ARS Reynolds Creek Bldg Repairs - Final CD Drawings_Redacted.pdf
PDF 2 MB Posted
- Solicitation number
- 12905B24R0014
About this file
This document appears to be a pre-solicitation notice for a construction project to install new HVAC systems in two buildings at the Reynolds Creek Experimental Watershed (RCEW) in Murphy, Idaho. The project scope includes removing and replacing the existing HVAC equipment in the Quonset Building and Range Building. The magnitude of this construction project is estimated to be between $250,000 and $500,000. The full Request for Proposal (RFP) will be issued on or around June 4, 2024 and will be a 100% small business set-aside under NAICS code 236220. The resulting contract will be a Firm Fixed Price Construction Contract with a yet-to-be-determined completion timeframe. Interested small businesses will be required to be registered in the System for Award Management.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ARS RCEW FTO Spec Manual_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SUMMARY
THE USDA RESEARCH FACILITY IN MURPHY CONSISTS OF TWO BUILDINGS: THE QUONSET BUILDING (BUILDING 003) CONSTRUCTED IN 1963 AND THE RANGE BUILDING (BUILDING 005) CONSTRUCTED 1969. THE EXISTING MECHANICAL HVAC EQUIPMENT IN BOTH BUILDINGS IS EITHER NON-FUNCTIONAL OR NEAR END OF LIFE. THIS PROJECT WILL REMOVE OLD HVAC AND INSTALL NEW MECHANICAL EQUIPMENT TO PROPERLY VENTILATE AND CONDITION BOTH BUILDINGS.
THE REPLACEMENT EQUIPMENT WILL MEET ALL CURRENT APPLICABLE CODE AND USER REQUIREMENTS.
THE CONTRACTOR SHALL COORDINATE CAREFULLY WITH THE FACILITY TEAM REGARDING THE VARIOUS BUILDING SHUTDOWNS REQUIRED TO COMPLETE THE
PROJECT.
THE ELECTRICAL DRAWINGS DETAIL THE ELECTRICAL-SPECIFIC REQUIREMENTS IN ACCORDANCE WITH THE ABOVE.
ALTERNATES:
• THE BASE BID FOR THIS PROJECT CONTAINS THE WORK ASSOCIATED WITH THE EAST PORTION OF THE RANGE BUILDING (BUILDING 005).
• ALTERNATE 1 IS THE WORK ASSOCIATED WITH THE WEST PORTION OF THE RANGE BUILDING (BUILDING 005)
• ALTERNATE 2 IS THE QUONSET BUILDING (BUILDING 003) SCOPE.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
G-001
COVER SHEET
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
USDA AGRICULTURAL RESEARCH SERVICES
RCEW BUILDING REPAIRS
REYNOLDS CREEK EXPERIMENTAL WATERSHED
IDAHO STATE SITE MAP
20117 UPPER REYNOLDS
CREEK RD. MURPHY, ID 83650
OWYHEE COUNTY
RCEW AGRICULTURAL
RESEARCH SERVICES
SHEET INDEX
SHEET NUMBER SHEET NAME
G-001 COVER SHEET
M-001 LEGENDS AND ABBREVIATIONS
MD-111 QUONSET BUILDING MECHANICAL FLOOR PLAN DEMOLITION
MD-112 RANGE BUILDING MECHANICAL FLOOR PLAN DEMOLITION
M-101 MECHANICAL SITE PLAN
M-102 MECHANICAL ZONE PLANS
M-111 QUONSET BUILDING MECHANICAL FLOOR PLANS
M-112 RANGE BUILDING MECHANICAL FLOOR PLANS
M-401 MECHANICAL SECTIONS
M-501 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
M-701 MECHANICAL CONTROL DIAGRAMS
E-001 LEGENDS, NOTES AND ABBREVIATIONS
E-101 ELECTRICAL SITE PLAN
ED-111 QUONSET BUILDING - ELECTRICAL DEMO PLAN
ED-112 RANGE BUILDING - ELECTRICAL DEMO PLAN
E-111 QUONSET BUILDING - ELECTRICAL FLOOR PLANS
E-112 RANGE BUILDING - ELECTRICAL FLOOR PLANS
E-601 ONE-LINE DIAGRAM
E-701 PANEL SCHEDULES
E-711 EQUIPMENT SCHEDULE
QUONSET BUILDING
RANGE BUILDING
REV DATE DESCRIPTION
2-14-24
RESPONSIBILITY MATRIX
WORK OR EQUIPMENT FURNISH INSTALL
LOW VOLTAGE
LINE POWER
WIRING/TUBE
AHU VFDS EM EM EM EC
AHU DAMPER, ACTUATOR, AND ACTUATOR WIRING EM EM EM EM
GAS PRESSURE REGULATORS MC MC N/A N/A
STARTERS, HOA SWITCHES EC EC N/A EC
MANUAL VALVES MC MC N/A N/A
AUTOMATIC VALVES BAS MC BAS BAS
CURBS AND SEISMIC BRACING MC MC N/A N/A
ABBREVIATIONS:
CONTROLS CONTRACTOR BAS
OWNER OWN
MECHANICAL CONTRACTOR MC
ELECTRICAL CONTRACTOR EC
EQUIPMENT MANUFACTURER EM
NOT APPLICABLE N/A
GENERAL CONTRACTOR GC
DESIGN CONDITIONS
LOCATION MURPHY, ID
CLIMATE ZONE 5B (OWYHEE COUNTY)
OUTDOORS
COOLING 93.8°F DB / 59.9°F WB
HEATING -7.1°F DB
INDOOR
COOLING 72°F
HEATING 68°F
VENTILATION PER ASHRAE 62.1-2019
ELEVATION 3950 FT ABOVE SEA LEVEL
HVAC DUCTWORK LEGEND
DUCTWORK
24x12 S/A
RECTANGULAR DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS OF DUCT. DUCT SIZE
SHOWN DOES NOT INCLUDE INSULATION OR LINING UNLESS NOTED OTHERWISE. SEE
BELOW FOR DUCT SIZE TAG LEGEND.
