This document contains drawings and construction notes for the Munising Work Center Repaving Project, a federal contract opportunity with Solicitation Number 12445524Q0058.

The project involves repaving approximately 11,354 square feet of existing asphalt pavement at the Munising Work Center in the Hiawatha National Forest, Munising Ranger District. Key details include removing and disposing of the existing asphalt, potential excavation and replacement of unsuitable aggregate base material, grading and compacting the aggregate base, and placing 3 inches of new asphalt concrete paving. The work is to be performed in accordance with the provided construction notes and drawings. The contract has a period of performance from July 1st to October 1st, with the work area closed to traffic for up to 21 days. The contractor will be responsible for providing all labor, materials, and supervision to complete the repaving work.

View the file

Other files for this federal contract opportunity

Other files attached to HIF Munising Work Center Repaving Project, newest first.
File Type Posted
Sol_12445524Q0058_Amd_0001.pdf PDF
HOW_TO_FOLLOW_PROJECTS_ON_SAM_FOR_EMAIL_ALERTS.pdf PDF
Att_05_Wage_Rates_(240426).pdf PDF
Att_02_SOW_(240411).docx DOCX document
Att_01_Schedule_of_Items_(240429).docx DOCX document
Att_03_FS_Supplemental_Specifications_(240401).pdf PDF
Sol_12445524Q0058.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

MUNISING WORK CENTER

FROM THE MUNISING DISTRICT OFFICE TURN LEFT ONTO E. MUNISING AVE., AT THE TRAFFIC CIRCLE

TAKE THE 2ND EXIT ONTO CEDAR STREET, TRAVEL 0.2 MILES ALONG CEDAR STREET, CONTINUE

CEDAR STREET FOR 0.2 MILES TO EAST VARNUM STREET, TURN RIGHT ONTO EAST VARNUM STREET, TRAVEL ON VARNUM STREET FOR 250 FEET TO REACH 314 EAST VARNUM STREET MUNISING, MI

49862. COORDINATES:46.40535903 -86.65407589

REPAVING PROJECT

RECOMMENDED BY:

APPROVED:

CIVIL ENGINEERING TECHNICIAN

FACILITIES ENGINEER DATE

DATE

WEST ZONE ENGINEER

DATE

4/1 1/2

4 1 2:

C

AM

ER

ON

ED

W

AR

DS

C

:\U

SE

RS

\C

AM

ER

ON

ED

W

AR

DS

\B

OX

\71

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\M

UN

IS

IN

G

W H

BL

AC

KT

OP

\M

UN

IS

IN

G W

H

BL

AC

KT

OP

.D

W G;

MICHIGAN

ALGER COUNTY

(R09) EASTERN REGION

HIAWATHA NATIONAL FOREST

MUNISING RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

1 COVERSHEET 3/27/2024

2 CONSTRUCTION NOTES 3/27/2024

3 PLAN VIEW 3/27/2024

4 DETAIL 3/27/2024

PROJECT LOCATION

MUNISING WORK CENTER REPAVING PROJECT

ITEM NO. DESCRIPTION QUANTITY PAY UNIT REMARKS

15101 MOBILIZATION 1 LS THIS PAY ITEM IS TO COVER THE COST OF MOBILIZING EQUIPMENT TO THE PROJECT LOCATION.

20301 REMOVAL OF EXISTING ASPHALT

CONCRETE, DISPOSAL METHOD (A) 1 LS THIS PAY ITEM IS FOR THE EXISTING ASPHALT CONCRETE PAVEMENT TO BE REMOVED AND HAULED FROM

F.S. LANDS AND DISPOSED LEGALLY.

