429).docx | DOCX document | |
| Att_03_FS_Supplemental_Specifications_(240401).pdf | ||
| Sol_12445524Q0058.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture
Forest Service
MUNISING WORK CENTER
FROM THE MUNISING DISTRICT OFFICE TURN LEFT ONTO E. MUNISING AVE., AT THE TRAFFIC CIRCLE
TAKE THE 2ND EXIT ONTO CEDAR STREET, TRAVEL 0.2 MILES ALONG CEDAR STREET, CONTINUE
CEDAR STREET FOR 0.2 MILES TO EAST VARNUM STREET, TURN RIGHT ONTO EAST VARNUM STREET, TRAVEL ON VARNUM STREET FOR 250 FEET TO REACH 314 EAST VARNUM STREET MUNISING, MI
49862. COORDINATES:46.40535903 -86.65407589
REPAVING PROJECT
RECOMMENDED BY:
APPROVED:
CIVIL ENGINEERING TECHNICIAN
FACILITIES ENGINEER DATE
DATE
WEST ZONE ENGINEER
DATE
4/1 1/2
4 1 2:
C
AM
ER
ON
ED
W
AR
DS
C
:\U
SE
RS
\C
AM
ER
ON
ED
W
AR
DS
\B
OX
\71
EN
GI
NE
ER
IN
G\ W
ES
T
ZO
NE
\C
AD
D
RA
W
IN
GS
\M
UN
IS
IN
G
W H
BL
AC
KT
OP
\M
UN
IS
IN
G W
H
BL
AC
KT
OP
.D
W G;
MICHIGAN
ALGER COUNTY
(R09) EASTERN REGION
HIAWATHA NATIONAL FOREST
MUNISING RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
1 COVERSHEET 3/27/2024
2 CONSTRUCTION NOTES 3/27/2024
3 PLAN VIEW 3/27/2024
4 DETAIL 3/27/2024
PROJECT LOCATION
MUNISING WORK CENTER REPAVING PROJECT
ITEM NO. DESCRIPTION QUANTITY PAY UNIT REMARKS
15101 MOBILIZATION 1 LS THIS PAY ITEM IS TO COVER THE COST OF MOBILIZING EQUIPMENT TO THE PROJECT LOCATION.
20301 REMOVAL OF EXISTING ASPHALT
CONCRETE, DISPOSAL METHOD (A) 1 LS THIS PAY ITEM IS FOR THE EXISTING ASPHALT CONCRETE PAVEMENT TO BE REMOVED AND HAULED FROM
F.S. LANDS AND DISPOSED LEGALLY.
40301
TYPE II ASPHALT CONCRETE LAID AND
COMPACTED TO THREE INCH TOTAL
DEPTH
11354 SF
THIS PAY ITEM IS FOR THE PLACEMENT OF PAVED ASPHALT. MINOR GRADING, WATERING, AND
COMPACTION OF THE EXISTING AGGREGATE BASE BEFORE PAVING, TO MAINTAIN EXISTING GRADES OF
THE ROADWAY PAVEMENT SURFACE.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 1/2
4 1 2:
C
AM
ER
ON
ED
W
AR
DS
C
:\U
SE
RS
\C
AM
ER
ON
ED
W
AR
DS
\B
OX
\71
EN
GI
NE
ER
IN
G\ W
ES
T
ZO
NE
\C
AD
D
RA
W
IN
GS
\M
UN
IS
IN
G
W H
BL
AC
KT
OP
\M
UN
IS
IN
G W
H
BL
AC
KT
OP
.D
W G;
(R09)
EASTERN REGION
MUNISING WORK
CENTER
REPAVING
PROJECT
HIAWATHA NATIONAL
FOREST
MUNISING DISTRICT
CONSTRUCTION NOTES
03/27/2024
GCG
GCG
DD
02 04
NOTES:
HOURS OF OPERATION : 0800 - 1800 M-F, NO FED HOLIDAYS OR WEEKENDS UNLESS APPROVED BY THE CONTRACTING OFFICER. IN-STREAM WORK WINDOW : JULY 1ST TO
OCTOBER 1ST
THE WORK COVERED BY THESE PLANS SHALL INCLUDE FURNISHING OF MATERIALS, PLACEMENT AND CONSTRUCTION OF: THE PROPOSED CULVERT CROSSING, TRAIL, TEMPORARY TRAFFIC CONTROL, EROSION CONTROL AND SLOPE PROTECTION. ALL WORK FOR CULVERT INSTALLATION SHALL CONFORM TO THE FP-14 STANDARD
SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGE ON FEDERAL HIGHWAY PROJECTS.