DUCT SIZE
DUCT SYSTEM ABBREVIATION
(NOT ALWAYS BE SHOWN)
INSULATED DUCT
SOUND LINED DUCT
24x12ø
FLAT OVAL DUCT
SIZE (INCHES) FIRST
DIMENSION IS SIDE OF
DUCT SHOWN
24ø ROUND DUCT
18ø24x12
CHANGE IN DUCT SIZE
AND/OR SHAPE
SUPPLY AIR (SA)
OUTSIDE AIR (OSA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
RETURN AIR (RA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
EXHAUST AIR (EA)
RECTANGULAR DUCT
TURNED UP/SECTION
ROUND/FLAT OVAL DUCT
TURNED UP/SECTION
RECTANGULAR DUCT
TURNED DOWN/AWAY
ROUND/FLAT OVAL DUCT
TURNED DOWN/AWAY
DAMPERS
VOLUME/BALANCING
DAMPER
FIRE DAMPER (FD)
SMOKE DAMPER (SD)
FIRE/SMOKE DAMPER
(FSD)
BACKDRAFT DAMPER
MOTORIZED DAMPER
DUCT SYSTEM ABBREVIATIONS
M
SUPPLY AIRSA
OUTSIDE AIROSA
COMBUSTION AIRCA
RETURN AIRRA
TRANSFER AIRTA
EXHAUST AIREA
FLEXIBLE DUCT
DUCT SYMBOLS
DUCT END CAP
DUCT ACCESS DOOR
AD
SUPPLY AIR (SA)
TERMINAL
RETURN AIR (RA) OR
TRANSFER AIR (TA) TERMINAL
AIR TERMINAL
IDENTIFICATION
EXHAUST AIR (EA) TERMINAL
GRILLE, REGISTER, OR OPEN
DUCT
X
CFM
AIRFLOW DIRECTION
SOUND ATTENUATOR
PLUMBING/PIPING SYMBOLS LEGEND
VALVE
GATE VALVE
BALL VALVE
GLOBE VALVE
PLUG VALVE
BUTTERFLY VALVE
SPECIALTY VALVE
OS & Y VALVE
STOP COCK
PRESSURE REDUCING
VALVE
PRESSURE REGULATING
VALVE
CHECK VALVE
SPRING CHECK VALVE
STRAINER
STRAINER W/
BLOWDOWN
BACKFLOW PREVENTER
BALANCING VALVE
AUTOMATIC BALANCING
VALVE
A
RELIEF VALVE
FUEL ANTI-SIPHON
VALVE
F
FUSIBLE OIL SAFETY
VALVE
MOTORIZED VALVE
NEEDLE VALVE
M M
SOLENOID VALVE
S S
AUTOMATIC CONTROL
VALVE
FLOW SWITCH
PRESSURE SWITCH
FS
PS
PIPE ELBOW DOWN
(OR AWAY)
PIPE ELBOW UP
(OR TOWARDS)
PIPE TEE DOWN
(OR AWAY)
PIPE TEE UP
(OR AWAY)
FLOW DIRECTION
PIPE SLOPE
& DIRECTION
REDUCER, CONCENTRIC
REDUCER, ECCENTRIC
UNION
FLANGES
BLIND FLANGE
END CAP
PT PLUG (TEST PORT)
FLEX CONNECTOR/
COUPLING
EXPANSION JOINT
EXPANSION GUIDE
PIPE ANCHOR
HOSE QUICK
DISCONNECT
HOSE THREAD DRAIN
BALL VALVE
HOSE BIBB
WALL HYDRANT
HOSE THREAD DRAIN
VALVE
FIRE DEPARTMENT
CONNECTION
WATER HAMMER
ARRESTOR
THERMOWELL
THERMOMETER
DIAL THERMOMETER
T
PRESSURE GAUGE
W/ COCK
P
BASKET STRAINER
AIR FILTER W/
COALESCER & DRAIN
AIR FILTER W/
COALESCER, DRAIN,
REGULATOR & GAUGE
PUMP (SYMBOLIC -
ARROW INDICATES
FLOW DIRECTION)
WATER METERM
WATER HAMMER
ARRESTOR (PLAN)
V#
S=2%
PIPING LEGEND
CS
CR
CWS
CWR
CONDENSER
WATER SUPPLY
CONDENSER
WATER RETURN
CHILLED WATER
SUPPLY
CHILLED WATER
RETURN
HWS
HWR
HEATING HOT
WATER SUPPLY
HEATING HOT
WATER RETURN
HGS
HGR
HEATING GLYCOL
SUPPLY
HEATING GLYCOL
RETURN
FOS
FOR
FUEL OIL SUPPLY
FUEL OIL RETURN
SMS
SMR
SNOWMELT
GLYCOL SUPPLY
SNOWMELT
GLYCOL RETURN
RL
REFRIGERANT
LIQUID LINE
RS
REFRIGERANT
SUCTION LINE
HRS
HIGH PRESSURE
REFRIGERANT
SUCTION LINE
GWS
GWR
GEOTHERMAL
WATER SUPPLY
GEOTHERMAL
WATER RETURN
G NATURAL GAS
PG PROPANE GAS
LPG
LIQUID PETROLEUM
GAS
CA COMPRESSED AIR
LPS
LOW PRESSURE
STEAM SUPPLY
LPR
LOW PRESSURE
STEAM RETURN
LPC
LOW PRESSURE
CONDENSATE
MPS
MEDIUM PRESSURE
STEAM SUPPLY
MPR
MEDIUM PRESSURE
STEAM RETURN
MPC
MEDIUM PRESSURE
CONDENSATE
HPS
HIGH PRESSURE
STEAM SUPPLY
HPR
HIGH PRESSURE
STEAM RETURN
HPC
HIGH PRESSURE
CONDENSATE
D
CONDENSATE
DRAIN (D)
VAC VACUUM (VAC)
GENERAL LEGEND
THERMOSTAT. ADJACENT NUMBER
INDICATES TERMINAL UNIT CONTROLLED
HUMIDISTAT
SENSOR
CO2 SENSORCO2
T
H
S
PLUMBING FIXTURE TAG, SEE PLUMBING
SCHEDULES
NOTES:
XX-X
SPECIFIC TO LOCATION(S) INDICATED.
A. NOTE APPLIES TO ENTIRE SHEET.
EXISTING
NEW
(E)
(N)
EXISTING (THIN)
NEW (MEDIUM)
POINT OF CONNECTION (POC)
EXISTING TO BE DEMOLISHED
MECHANICAL EQUIPMENT, SEE MECHANICAL
SCHEDULES.
XX-X
x
SD DUCT SMOKE DETECTOR
SP DUCT STATIC PRESSURE
LINETYPES:
B
A
A
B
DETAIL SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
SECTION SYMBOL:
A = IDENTIFYING NUMBER
B = SHEET WHERE DETAIL IS SHOWN
NEW LOCATION(NL)
RELOCATED(REL)
GENERAL ABBREVIATIONS
ø ROUND or DIAMETER
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD ACCESS DOOR
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AL ACOUSTIC LINED
AP ACCESS PANEL
APD AIR PRESSURE DROP
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AWT AVERAGE WATER TEMPERATURE
BB BASEBOARD
BBD BACKDRAFT DAMPER
BFF BELOW FINISH FLOOR
BHP BRAKE HORSEPOWER
BG BELOW GROUND/GRADE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C CENTIGRADE
CC COOLING COIL
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CI CAST IRON
CLG CEILING
CO CLEANOUT
CMU CONCRETE MASONRY UNIT
CM CONDENSATE METER
CONC CONCRETE
CONN CONNECT or CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION
(D) DEMOLISH
DB DECIBEL or DRY BULB
DDC DIRECT DIGITAL CONTROL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DOAS DEDICATED OUTDOOR AIR SYSTEM
DPR DAMPER
DPS DIFFERENTIAL PRESSURE SWITCH
DWG DRAWING
(E) EXISTING
EA EACH
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
ELEC ELECTRIC or ELECTRICAL
ELEV ELEVATION
EMCS ENERGY MANAGEMENT CONTROL
SYSTEM
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXST EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FD FIRE DAMPER
FFD FUNNEL FLOOR DRAIN
FF FINAL FILTER
FLR FLOOR
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOOR SINK
FSD COMBINATION FIRE/SMOKE DAMPER
FT FOOT/FEET
FTR FINNED TUBE RADIATION
FV FACE VELOCITY
GA GAGE or GAUGE
GAL GALLON
GALV GALVANIZED
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRD GRILLE, REGISTER, OR DIFFUSER
H HEIGHT
HB HOSE BIBB
HD HEAD
HP HORSEPOWER
HRV HEAT RECOVERY VENTILATOR
HTG HEATING
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
HWG HIGH WALL GRILLE
HWR HIGH WALL REGISTER
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCH or INCHES
INSUL INSULATION
INV INVERT
KH KICKSPACE HEATER
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LF LINEAR FOOT/FEET
LVG LEAVING
LWG LOW WALL GRILLE
LWR LOW WALL REGISTER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MAV MANUAL AIR VENT
MBH 1000 BRITISH THERMAL UNITS
PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MCC MOTOR CONTROL CENTER
MFR MANUFACTURER
MOP MAXIMUM OVERCURRENT
PROTECTION
MUA MAKEUP AIR UNIT
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTG MOUNTING
(N) NEW
(NL) NEW LOCATION
N/A NOT APPLICABLE
N/C NORMALLY CLOSED
N/O NORMALLY OPEN
NC NOISE CRITERIA
N.I.C. NOT IN CONTRACT
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
O/C ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
PVC PRESSURE CONTROL VALVE
PD PRESSURE DROP
PH PHASE
PLCS PLACES
POC POINT OF CONNECTION
POUA POINT OF USE ALARM
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH (GAGE)
(REL) RELOCATE/RELOACTED
RA RETURN AIR
RAG RETURN AIR GRILLE
REQD REQUIRED
R.O. ROUGH OPENING
RPBP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DETECTOR
SF SUPPLY FAN
SHT SHEET
SIM SIMILAR
SL SOUNDLINING
SP STATIC PRESSURE
SQ SQUARE
SQ FT SQUARE FOOT/FEET
SS STAINLESS STEEL
STD STANDARD
TAB TESTING, ADJUSTING & BALANCING
THK THICK
TP TRAP PRIMER or TEST PLUG
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
TU TERMINAL UNIT
UBC UNIFORM BUILDING CODE
UFC UNIFORM FIRE CODE
UMC UNIFORM MECHANICAL CODE
UPC UNIFORM PLUMBING CODE
UG UNDERGROUND
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
VA VALVE
VAC VACUUM
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VTR VENT THRU ROOF
W WIDE
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WCO WALL CLEANOUT
WG WATER GAGE
WGE WASTE GAS EVACUATION
WH WALL HYDRANT
WPD WATER PRESSURE DROP
WT WEIGHT
GENERAL NOTES
1. CONTRACTOR SHALL SECURE, MAINTAIN, AND PAY FOR ALL REQUIRED PERMITS, LICENSES, AND INSPECTIONS FOR DURATION OF WORK UNLESS
DIRECTED OTHERWISE.