40301

TYPE II ASPHALT CONCRETE LAID AND

COMPACTED TO THREE INCH TOTAL

DEPTH

11354 SF

THIS PAY ITEM IS FOR THE PLACEMENT OF PAVED ASPHALT. MINOR GRADING, WATERING, AND

COMPACTION OF THE EXISTING AGGREGATE BASE BEFORE PAVING, TO MAINTAIN EXISTING GRADES OF

THE ROADWAY PAVEMENT SURFACE.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 1/2

4 1 2:

C

AM

ER

ON

ED

W

AR

DS

C

:\U

SE

RS

\C

AM

ER

ON

ED

W

AR

DS

\B

OX

\71

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\M

UN

IS

IN

G

W H

BL

AC

KT

OP

\M

UN

IS

IN

G W

H

BL

AC

KT

OP

.D

W G;

(R09)

EASTERN REGION

MUNISING WORK

CENTER

REPAVING

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING DISTRICT

CONSTRUCTION NOTES

03/27/2024

GCG

GCG

DD

02 04

NOTES:

HOURS OF OPERATION : 0800 - 1800 M-F, NO FED HOLIDAYS OR WEEKENDS UNLESS APPROVED BY THE CONTRACTING OFFICER. IN-STREAM WORK WINDOW : JULY 1ST TO

OCTOBER 1ST

THE WORK COVERED BY THESE PLANS SHALL INCLUDE FURNISHING OF MATERIALS, PLACEMENT AND CONSTRUCTION OF: THE PROPOSED CULVERT CROSSING, TRAIL, TEMPORARY TRAFFIC CONTROL, EROSION CONTROL AND SLOPE PROTECTION. ALL WORK FOR CULVERT INSTALLATION SHALL CONFORM TO THE FP-14 STANDARD

SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGE ON FEDERAL HIGHWAY PROJECTS.

THE CONTRACTOR SHALL CONTACT MISS DIG AT 1-800-482-7171 OR 811 A MINIMUM OF THREE WORKING DAYS PRIOR TO ANY EXCAVATION. CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.

THE WORK AREA SHALL BE CLOSED TO TRAFFIC DURING CONSTRUCTION. THE CONTRACTING OFFICER REPRESENTATIVE (COR) SHALL BE NOTIFIED IN WRITING 2 WEEKS PRIOR TO ANY PROPOSED CLOSURE. TOTAL DURATION OF CLOSURE SHALL NOT EXCEED 21 DAYS. A PROJECT SCHEDULED WITH PHASED APPROACH SHALL BE SUBMITTED TO THE COR

30 DAYS PRIOR TO THE PRE-WORK MEETING.

ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO STARTING CONSTRUCTION.

WORK SHALL STOP IMMEDIATELY IF HERITAGE RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED. CONTRACTOR SHALL FURNISH ALL TRAFFIC CONTROL SIGNAGE AND IS

REQUIRED TO MAINTAIN ALL DETOUR AND HAUL ROUTES.

EXCAVATION : QUANTITIES FOR EXCAVATION ARE "IN-PLACE" CUBIC YARDS. EXCESS USABLE AND UNSUITABLE EXCAVATION WILL BE PLACED IN TWO SEPARATE STOCKPILES AND

DISPERSED PROPERLY AT A LOCATION APPROVED OF BY THE COR.

ANY QUANTITIES AND DIMENSIONS SHOWN IN THE PLANS ARE PROVIDED FOR INFORMATION ONLY. CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION. BACKFILL

MATERIAL IS AVAILABLE AT THE SAND STORAGE PIT.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

WAREHOUSE

HOUSE

#603

HOUSE

#601

GARAGE

SHED

SHED

E A

S T V

A R

N U

M S

TR

E

E T

C E

D A

R S

T R

E E

T

SHED

ASPHALT SECTION TO BE

REMOVED AND REPLACED

ASPHALT AREA = 11,354FT²

NOTES:

· EXISTING AC PAVED AREA WILL BE SURVEYED BY FOREST SERVICE TO

MAINTAIN EXISTING LAYOUT FOR FINAL FLOW LINES AND GRADES.

· DEMO EXISTING AC PAVING SHOWN ON DRAWINGS AND DISPOSE OF AC

PAVING LEGALLY OFF FS LANDS.

· IF NECESSARY, EXCAVATE UNSUITABLE AGGREGATE BASE MATERIAL TO A

DEPTH OF 3 INCHES.

