This requirements document outlines the need for a modular Ka band wideband amplifier for the National Radar Cross Section Test Facility at White Sands, New Mexico. The Air Force seeks delivery of 6-10 modular amplifiers by December 10, 2021, with each module achieving a minimum output power of 100 watts. Key deliverables include a milestone schedule, technical interchange meetings, acceptance testing documentation such as performance data and drawings, and monthly status reports. Offerors must provide contact information for their contracting and project representatives and be prepared to meet format and timing requirements for deliverables including assembly drawings, a theory of operations manual, and test results. Questions are due by April 9, 2021 and offers should be emailed to the contracting officer by April 23, 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1 FA9101-21-Q-2012_Combined Synopsis Solicitation.pdf | ||
| Atch 01 Rqmt Doc_Ka Band Amps.pdf | ||
| Atch 01 Rqmt Doc_Ka Band Amps.pdf | ||
| 1 FA9101-21-Q-2012_Combined Synopsis Solicitation.pdf | ||
| FA9101-21-Q-2012_QnA.pdf | ||
| Atch 02 FAR DFARS AFFARS Prov and Clauses.pdf | ||
| 1 FA9101-21-Q-2012_Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements Document
FOR
National Radar Cross Section Test Facility (NRTF)
Modular Ka Band Wideband Amplifier
TABLE OF CONTENTS
1. INTRODUCTION
2. PERIOD OF PERFORMANCE
3. PROJECT SCHEDULE
4. TECHNCAL INTERCHANGE AND ACCEPTANCE
5. REQUIRED DOCUMENTS
6. CONTRACTOR CONTACT INFORMATION
1. INTRODUCTION
The US Air Force, National Radar Cross-Section Test Facility (NRTF) at White Sands NM is pursuing a modular design for a wideband, high power, pulsed Ka band amplifier to augment the current Tier III RAMS facility. The Contractor shall meet the minimum requirements stated in this Requirements Document and Appendix 1.0
The design shall be based on integrating and phase cohering 8 (100 W) modules to achieve the desired output. The NRTF will initially procure between 6-10 (100 W) modules which translates to an integrated amplifier of 8 modules with 2 spares.
2. DELIVERY
Delivery of all modules shall occur no later than 10 Dec 21.
3. PROJECT SCHEDULE
The Contractor shall provide a complete milestone schedule that denotes major activities, demonstrations and acceptance testing.
4. TECHNCAL INTERCHANGE AND ACCEPTANCE
The contractor shall conduct the following reviews:
Kick-off/ Technical Interchange Meeting (TIM)
Mid-Term Program Management and Progress Meeting
Acceptance Test (PCA/FCA)
Assembly Drawings
Theory and Operation Manual
These meeting shall be conducted in a format of the Contractor’s choosing and shall cover the overall technical approach, constraints, methods and techniques being examined, performance metrics and results.
5. REQUIRED DOCUMENTS
The Contractor shall provide performance to plan status reports and schedule updates to the AF
Project Manager per the frequency in Table 5-1. All documents are subject to Government acceptance and approval.
Table 5.1 Reporting Requirements
Document Format Frequency
Project Status
Report
MS Word document or email Monthly
Milestone Schedule MS Project, Word, or Excel file
Updated Monthly
PCA Results MS Word 30 Days post milestone
FCA Results MS Word 30 days post milestone
6. CONTRACTOR CONTACT INFORMATION
Upon notice of award, the Contractor shall provide the Contracting Officer and the Government
Project Manager the names and contact information (address, phone number, and email) of a minimum of two (2) Contractor representatives, preferably the contracting agent and project leader.
Any changes in the contact information will immediately be updated by the Contractor as they occur during the duration of this contract and be provided to the Contracting Officer and the
Government Project Manager.
Assembly
Drawings
IGES, DXF, DWG
Compatible
30 days post PCA/FCA
Theory and
Operations Manual
Word or PDF 30 days post PCA/FCA
Frequency 32 GHz to 38 GHz minimum acceptable, 26.5 GHz to 40 GHz desired Rated OP Pulse: 100 W minimum 130 W nominal Gain @ rated output power: 50 dB Prime Power: 120 VAC +/-10%, 50/60 Hz, 1 Phase, or 28VDC via Ext. Power Supply Input/output Impedance: 50 ohms (VSWR 2.0:1) RF I/O Connectors: Female 2.92 mm RF In/ WR28 (UG-599/U Flange, 4-40 Threaded) HP Out Input/output VSWR: 2.0:1 PRF Range: 0 – 100 KHz Duty Cycle: 10% minimum requirement, 20% desired Output Power On/Off ratio > 80 dB TX Bracket (Gating) Pulse Input: BNC Female 50 Ohm TTL Level Rear Panel TX Bracket Pulse to Pulse Jitter: ±5 ns maximum TX Bracket Pulse Width Jitter: ±5 ns maximum Input Pulse to Output Pulse Delay: 500 ns nominal Spurious Output < 50 dBc RF Pulse Rise & Fall Time: 30-50 ns maximum RF Pulse Recovery Time 150 ns (Trailing edge to Leading edge for 2 100 ns pulses within one gate) RF Pulse to Pulse Stability: 0.2 dB maximum RF Pulse to Pulse Phase Noise ± 1° Maximum peak to peak RF Pulse Width 80 ns to 5 µsec RF Pulse Droop <0.5 dB RF Pulse Overshoot ≤ 5% RF Pulse Rise and Fall time ≤20 ns from 10% to 90% point Temperature: 0º to 50º C Non-operating Temp: -20º to 70º C (50,000 feet max) Altitude: 10,000 feet Cooling System: Air cooled, self contained Modulation: AM/FM/Pulse Configuration: 5”H x 8”W x 13”D (2 Hub units side by side) must fit in 19” rack shelf width Options VSWR Protection against any output mismatch; will operate without damage or oscillation against any magnitude and phase of source and load impedance.
Ethernet Remote Control
Configured to obtain rated output power with an input level of 0 dBm or less.
RF Input Connectors type 2.92mm Female on the Rear Panel RF Output type WR28 Waveguide on the Rear Panel Internal Systems Diagnostics with Fault status reporting Remote Ethernet control for: Power On, Power Off, Status, Operate, Standby and Reset. Commands echoed back with status response.
Lead-Time: Less Than 40 weeks Warranty: 1 Year minimum