2. ALL WORK SHALL COMPLY WITH THE OWNER'S REQUIREMENTS, AND WITH ALL APPLICABLE STATE AND LOCAL CODES, OR AUTHORITY HAVING
JURISDICTION.
3. SUBSTITUTIONS OF EQUIPMENT OTHER THAN AS SPECIFIED SHALL BE THE COMPLETE RESPONSIBILITY OF THE CONTRACTOR, ANY ADDITIONAL ELECTRICAL, STRUCTURAL, MECHANICAL, OR ARCHITECTURAL REQUIREMENTS SHALL BE PROVIDED AT NO ADDITIONAL EXPENSE TO THE OWNER.
4. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT TO SHOW ALL REQUIRED OFFSETS. COORDINATE WITH OTHER TRADES AND PROVIDE ALL NECESSARY OFFSETS. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR CONSTRUCTION DETAILS.
5. REFER TO PROJECT MANUAL (SPECIFICATIONS) FOR ADDITIONAL REQUIREMENTS. PLANS AND SPECIFICATIONS SHALL BE TAKEN TOGETHER.
PROVIDE ALL WORK CALLED FOR IN EITHER. IN CASE OF CONFLICT BETWEEN SPECIFICATIONS AND PLANS THE MORE STRINGENT SHALL APPLY.
6. ALL EQUIPMENT AND MATERIAL ON THE JOB SITE PRIOR TO INSTALLATION SHALL BE COVERED AND PROTECTED FROM RAIN, DIRT, DUST, AND
DAMAGE.
7. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN BE MET. COORDINATE FINAL EQUIPMENT LOCATIONS W/ GENERAL CONTRACTOR AND OTHER TRADES TO ALLOW FOR REQUIRED MECHANICAL EQUIPMENT CLEARANCES.
8. PROVIDE AN UNOBSTRUCTED PASSAGEWAY MEASURING NO LESS THAN 36" WIDE BY 80" HIGH FROM DOOR INTO THE SPACE TO SERVICEABLE MECHANICAL EQUIPMENT. A LEVEL WORKING SPACE MEASURING NO LESS THAN 30" WIDE BY 36" DEEP MUST BE PROVIDED IN FRONT OF CONTROL
SIDE OF EQUIPMENT FOR SERVICING.
9. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET
MECHANICAL WORK AS REQUIRED.
10. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF INSTALLATION STANDARDS AND CONSTRUCTION CONDITIONS. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO SHOP FABRICATION AND/OR FIELD INSTALLATION. DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE CONSTRUCTION DRAWINGS SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER.
11. ALL MECHANICAL EQUIPMENT, MATERIALS, AND INSTALLATION SHALL BE PROVIDED BY THE CONTRACTOR. ALL EQUIPMENT SHALL BE COMPLETE, INSTALLED, AND FULLY FUNCTIONAL PRIOR TO FINAL ACCEPTANCE OF THE WORK.
12. INSTALL ALL EQUIPMENT PER MANUFACTURERS RECOMMENDATIONS AND REQUIREMENTS. ANY CONFLICTS BETWEEN THE MANUFACTURERS DOCUMENTATION AND THE CONTRACT DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
13. DO NOT ALLOW ANY WORK TO BE COVERED UP OR ENCLOSED UNTIL INSPECTED, TESTED AND APPROVED BY OWNER'S REPRESENTATIVE OR
AUTHORITY HAVING JURISDICTION.
14. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEATING OR COOLING DURING CONSTRUCTION.
15. PIPES AND WIRING IN PLENUM SHALL BE RATED FOR PLENUM USE. PVC, ABS, AND PLASTIC PIPING IS NOT ACCEPTABLE IN PLENUM APPLICATIONS.
16. ALL DETAILS ARE TYPICAL UNLESS NOTED OTHERWISE.
GENERAL HVAC NOTES
1. SHEET METAL DUCTWORK AND COMPONENTS INCLUDING HANGING, SEALING, PLENUMS, & ACCESSORIES SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS FOR HVAC DUCT CONSTRUCTION, NFPA 90A, & 90B STANDARDS.
2. ALL DUCTWORK OPENINGS SHALL BE COVERED DURING CONSTRUCTION.
3. ALL DAMPERS SHALL BE SET FULLY OPEN PRIOR TO BALANCING.
4. CONTRACTOR TO PROVIDE TRANSITION TO CONNECT TO ALL MECHANICAL EQUIPMENT. PROVIDE FLEXIBLE CONNECTION ON INTAKE AND DISCHARGE
OF ALL MECHANICAL EQUIPMENT.
5. DUCT DIMENSIONS SHOWN ARE INSIDE SHEET METAL DIMENSIONS OR CLEAR OPENING INSIDE LINED DUCT.
6. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT TO SHOW ALL REQUIRED OFFSETS. COORDINATE WITH OTHER TRADES AND
PROVIDE ALL NECESSARY OFFSETS.
7. PROVIDE 1" THICK DUCT LINER IN ALL TRANSFER AIR DUCTWORK UNLESS NOTED OTHERWISE.
8. ALL ELBOWS SHALL BE LONG RADIUS ELBOWS WHEREVER POSSIBLE, OR SHALL HAVE TURNING VANES WHERE INDICATED ON PLANS. NO SQUARE
THROAT OR ZERO RADIUS ELBOWS ALLOWED.
9. ALL DUCT BRANCH CONNECTIONS TO DIFFUSER OR GRILLES, TO OR FROM MAIN DUCTS, SHALL INCLUDE MANUAL VOLUME DAMPERS. ALL SPIN-IN FITTINGS SHALL BE CONICAL, RECTANGULAR BRANCH DUCT TAKEOFFS SHALL HAVE 45° TAKEOFFS.
10. PROVIDE CONCEALED DAMPER REGULATORS OR ACCESS DOORS FOR ALL MANUAL VOLUME DAMPERS LOCATED THAT ARE INACCESSIBLE. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES. ALL FINAL ACCESS DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO
INSTALLATION.
11. 24"x24" ACCESS DOORS SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT LOCATED ABOVE GYPSUM BOARD CEILINGS. ALL FINAL ACCESS
DOOR LOCATIONS SHALL BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION.
12. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPES AND COORDINATE LOCATIONS WITH THE
ARCHITECTURAL REFLECTED CEILING PLAN AND ELECTRICAL LIGHTING LAYOUT.