· EXCAVATED AGGREGATE BASE WASTE MATERIAL SHALL BE HAULED TO

GOVERNMENT SUPPLIED DISPOSAL SITE. (PAULSON PIT - AU TRAIN, MI

46.406181, -86.858115 14 MILES FROM PROJECT LOCATION)

· IF NECESSARY, PLACE NEW GOVERNMENT PROVIDED AGGREGATE BASE

MATERIAL TO REPLACE EXISTING EXCAVATED UNSUITABLE AGGREGATE

BASE MATERIAL.

· GRADE, WATER AND COMPACT EXISTING OR NEW AGGREGATE BASE

MATERIAL TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF PAVING.

· PLACE NEW PAVING AT A COMPACTED DEPTH OF 3 INCHES FOR PARKING

LOT AREAS AND ACCESS ROADWAYS.

LEGEND

ASHALT PAVEMENT TO

BE REMOVED AND

REPLACED

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 1/2

4 1 2:

C

AM

ER

ON

ED

W

AR

DS

C

:\U

SE

RS

\C

AM

ER

ON

ED

W

AR

DS

\B

OX

\71

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\M

UN

IS

IN

G

W H

BL

AC

KT

OP

\M

UN

IS

IN

G W

H

BL

AC

KT

OP

.D

W G;

(R09)

EASTERN REGION

MUNISING WORK

CENTER

REPAVING

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING DISTRICT

PLAN VIEW

03/27/2024

GCG

GCG

DD

3 4

Feet

0 50 100

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R parking lot / access roadway typical section detail

NOTES:

· DEMO EXISTING ASPHALT PAVING SHOWN ON DRAWINGS. DISPOSE OF

ASPHALT PAVING LEGALLY OFF FS LANDS.

· IF GOVERNMENT DETERMINES EXISTING AGGREGATE BASE MATERIAL IS

UNSUITABLE FOR PLACEMENT OF NEW PAVEMENT, THE GOVERNMENT

WILL PROVIDE SUITABLE AGGREGATE TO SITE.

· IF NECESSARY, EXCAVATE UNSUITABLE AGGREGATE BASE MATERIAL TO A

DEPTH OF 3 INCHES.

· EXCAVATED AGGREGATE BASE WASTE MATERIAL SHALL BE HAULED TO

GOVERMENT SUPPLIED DISPOSAL SITE (PAULSON PIT - AU TRAIN, MI

46.406181, -86.858115 14 MILES FROM PROJECT LOCATION)

· IF NECESSARY, PLACE NEW GOVERNMENT PROVIDED AGGREGATE BASE

MATERIAL TO REPLACE EXISTING EXCAVATED UNSUITABLE AGGREGATE

BASE MATERIAL.

· GRADE, WATER AND COMPACT EXISTING OR NEW AGGREGATE BASE

MATERIAL TO A DEPTH OF 3 INCHES BEFORE PLACEMENT OF PAVING.

· PLACE NEW PAVING AT A COMPACTED DEPTH OF 3 INCHES FOR PARKING

LOT AREAS AND ACCESS ROADWAYS.

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 1/2

4 1 2:

C

AM

ER

ON

ED

W

AR

DS

C

:\U

SE

RS

\C

AM

ER

ON

ED

W

AR

DS

\B

OX

\71

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\M

UN

IS

IN

G

W H

BL

AC

KT

OP

\M

UN

IS

IN

G W

H

BL

AC

KT

OP

.D

W G;

(R09)

EASTERN REGION

MUNISING WORK

CENTER

REPAVING

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING DISTRICT

ASPHALT PAVEMENT &

AGGREGATE BASE

DETAILS

03/27/2024

GCG

GCG

DD

04 04

AutoCAD SHX Text

EXISTING NATURAL GROUND SHOULDER AND OR CONCRETE SURFACE

AutoCAD SHX Text

3" COMPACTED, HOT ASPHALT CONCRETE

AutoCAD SHX Text

3" COMPACTED DEPTH OF CRUSHED AGGREGATE

AutoCAD SHX Text

EXISTING NATURAL GROUND SHOULDER AND OR CONCRETE SURFACE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

Sheets and Views
Munising WH Blacktop-COVERSHEET
Munising WH Blacktop-2
Munising WH Blacktop-3
Munising WH Blacktop-4