THE CONTRACTOR SHALL CONTACT MISS DIG AT 1-800-482-7171 OR 811 A MINIMUM OF THREE WORKING DAYS PRIOR TO ANY EXCAVATION. CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.
THE WORK AREA SHALL BE CLOSED TO TRAFFIC DURING CONSTRUCTION. THE CONTRACTING OFFICER REPRESENTATIVE (COR) SHALL BE NOTIFIED IN WRITING 2 WEEKS PRIOR TO ANY PROPOSED CLOSURE. TOTAL DURATION OF CLOSURE SHALL NOT EXCEED 21 DAYS. A PROJECT SCHEDULED WITH PHASED APPROACH SHALL BE SUBMITTED TO THE COR
30 DAYS PRIOR TO THE PRE-WORK MEETING.
ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO STARTING CONSTRUCTION.
WORK SHALL STOP IMMEDIATELY IF HERITAGE RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED. CONTRACTOR SHALL FURNISH ALL TRAFFIC CONTROL SIGNAGE AND IS
REQUIRED TO MAINTAIN ALL DETOUR AND HAUL ROUTES.
EXCAVATION : QUANTITIES FOR EXCAVATION ARE "IN-PLACE" CUBIC YARDS. EXCESS USABLE AND UNSUITABLE EXCAVATION WILL BE PLACED IN TWO SEPARATE STOCKPILES AND
DISPERSED PROPERLY AT A LOCATION APPROVED OF BY THE COR.
ANY QUANTITIES AND DIMENSIONS SHOWN IN THE PLANS ARE PROVIDED FOR INFORMATION ONLY. CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION. BACKFILL
MATERIAL IS AVAILABLE AT THE SAND STORAGE PIT.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
WAREHOUSE
HOUSE
#603
HOUSE
#601
GARAGE
SHED
SHED
E A
S T V
A R
N U
M S
TR
E
E T
C E
D A
R S
T R
E E
T
SHED
ASPHALT SECTION TO BE
REMOVED AND REPLACED
ASPHALT AREA = 11,354FT²
NOTES:
· EXISTING AC PAVED AREA WILL BE SURVEYED BY FOREST SERVICE TO
MAINTAIN EXISTING LAYOUT FOR FINAL FLOW LINES AND GRADES.
· DEMO EXISTING AC PAVING SHOWN ON DRAWINGS AND DISPOSE OF AC
PAVING LEGALLY OFF FS LANDS.
· IF NECESSARY, EXCAVATE UNSUITABLE AGGREGATE BASE MATERIAL TO A
DEPTH OF 3 INCHES.
· EXCAVATED AGGREGATE BASE WASTE MATERIAL SHALL BE HAULED TO
GOVERNMENT SUPPLIED DISPOSAL SITE. (PAULSON PIT - AU TRAIN, MI
46.406181, -86.858115 14 MILES FROM PROJECT LOCATION)
· IF NECESSARY, PLACE NEW GOVERNMENT PROVIDED AGGREGATE BASE
MATERIAL TO REPLACE EXISTING EXCAVATED UNSUITABLE AGGREGATE
BASE MATERIAL.
· GRADE, WATER AND COMPACT EXISTING OR NEW AGGREGATE BASE
MATERIAL TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF PAVING.