13. ALL DUCTWORK VISIBLE THROUGH RETURN OR SUPPLY GRILLES TO BE PAINTED FLAT BLACK.
14. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTS SHALL HAVE THE TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS
SEALED AIRTIGHT WITH DUCT SEALANT (SMACNA SEAL CLASS "A").
15. COORDINATE EXACT LOCATIONS OF ALL ROOM THERMOSTATS AND/OR ROOM TEMPERATURE SENSORS WITH ARCHITECT/OWNER PRIOR TO
INSTALLATION.
16. BALANCE AIR SYSTEM TO QUANTITIES SHOWN, AND SUBMIT A COPY OF THE BALANCE REPORT TO THE ENGINEER FOR REVIEW.
DUCT FITTING REQUIREMENTS
W
W
D 45°
45°
R=1.5∅
30°-45°
MIN. 5-GORE
CL
CL
A
END TAP OR SIDE
TAP
DOWNSTREAM
OF TERMINAL UNITS
THE FOLLOWING DUCT FITTINGS ARE CONSIDERED ACCEPTABLE. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR OTHER FITTINGS PRIOR TO FABRICATION. ONLY FITTINGS WITH EQUAL OR LOWER PRESSURE DROP WILL BE CONSIDERED.
W
R
R=1/2W FOR DUCTS W/
AIR VELOCITY UNDER 1,500 FPM
R=W FOR DUCTS W/ AIR VELOCITY
OVER 1,500 FPM AND ALL DUCTS
UPSTREAM OF TERMINAL UNITS
12"x12" ACCESS PANEL ON
BOTTOM OF DUCT UPSTREAM
OF TURNING VANES, REQUIRED
FOR RETURN AND EXHAUST
DUCTS
TURNING
VANES
A≤15° FOR DUCTS W/ AIR
VELOCITY OVER 1,500 FPM.
A≤30° FOR DUCTS W/ AIR
VELOCITY UNDER 1,500 FPM
A
A≤15° FOR DUCTS W/ AIR
VELOCITY OVER 1,500 FPM.
A≤30° FOR DUCTS W/ AIR
VELOCITY UNDER 1,500 FPM
BRANCH DUCT TAKEOFFS
W/ MINIMUM PRESSURE DROP
ROUND OR
RECTANGULAR
D= 1/2W, BUT NOT
MORE THAN
12"
(1/3W OK IF
UNDER 3,000 FPM)
R=1/2W
DUCTS W/ AIR VELOCITY
UNDER 1,500 FPM
R=W DUCTS W/ AIR VELOCITY
OVER 1,500 FPM AND
ALL DUCTS UPSTREAM OF
TERMINAL UNITS
RECTANGULAR
DUCT
CONICAL
SPIN-IN
ROUND DUCT
RUNOUT TO SINGLE
DIFFUSER OR
GRILLE ONLY
OK ONLY
UNDER
1,000 FPM
45° OR 90°
RADIUS ELBOWS
AT FUME HOODS:
ROUND
DUCT ELBOWS
CONICAL SPIN-IN OR
TRANSITION TO AT
LEAST 70% GREATER
THAN AREA OF
SMALLER
DUCT. SEE MAX.
TRANSITION ANGLE.
SUPPLY AIR ONLY.
TRANSITION
CHANGE OF DUCT SIZEOFFSETS
NOTE: OFFSETS (TO AVOID OBSTRUCTIONS) ARE REQUIRED
BUT ARE NOT NECESSARILY SHOWN ON THE PLANS.
MAX. 15°
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-001
LEGENDS AND
ABBREVIATIONS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
OFFICE
OFFICE 03
MECH
EXHAUST FLUE UP
OUTSIDE AIR INTAKE LOUVER
(E) AHU
FUEL OIL PIPE
TO DIESEL TANK
TOOL RM
OFFICE
OFFICE
BATHROOM
MAINTENANCE
(E) EXHAUST HOOD TO REMAIN
(E) AC UNIT
DEMOLISH ALL EXISTING DUCTWORK,
GRILLES, AND DIFFUSERS
ASSOCIATED WITH AHU
(E) GENERATOR
(E) DESTRAT FAN,
TO REMAIN TYP 4
(E) WATER HEATER
(E) EXHAUST UP TO ROOF
DEMOLISH ALL
EXISTING
DUCTWORK
GENERAL NOTES
A. ALL WORK ASSOCIATED WITH THE QUONSET BUILDING IS
ALTERNATE 02.
B. CONTRACTOR TO DEMOLISH AND COMPLETELY REMOVE ALL
COMPONENTS OF EXISTING HVAC SYSTEM. DO NOT ABANDON IN
PLACE ANY DUCTS, PIPES, EQUIPMENT, ETC.
C. ALL REMOVED WALL PENETRATIONS SHALL BE PROPERLY
PATCHED AND SEALED TO MATCH THE EXISTING BUILDING
EXTERIOR.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
MD-111
QUONSET
BUILDING
MECHANICAL
FLOOR PLAN
DEMOLITION
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
3/16" = 1'-0"
QUONSET BUILDING 003 LEVEL 1 MECHANICAL DEMO (ALTERNATE 02)
3/16" = 1'-0"
QUONSET BUILDING 003 LEVEL 2 MECHANICAL DEMO (ALTERNATE 02)
KEY NOTES
1 DEMO EXISTING FUEL OIL PIPE TO FUEL TANK. CAP AT TANK
NOZZLE.
2 CONTRACTOR TO REMOVE BOTH EXISTING LOUVERS IN
MECHANICAL ROOM, TAKING APPROPRIATE ABATEMENT
MEASURES. INFILL TO MATCH SURROUNDING EXTERIOR
CONSTRUCTION. COORDINATE NEW LOUVER AND OUTSIDE AIR
INTAKE PENETRATION LOCATIONS PRIOR TO COMPLETING INFIL.
T
TT
OPEN TO
BELOW
OPEN TO
BELOW
LOFT
STORAGE
(E) FCU, TYP. 3
RS/RL UP
(E) BRANCH
SELECTOR BOX
(E) DESTRAT FAN, TYP.
RS/RL DN TO FCU
(E) FCU, TYP. 2
RL/RS LINES TO
CONDENSING UNITS
(E) DESTRAT FAN
TO REMAIN, TYP. 3
GENERAL NOTES
A. ALL DEMO WORK ASSOCIATED WITH THE RANGE BUILDING IS
BASE BID.
B. CONTRACTOR TO DEMOLISH AND COMPLETELY REMOVE ALL
COMPONENTS OF EXISTING VRF SYSTEM. DO NOT ABANDON IN
PLACE ANY PIPES, EQUIPMENT, ETC. REFRIGERANT LINE SETS
ARE SHOWN SINGLE LINE FOR CLARITY, EACH INDOOR UNIT HAS
BOTH A SUCTION AND LIQUID LINE INSTALLED.
C. OUTDOOR CONDENSING UNIT PREVIOUSLY REMOVED BY OTHERS.
CONTRACTOR SHALL REMOVE REMAINING REFRIGERANT IN
SYSTEM, PIPE, INSULATION, FITTINGS, ETC.
D. ALL REMOVED WALL PENETRATIONS SHALL BE PROPERLY
PATCHED AND SEALED TO MATCH THE EXISTING BUILDING
EXTERIOR.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
MD-112
RANGE BUILDING
MECHANICAL
FLOOR PLAN
DEMOLITION
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
3/16" = 1'-0"
RANGE BUILDING LEVEL 1 MECHANICAL DEMO (BASE BID)
3/16" = 1'-0"
RANGE BUILDING LEVEL 2 MECHANICAL DEMO (BASE BID)
U P
P E
R R
E Y
N O
L D
S C
R E
E K
R D
ZX RANCH RD
EXISTING QUONSET BUILDING (003)
EXISTING RANGE BUILDING (005)
(E) PROPANE TANK
GENERAL HVAC NOTES
A. CONTRACTOR SHALL PERFORM A UTILITY LOCATE PRIOR TO ANY
EARTHWORK.
