Att_01-_Quote_Sheet.pdf
PDF 85 KB Posted
- Attached to
- Sidewalk replacement at Lassen Volcanic National P Federal contract opportunity
- Solicitation number
- 140P8421Q0109
About this file
This solicitation is for sidewalk replacement services at Lassen Volcanic National Park. The contractor will be required to remove and replace segments of existing sidewalks at two locations within the park, including the visitor center area and Loomis area. Work will include mobilization, demolition of existing sidewalks, installation of new compliant sidewalks and an accessible loading zone, and optional items for sidewalk melting cables and an electrical system. The contractor must provide all labor, equipment, materials, testing and permits to complete the work according to specifications. The project range is estimated between $100,000 to $250,000. This is a total small business set-aside for NAICS code 237310 with a size standard of $39.5 million in annual receipts. The solicitation number is 140P8421Q0109 and was issued by the National Park Service Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8421Q0109_Amd_0002.pdf | ||
| Att_07-_Questions_and_Answers_0001.pdf | ||
| Att_06-_Horizontal_Drilling_Specifications_0001.pdf | ||
| Sol_140P8421Q0109_Amd_0001.pdf | ||
| Att_04-_Wage_Determination.pdf | ||
| Sol_140P8421Q0109.pdf | ||
| Att_03-_Drawings.pdf | ||
| Att_02-_Specifications.pdf | ||
| Att_05-_Technical_Information_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P8421Q0109 Att 01- Quote Sheet
SIDEWALK REPLACEMENT AT
LASSEN VOLCANIC NATIONAL PARK
Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable.
On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Options may be exercised in any combination, order, or grouping deemed in the judgement of the Contracting Officer to offer the best value to the Government.
Price award will be made based upon the following equations. The specific equation that is used will be at the Government’s discretion.
Equation 1: Base Price Equation 2: Base Price + Option 1 Equation 3: Base Price + Option 1 + Option 2
Base Price:
Base Price: Remove Replace Visitor Center Sidewalks
Options:
Option 1: Construct Sidewalk Melting Cables Option 2: Sidewalk Melt System Electrical System
140P8421Q0109 Att 01- Quote Sheet
CONTRACT CONTRACT
LINE ITEM LINE ITEM TITLE
NUMBER
(CLIN)
QUANTITY
AND UNIT
OF
MEASURE
UNIT PRICE TOTAL PRICE
BASE PRICE LINE ITEMS
012700
Mobilization& Demobilization 1 LS @$________ @$_________
Site Preparation 1 LS @$________ @$_________
Remove Existing Sidewalk SY @$________ @$_________
Replace KYVC Area Sidewalks SY @$________ @$_________
Replace Loomis Area Sidewalks SY @$________ @$_________
Construct Accessible Loading Zone 1 LS @$________ @$_________
TOTAL BASE PRICE ------------------------------------------------------------------------------- =$___________
OPTION LINE ITEM
Construct Sidewalk Melting Cables 1 LS @$________ =$___________
Construct Sidewalk Electrical System 1 LS @$________ =$___________
TOTAL PRICE FOR BASE PLUS ALL OPTIONS ----------------------------------------------- =$____________
Provide the manufacturer name and model of heating equipment----- __________________________
Quantities for unit price items are estimated, but payment will be made only for actual quantities of work completed up to the Not-To-Exceed quantity.
Award will be made to one Offeror in accordance with the Solicitation.
The low offeror will be determined by taking each offeror’s Base Price, or Base Price with Option(s) at the discretion of the Government.
All measurement and payment information is included in the project specifications Section 01 27 00 Definition of Contract Price Schedule Line Items.
File details come from the government source that posted it. Updated .