· PLACE NEW PAVING AT A COMPACTED DEPTH OF 3 INCHES FOR PARKING
LOT AREAS AND ACCESS ROADWAYS.
LEGEND
ASHALT PAVEMENT TO
BE REMOVED AND
REPLACED
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 1/2
4 1 2:
C
AM
ER
ON
ED
W
AR
DS
C
:\U
SE
RS
\C
AM
ER
ON
ED
W
AR
DS
\B
OX
\71
EN
GI
NE
ER
IN
G\ W
ES
T
ZO
NE
\C
AD
D
RA
W
IN
GS
\M
UN
IS
IN
G
W H
BL
AC
KT
OP
\M
UN
IS
IN
G W
H
BL
AC
KT
OP
.D
W G;
(R09)
EASTERN REGION
MUNISING WORK
CENTER
REPAVING
PROJECT
HIAWATHA NATIONAL
FOREST
MUNISING DISTRICT
PLAN VIEW
03/27/2024
GCG
GCG
DD
3 4
Feet
0 50 100
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R parking lot / access roadway typical section detail
NOTES:
· DEMO EXISTING ASPHALT PAVING SHOWN ON DRAWINGS. DISPOSE OF
ASPHALT PAVING LEGALLY OFF FS LANDS.
· IF GOVERNMENT DETERMINES EXISTING AGGREGATE BASE MATERIAL IS
UNSUITABLE FOR PLACEMENT OF NEW PAVEMENT, THE GOVERNMENT
WILL PROVIDE SUITABLE AGGREGATE TO SITE.
· IF NECESSARY, EXCAVATE UNSUITABLE AGGREGATE BASE MATERIAL TO A
DEPTH OF 3 INCHES.
· EXCAVATED AGGREGATE BASE WASTE MATERIAL SHALL BE HAULED TO
GOVERMENT SUPPLIED DISPOSAL SITE (PAULSON PIT - AU TRAIN, MI
46.406181, -86.858115 14 MILES FROM PROJECT LOCATION)
· IF NECESSARY, PLACE NEW GOVERNMENT PROVIDED AGGREGATE BASE
MATERIAL TO REPLACE EXISTING EXCAVATED UNSUITABLE AGGREGATE
BASE MATERIAL.
· GRADE, WATER AND COMPACT EXISTING OR NEW AGGREGATE BASE
MATERIAL TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF PAVING.
· PLACE NEW PAVING AT A COMPACTED DEPTH OF 3 INCHES FOR PARKING
LOT AREAS AND ACCESS ROADWAYS.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
4/1 1/2
4 1 2:
C
AM
ER
ON
ED
W
AR
DS
C
:\U
SE
RS
\C
AM
ER
ON
ED
W
AR
DS
\B
OX
\71
EN
GI
NE
ER
IN
G\ W
ES
T
ZO
NE
\C
AD
D
RA
W
IN
GS
\M
UN
IS
IN
G
W H
BL
AC
KT
OP
\M
UN
IS
IN
G W
H
BL
AC
KT
OP
.D
W G;
(R09)
EASTERN REGION
MUNISING WORK
CENTER
REPAVING
PROJECT
HIAWATHA NATIONAL
FOREST
MUNISING DISTRICT
ASPHALT PAVEMENT &
AGGREGATE BASE
DETAILS
03/27/2024
GCG
GCG
DD
04 04
AutoCAD SHX Text
EXISTING NATURAL GROUND SHOULDER AND OR CONCRETE SURFACE
AutoCAD SHX Text
3" COMPACTED, HOT ASPHALT CONCRETE
AutoCAD SHX Text
3" COMPACTED DEPTH OF CRUSHED AGGREGATE
AutoCAD SHX Text
EXISTING NATURAL GROUND SHOULDER AND OR CONCRETE SURFACE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
| Sheets and Views |
| Munising WH Blacktop-COVERSHEET |
| Munising WH Blacktop-2 |
| Munising WH Blacktop-3 |
| Munising WH Blacktop-4 |
File details come from the government source that posted it. Updated .