B. PIPE TRENCHING (BEDDING, DEPTH, ETC.) AND UNDERGROUND
PIPE SPECIFICATION AND PROTECTION SHALL BE DETERMINED BY
THE PROPANE SUPPLIER. PROPANE SUPPLIER SHALL ALSO
SPECIFY THE METHOD OF TYING-IN TO THE EXISTING PROPANE
TANK AND TANK REGULATOR. MAINTAIN CLEARANCE FROM
OTHER BURIED UTILITIES.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-101
MECHANICAL SITE
PLAN
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
1" = 20'-0"
MECHANICAL SITE PLAN
3/4" LP UNDERGROUND TO RANGE
BUILDING. SEE M-112 FOR CONITNUATION
3/4" LP UNDERGROUND TO QUONSET
BUILDING, PART OF ALTERNATE 02. SEE
M-111 FOR CONITNUATION.
PROVIDE PRESSURE REGULATOR AT
ENTRANCE TO BUILDING. PRESSURE
SHALL BE SET TO 13" WC.
PROVIDE PRESSURE REGULATOR AT
ENTRANCE TO BUILDING. PRESSURE
SHALL BE SET TO 13" WC.
T
T
T
M-401
ZONE-03-02
ZONE-03-01
M-401
ZONE-05-03ZONE-05-02
ZONE-05-01
BASE BID ALTERNATE 01
M-401
GENERAL NOTES
A. WORK ASSOCIATED WITH THE RANGE BUILDING EAST SECTION IS
BASE BID. RANGE BUILDING WEST SECTION SCOPE IS ALTERNATE
01. ALL WORK ASSOCIATED WITH THE QUONSET BUILDING IS
ALTERNATE 02.
B. THERMOSTATS SHALL BE LOCATED SUCH THAT THEY DO NOT
INTERFERE WITH FACILITY OPERATIONS. CONTRACTOR SHALL
COORDINATE WITH FACILITY STAFF PRIOR TO INSTALLING.
C. FOR ZONES CONSISTING OF MORE THAN ONE MECHANICAL UNIT
PER ZONE: UNIT HEATERS ARE FOR AUXILIARY HEATING ONLY
AND SHALL NOT OPERATE WHILE THE HEATING LOAD IS
MAINTAINED BY THE HEAT PUMPS. UNIT HEATERS SHALL NOT
OPERATE WHILE ZONE AHU IS IN COOLING MODE.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
Checker
Author
231232
M-102
MECHANICAL ZONE
PLANS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
3/16" = 1'-0"
QUONSET BUILDING 003 LEVEL 1 MECHANICAL ZONE PLAN (ALTERNATE 02)
3/16" = 1'-0"
RANGE BUILDING 005 LEVEL 1 MECHANICAL ZONE PLAN
KEY NOTES
1 PROVIDE CARBON MONOXIDE DETECTOR IN LOCATIONS SHOWN
ON THE ZONE PLAN.
CO
CO
1S
EF-03-01
1S
1S
1R
1S
1R
1S
AHU-03-01
LV-03-02
HP-03-01
RS/RL
FLUE EXHAUST UP THROUGH
EXISTING CHIMNEY
12x12 RA/SA UP
6ø 6ø 6ø 6ø
6ø 6ø 6ø 6ø
6ø
HP-03-01
LP
1 3/4" LP
1R
6ø
AHU-03-02
STAIR UP
4 5
4S
10' - 0"
LV-03-01
2S
2R
18ø
8ø
10ø
8ø8ø 6ø
6ø 6ø
6ø
12x12
12x12
6ø 6ø 6ø 6ø
(E) GENERATOR
(E) WATER HEATER
M-401
6S
6S
6S
6S
3E
8ø
14ø
DN TO AHU-03-02
8ø FLUE EXHAUST UP
THROUGH EXISTING CHIMNEY
1/ 2"
L P
LP
18x18
18x18
DN TO AHU-03-02
DH-03-01
CONDENSATE LINE
CONCENTRIC VENT/FLUE
STAIR DOWN
/3
2"
0'
/1 6"
GENERAL HVAC NOTES
A. ALL WORK ASSOCIATED WITH THE QUONSET BUILDING IS
ALTERNATE 02.
B. OUTDOOR UNITS SHALL BE LOCATED SUCH THAT THEY DO NOT
INTERFERE WITH FACILITY OPERATIONS. CONTRACTOR SHALL
COORDINATE WITH FACILITY STAFF PRIOR TO INSTALLING UNITS.
ALL ACCESS CLEARANCES SHALL BE MAINTAINED AROUND UNITS.
C. CONDENSING UNITS SHALL BE INSTALLED ON STANDS, MINIMUM
OF 18" ABOVE GROUND LEVEL TO AVOID SNOW ACCUMULATION.
INTAKE AND EXHAUST ON AHU SHALL ALSO BE LOCATED
SUFFICIENTLY ABOVE GROUND LEVEL TO NOT BE IMPEDED BY
SNOW ACCUMULATION.
D. ALL WALL PENETRATIONS SHALL BE PROPERLY SEALED TO
MATCH THE EXISTING BUILDING EXTERIOR.
E. EXPOSED DUCTWORK SERVING THE MAINTENANCE AREA AND LP
PIPING SERVING UNIT HEATERS SHALL BE RUN HIGH, CLOSE TO
STRUCTURE. DUCTWORK SERVING OFFICE SPACES MAY BE RUN
ALONG THE CATWALK SIMILAR TO EXISTING.
F. ALL FLUE PIPING AND COMBUSTION AIR INTAKE PIPING SHALL BE
INSTALLED ACCORDING TO EQUIPMENT MANUFACTURER'S
REQUIREMENTS TO INCLUDE SLOPING, CLEARANCES, MATERIALS,
ETC.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-111
QUONSET
BUILDING
MECHANICAL
FLOOR PLANS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
3/16" = 1'-0"
QUONSET BUILDING 003 LEVEL 1 MECHANICAL (ALTERNATE 02)
3/16" = 1'-0"
QUONSET BUILDING 003 LEVEL 2 MECHANICAL (ALTERNATE 02)
KEY NOTES
1 NEW LIQUID PROPANE LINE SHALL BE INSTALLED UNDERGROUND
FROM EXISTING LP TANKS ON SITE TO QUONSET BUILDING. THE
CONTRACTOR SHALL INCLUDE SUFFICIENT FEE IN THEIR BID TO
PERFORM THIS WORK, ANTICIPATING 50 LINEAR FEET OF
UNDERGROUND PIPING. RE-USE THE EXISTING PENETRATION
THROUGH THE QUONSET BUILDING FROM THE DIESEL FUEL LINE
REMOVED IN DEMO. PROVIDE PRESSURE REGULATOR AT
ENTRANCE TO BUILDING. PRESSURE SHALL BE SET TO 14" WC.
2 INSTALL PROPANE-FIRED DUCT FURNACE IN HORIZONTAL SUPPLY
DUCTWORK INSIDE BUILDING PER MANUFACTURER'S
INSTRUCTIONS. INSTALL CONCENTRIC VENT OUT VERTICAL WALL
PER MANUFACTURER'S INSTRUCTIONS. ROUTE SLOPED
CONDENSATE PIPE TO VERTICAL WALL AND COORDINATE
TERMINATION LOCATION WITH OWNER.
3 INSTALL NEW AIR HANDLING UNIT INSIDE MECHANICAL ROOM.
PIPE CONDENSATE THROUGH WALL TO EXTERIOR. INSTALL FLUE
VENT UP THROUGH EXTERIOR CHIMNEY PER MANUFACTURER'S
INSTRUCTIONS, INSTALL FLASHING TO PREVENT WATER FROM
ENTERING AROUND FLUE PIPE. INSTALL COMBUSTION AIR INTAKE
THROUGH WALL PER MANUFACTURER'S INSTRUCTIONS.
4 CONTRACTOR TO PROVIDE NEW CONCRETE PAD UNDERNEATH
OUTDOOR EQUIPMENT. PAD SHALL EXTEND BEYOND UNIT 6" IN
ALL DIRECTIONS. SEE PAD DETAIL ON MECHANICAL DETAILS
SHEET.
5 CONDENSING UNITS TO BE INSTALLED ON STANDS MINIMUM 12"
ABOVE GRADE.
6 PROVIDE SUPPLY AIR TAP WITH BALANCING DAMPER TO SERVE
MECHANICAL ROOM. INSTALL GRILLE DIRECTLY TO DUCTWORK.
OPEN TO
BELOW
OPEN TO
BELOWSTORAGE
M-401
1E
1E
2E
3S
3S
1E
1E
1S
1S
1S
HP-05-01
AHU-05-01
RL/RS
AHU-05-02
HP-05-02
AHU-05-03
HP-05-03
RL/RS
RL/RS
12x12 UP
12x12 UP
14x14 UP14x14 UP
UNDERGROUND LIQUID PROPANE
LINE FROM TANK
LP UP TO ATTICE SPACE
1/2" LP UP
3/4" LP
UH-05-02
VENT TO OUTSIDE
1/2" LP
BASE BID ALTERNATE 01
M-401
14x1614x18
12x12
3 4
3 4
M-401
12ø x1 x1
8ø
6ø
6ø
6ø
3E
14ø
12x12
12x12 ø
8ø 6ø ø
6ø ø
DN TO AHU-05-01
14ø
6S
6S
DN TO AHU-05-02
DN TO AHU-05-03
5S
5S
5S x1 ø
12x24
3R
LV-05-01
LP DN TO AHU-05-03
1/2" LP
1/ 2"
L P
LP
LP DN TO UH-05-02
1/ 2"
L P
6S
LV-05-02
14x12
BASE BID ALTERNATE 01
M-401
10' - 3 1/2"
UH-05-01
MIN.
10' - 0"
GENERAL HVAC NOTES
A. WORK ASSOCIATED WITH THE RANGE BUILDING EAST SECTION IS
BASE BID. RANGE BUILDING WEST SECTION SCOPE (AHU-05-03) IS
ALTERNATE 01.
B. OUTDOOR UNITS SHALL BE LOCATED SUCH THAT THEY DO NOT
INTERFERE WITH FACILITY OPERATIONS. CONTRACTOR SHALL
COORDINATE WITH FACILITY STAFF PRIOR TO INSTALLING UNITS.
ALL ACCESS CLEARANCES SHALL BE MAINTAINED AROUND UNITS.
C. CONDENSING UNITS SHALL BE INSTALLED ON STANDS, MINIMUM
OF 18" ABOVE GROUND LEVEL TO AVOID SNOW ACCUMULATION.
INTAKE AND EXHAUST ON AHU SHALL ALSO BE LOCATED
SUFFICIENTLY ABOVE GROUND LEVEL TO NOT BE IMPEDED BY
SNOW ACCUMULATION.
D. ALL WALL PENETRATIONS SHALL BE PROPERLY SEALED TO
MATCH THE EXISTING BUILDING EXTERIOR.
E. EXPOSED DUCTWORK SERVING THE MAINTENANCE AREA OR
CLASSROOM AREA, AND LP PIPING SERVING UNIT HEATERS SHALL
BE RUN CLOSE TO STRUCTURE. DUCTWORK SERVING LEVEL 1
SPACES MAY BE RUN ALONG THE LEVEL 2 STORAGE FLOOR.
F. ALL FLUE PIPING AND COMBUSTION AIR INTAKE PIPING SHALL BE
INSTALLED ACCORDING TO EQUIPMENT MANUFACTURER'S
REQUIREMENTS TO INCLUDE SLOPING, CLEARANCES, MATERIALS,
ETC.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-112
RANGE BUILDING
MECHANICAL
FLOOR PLANS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
3/16" = 1'-0"
RANGE BUILDING 005 LEVEL 1 MECHANICAL
3/16" = 1'-0"
RANGE BUILDING 005 LEVEL 2 MECHANICAL
KEY NOTES
1 NEW LIQUID PROPANE LINE SHALL BE INSTALLED UNDERGROUND
FROM EXISTING LP TANKS ON SITE TO RANGE BUILDING. THE
CONTRACTOR SHALL INCLUDE SUFFICIENT FEE IN THEIR BID TO
PERFORM THIS WORK, ANTICIPATING 120 LINEAR FEET OF
UNDERGROUND PIPING. PROVIDE PRESSURE REGULATOR AT
ENTRANCE TO BUILDING. PRESSURE SHALL BE SET TO 14" WC.
2 INSTALL NEW AIR HANDLING UNIT INSIDE CLASSROOM. PIPE
CONDENSATE THROUGH WALL TO EXTERIOR. INSTALL
CONCENCTRIC VENT THROUGH EXTERIOR WALL PER
MANUFACTURER'S INSTRUCTIONS, MAINTAINING A MINIMUM OF 10'
CLEARANCE FROM AIR INTAKE.
3 CONTRACTOR TO PROVIDE NEW CONCRETE PAD UNDERNEATH
OUTDOOR EQUIPMENT. PAD SHALL EXTEND BEYOND UNIT 6" IN
ALL DIRECTIONS. SEE PAD DETAIL ON MECHANICAL DETAILS
SHEET.
4 CONDENSING UNITS TO BE INSTALLED ON STANDS MINIMUM 12"
ABOVE GRADE.
Level 1 0' - 0"
Level 2 8' - 0"
Quonset Roof 20' - 10"
(E) GENERATOR
DH-03-01
3E
AHU-03-02
CONCNETRIC FLUE/VENT
1/2" D
1S
6ø
1/2" LP ROUTED ABOVE
GARAGE DOOR ASSEMBLY
(BEYOND)
Level 1 0' - 0"
Level 2 8' - 0"
Quonset Roof 20' - 10"Range Roof
19' - 6"
14ø16ø12ø14ø
1/2" LP
ø 6ø
1S
2E
Level 1 0' - 0"
Level 2 8' - 0"
Range Roof 19' - 6"
HP-05-02
x1
14x14
AHU-05-02
6ø
6ø 8ø6ø6ø
1E
1S
1S
1E
1S
1/2" LP
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-401
MECHANICAL
SECTIONS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
1/4" = 1'-0"
SECTION
3/16" = 1'-0"
SECTION
1/4" = 1'-0"
SECTION
EQUIPMENT TAG TRAP STYLE DRAIN MAX PRESSURE
(IN WC)
X MIN.
(IN)
Y MIN.
(IN)
AHU-03-01 BLOW-THROUGH 2.0 1.0 3.0
AHU-03-02 BLOW-THROUGH 2.0 1.0 3.0
AHU-05-01 BLOW-THROUGH 2.0 1.0 3.0
AHU-05-02 BLOW-THROUGH 2.0 1.0 3.0
AHU-05-03 BLOW-THROUGH 2.0 1.0 3.0
1. DRAW-THROUGH DRAIN "X" IS THE MAXIMUM NEGATIVE STATIC PRESSURE AT DESIGN FLOW PLUS 1". DRAW-THROUGH "Y" IS
HALF OF THE MAXIMUM NEGATIVE STATIC PRESSURE PLUS 1".
2. BLOW-THROUGH DRAIN "X" IS 1" MINIMUM. BLOW-THROUGH DRAIN "Y" IS THE MAXIMUM NEGATIVE STATIC PRESSURE AT
DESIGN FLOW PLUS 1".
3. DIMENSIONS SHOWN ARE FOR BASIS-OF-DESIGN AHU'S. CONTRACTOR TO COORDINATE FINAL TRAP DIMENSIONS WITH
INSTALLED AHU'S.
4. CONDENSATE DRAIN PIPING SHALL SLOPE MINIMUM 1/8" PER FOOT AWAY FROM UNIT.
CHANGE OF DUCT SIZE
TRANSITION
BRANCH DUCT TAKEOFFS
END TAP
A ≤ 15° FOR DUCTS W/ AIR
VELOCITY OVER 1,500 FPM.
A ≤ 30° FOR DUCTS W/ AIR
VELOCITY UNDER 1,500 FPM
RECTANGULAR
DUCT
DUCT ELBOWS
NOTE: OFFSETS (TO AVOID OBSTRUCTIONS) ARE REQUIRED BUT ARE
NOT NECESSARILY SHOWN ON THE PLANS.
OFFSETS
TURNING
VANES
R=1/2W FOR DUCTS W/ AIR
VELOCITY UNDER 1,500 FPM
R=W FOR DUCTS W/ AIR VELOCITY
OVER 1,500 FPM AND ALL DUCTS
UPSTREAM OF TERMINAL UNITS
45° OR 90°
RADIUS ELBOWS
.0
ROUND OR
RECTANGULAR
CONICAL
SPIN-IN
ROUND DUCT RUNOUT
TO SINGLE DIFFUSER
OR GRILLE ONLY
.0
D
W
D=1/2W, BUT NOT MORE THAN
12" (1/3W PERMITTED IF AIR
VELOCITY UNDER 3,000 FPM)
A
CONICAL SPIN-IN OR TRANSITION
TO AT LEAST 70% GREATER THAN
AREA OF SMALLER DUCT. SEE MAX
TRANSITION ANGLE.
THE DUCT FITTINGS ABOVE ARE CONSIDERED ACCEPTABLE. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR ALTERNATIVE FITTINGS PRIOR TO FABRICATION. ONLY FITTINGS WITH EQUAL OR LOWER PRESSURE DROP WILL BE CONSIDERED.
A
W
12"x12" ACCESS PANEL ON
BOTTOM OF DUCT
UPSTREAM OF TURNING
VANES, REQUIRED FOR
RETURN AND EXHAUST
DUCTS
(ONLY PERMITTED FOR AIR
VELOCITY UNDER 1,500 FPM)
A ≤ 15° FOR DUCTS W/ AIR
VELOCITY OVER 1,500 FPM.
A ≤ 30° FOR DUCTS W/ AIR
VELOCITY UNDER 1,500 FPM
R
A
W
R
R=1/2W FOR DUCTS W/ AIR
VELOCITY UNDER 1,500
FPM
R=W FOR DUCTS W/ AIR
VELOCITY OVER 1,500 FPM
AND ALL DUCTS
UPSTREAM OF TERMINAL
UNITS
SECTION A-A
RECTANGULAR DUCT
ROUND DUCT
A
A
SIZE DUCTWORK SO GRILLE
DOES NOT EXTEND BEYOND
OUTER SURFACE, VERIFY SIZE
WITH DIFFUSER SUPPLIER
SPIRAL SUPPLY DUCT
SUPPLY GRILLE
SUPPLY
AIR PLENUM
SPIRAL
DUCT
APPLY SEALANT
ALL AROUND
SHEET METAL SCREW
OPPOSED BLADE DAMPER
SIZE DUCTWORK SO GRILLE
DOES NOT EXTEND BEYOND
OUTER SURFACE, VERIFY SIZE
WITH DIFFUSER SUPPLIER
SHEET METAL SCREW
OPPOSED BLADE DAMPER
GRILLE
DUCT
420ONE 1 x 18 GA STRAP36
ONE 1 x 16 GA STRAP
50 700
ONE 1 x 22 GA STRAP
QUANTITY/SIZE IN.MAX. DUCT
Ø IN.
HANGER STRAPS OR RODS
MAX. LOAD LBS.
MAX. SPACING
IN.
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING AND
INSULATION, BUT NO EXTERNAL LOAD.BAND OF SAME
SIZE AS HANGER
STRAP
LOAD RATED
FASTENERS
50" Ø & UNDER
TWO 3/8 Ø RODS
TWO 1/2 Ø RODS
18 GAUGE SHEET METAL COLLAR
FLANGE TIGHT AGAINST WALL
SURFACE. ATTACH TO DUCT WITH
SHEET METAL SCREWS OR POP RIVETS
PARTITION WALL
WALLBOARD
STUD FRAME OPENING
NOT BY MECHANICAL
SHEET METAL DUCT
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE 7
6 8 10
9 1110 12
1312 14 -16
1614 17 2219
TO 1000 LB. UNIFORM LOAD
TRAPEZE HANGER FOR UP
PROVIDE INSULATION SHIELD
AND INSERT FOR ALL PIPING (8" MIN.)
SIDE VIEW
1 5/8" 12 GAGE
CHANNEL OR 2"X2"X1/4"
ANGLE
SPACING ON 36" MAX.
HANGER RODS WITH
1/2" DIA. EACH CHANNEL
BAND
8 1064 532 2 1/21 1/21 1 1/4IN.
FT.
FT.
THRU 3/4
7 7
7 98
1" M
A X
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION
(9 PCF MIN. DENSITY)
UNDER INSULATION SHIELD
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
INSULATION SHIELD AT HANGER
INSULATION (VAPOR BARRIER
TYPE IS REQUIRED FOR LOW
TEMPERATURE PIPE)
NEOPRENE
GASKET ALL
AROUND
AHU BASE
RAIL
SEISMIC RESTRAINT
CLIP, FASTEN TO
CURB AND BASERAIL
WITH SELF TAPPING
CREWS.
AHU
CURB
ANCHOR BOLT
NEOPRENE
GASKET ALL
AROUND
CONCRETE
HOUSEKEEPING PAD
NOTE: CONDENSATE DRAIN
MATERIALS SHALL BE TYPE 'L' OR 'M'
COPPER
DRAIN PAN
HVAC UNIT
OPEN VENT
Y, SEE SCHEDULE
SIZE SAME AS OUTLET
UNION
ROUTE 4' FROM
UNIT
NVENT CADDY
PYRAMID ST, OR
APPROVED EQUAL
X, SEE SCHEDULE
6" DRIP LEG WITH CAP
1/2" LP CONNECTION
TO EQUIPMENT
CERTIFIED LP FLEX LINE
LP SUPPLY LINE
G
GAS SUPPLY LINE
1/2" LP
CONNECTION TO
EQUIPMENT
CERTIFIED LP FLEX LINE
6" DRIP LEG WITH CAP
LISTED LP VALVE
UNION
PIPE REDUCER,
IF REQUIRED
UNION
GLISTED LP
VALVE
PIPING FROM
ABOVE
SUPPLY FROM ABOVE
HORIZONTAL SUPPLY
VERTICAL OFFSET
FOR DRIP LEG FLASHING AT WALL OR
ROOF PENETRATION
SUPPORT RODS W/
STIFFENING ANGLES
SEISMIC RESTRAINT
1/2" LP
DIRT LEG
DRIP LEG/CLEANOUT
CAP
EXHAUST TERMINAL
SLOPE 1/4" PER FOOT UP
TOWARDS TERMINATION
1/
2"
C
LE
A R
2"
CLEAR
6" 6"
1' -0
3"
C
LE
A R
1' -6
FINISH
GRADE
3/4" CHAMFER
ALL AROUND
AND DOWN
CORNERS #5 AT 12" ON
CENTER EA
WAY, TOP AND
BOTTOM
NON-FROST
SUSCEPTIBLE FILL
COMPACT TO 95%
COMPACT IN-SITU FILL TO
95%
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-501
MECHANICAL
DETAILS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
NTS
LOW PRESSURE DUCT FITTING REQUIREMENTS
NTS
SUPPLY GRILLE 5S & 6S - EXPOSED DUCTWORK
NTS
ROUND DUCT HANGER
NTS
STUD WALL PENETRATION
NTS
TYPICAL PIPE HANGER
12" = 1'-0"
AIR HANDLING UNIT MOUNTING DETAIL
NTS
CONDENSATE TRAP - AHUs
NTS
PROPANE EQUIP. CONNECTION
NTS
PROPANE FIRED UNIT HEATER
NTS
SECTION - AIR HANDLING UNIT PAD
AIR HANDLING UNIT SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
NOMINAL
CAPACITY
(TONS)
SUPPLY FAN EXHAUST/RETURN FAN HEATING COIL COOLING COIL
UNIT POWER REQMTS UNIT
WT.
(LBS)
REMARKSCOOLING
CFM
HEATING
CFM
MIN OA
CFM
ESP
(IN WC)
MOTOR DATA TOTAL
CFM
ESP
(IN WC)
MOTOR DATA INPUT
MBh
OUTPUT
MBh
EAT
(F)
LAT
(F)
APD
(IN WC)
TOTAL
MBh
SENS.
MBh
EAT (F) LAT (F)
HP RPM FLA HP RPM FLA DB WB DB WB VOLTS Ø MCA MOCP
AHU-03-01 MECH RM
QUONSET
BUILDING
DAIKIN/
DC96VC0403BN
1.5 595 595 70 0.50 1/2 1,075 - - - - - - 40 16.0 60.0 85.0 - 13.4 13.0 77.6 57.8 58.0 - 115 1 7.1 15 116 1,6
AHU-03-02
OUTDOOR,
GRADE
QUONSET
BUILDING
RENEWAIRE/
HE-3XJRTC-D15WW
- - 2,200 2,200 0.50 3 14.7 2,200 0.50 3 - 14.0 - - - 80 - - - - - - - 240 1 33.1 40 800 4,6
AHU-05-01
OUTDOOR,
GRADE
RANGE
BUILDING
OXYGEN8/
A18OU
3 700 350 350-700 0.50 - 2,633 2.5 800 0.50 - 2,880 2.5 - - - - - 22.6 22.0 82.4 58.4 58.0 48.0 240 1 17.0 - 540 2,3
AHU-05-02
OUTDOOR,
GRADE
RANGE
BUILDING
OXYGEN8/
B22OU
3 1,200 600 600-1200 0.50 - 2,618 3.9 1,200 0.50 - 2,755 3.9 - - - 72 - 27.5 27.5 82.4 58.4 55.1 48.1 240 1 25.7 - 786 2,3
AHU-05-03 CLASSROOM
RANGE
BUILDING
DAIKIN/
DC96VC0804CN
3 1,700 1,700 255 0.50 3/4 1,075 - - - - - - 80 56.9 60.0 89.0 30.1 30.0 77.6 57.8 58.0 - 115 1 10.4 15 143 1,5
1. UNIT HAS VARIABLE SPEED ECM SUPPLY FAN AND TWO-STAGE PROPANE AUXILIARY HEAT. UNIT SHALL BE PROVIDED WITH COMPATIBLE HEAT PUMP CASED UPFLOW EEV COIL AND CONDENSING UNIT (SEE CONDENSING UNIT SCHEDULE).
2. ENERGY RECOVERY UNIT WITH PLATE HEAT EXCHANGER, 3kW ELECTRIC PREHEAT, AND DAIKIN VRV INTEGRATED HEAT PUMP KIT. PROVIDE UNIT WITH CONTROL DAMPERS AND ACTUATORS.
3. VARIABLE VOLUME UNIT: UNIT SHALL RUN AT HEATING CFM WHEN IN HEATING MODE. UNIT IS STILL 100% OUTSIDE AIR.
4. CONSTANT VOLUME ENERGY RECOVERY UNIT FOR SHOP TO PROVIDE CODE MINIMUM EXHAUST AND HEATING, NO COOLING. HEATING IS PROVIDED BY DUCT-MOUNTED GAS FURNACE, SEE DUCT FURNACE SCHEDULE. ENERGY RECOVERY SENSIBLE EFFECTIVENESS 70% AT DESIGN CONDITIONS ON M-001.
5. AIR HANDLING UNIT SERVING THE EAST PORTION OF THE RANGE BUILDING IS ALTERNATE 01.
6. AIR HANDLING UNITS SERVING THE QUONSET BUILDING ARE ALTERNATE 02.
HVAC CONDENSING UNIT SCHEDULE
TAG LOCATION SERVES
MANUFACTURER/
MODEL
NOMINAL
CAPACITY
(TONS)
COOLING CAPACITY HEATING CAPACITY
# OF
CIRCUITS
REFRIG.
COMPRESSOR LIQUID
CONN.
(IN)
SUCTION CONN. (IN)
UNIT POWER
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKSTOTAL
MBh
SEER2/
EER2
RATED
AAT
°F)
TOTAL
MBh
COP/
HSPF2
RATED
AAT
°F)
TYPE QTY RLA
(EA) VOLTS Ø MCA MOCP
HP-03-01
QUONSET
BUILDING
AHU-03-01
DAIKIN/
DZ6VSA1810
1.5 16.6
17.5/ 10.9
95 17.4 3.7/ 8.5
47 1 R-410A VARIABLE 1 10 3/8 3/4 208-230 1 14.6 15 147 1,4,5
HP-05-01
RANGE
BUILDING
AHU-05-01
DAIKIN/
RXTQ36TBVJUA
3 34.2 15.3/ 9.2
95 37.0 3.3/ 8.5
47 - R-410A SWING 1 - 3/8 5/8 208-230 1 16.5 20 172 2,5
HP-05-02
RANGE
BUILDING
AHU-05-02
DAIKIN/
RXTQ36TBVJUA
3 34.2 15.3/ 9.2
95 37.0 3.3/ 8.5
47 - R-410A SWING 1 - 3/8 5/8 208-230 1 16.5 20 172 2,5
HP-05-03
RANGE
BUILDING
AHU-05-03
DAIKIN/
DZ6VSA361E
3 30.2 17.5/ 10.0
95 30.2 3.3/ 8.6
47 R-410A VARIABLE 25.5 3/8 7/8 208-230 1 34.4 35 168 1,3,5
1. PROVIDE WITH DAIKIN EEV COIL FOR INSTALLATION WITH FURNACE UNIT.
2. DAIKIN VRV INTEGRATED HEAT PUMP KIT PROVIDED WITH ENERGY RECOVERY UNIT. CAPACITY CONTROL RANGE LOW LIMIT IS 14% OF TOTAL CAPACITY.
3. RANGE BUILDING EAST IS ALTERNATE 01
4. QUONSET BUILDING SCOPE IS ALTERNATE 02.
5. INSTALL OUTDOOR HEAT PUMP CONDENSING UNIT ON A STAND, MINIMUM 12" CLEARANCE FROM BOTTOM OF UNIT TO GROUND.
FAN SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
DESCRIPTION FAN PERFORMANCE MOTOR ELECTRICAL
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKS
TYPE DRIVE FLOW
(CFM)
ESP
(" WC)
SPEED
(RPM)
NOISE
(SONES)
INPUT
WATTS VOLTS Ø FLA
EF-03-01 BATHROOM
GREENHECK/
SP-LP0511
CEILING DIRECT 100 0.25 - 2.1 22.70 115 1 - - 1
1. PROVIDE 6" ROUND WALL CAP AND BACKDRAFT DAMPER FOR DISCHARGE.
GRILLES, REGISTERS, DIFFUSERS SCHEDULE
TAG TYPE MANUFACTURER/ MODEL GRILLE SIZE MATERIAL FRAME STYLE FINISH NOTES
1S SUPPLY PRICE/SMCD 6x6 STEEL FLAT FRAME WHITE 1, 2
2S SUPPLY PRICE/SMCD 8x8 STEEL FLAT FRAME WHITE 1, 2
3S SUPPLY PRICE/SMCD 10x10 STEEL FLAT FRAME WHITE 1, 2
4S SUPPLY PRICE/510 6x4 STEEL FLAT FRAME MILL 1, 2
5S SUPPLY PRICE/SDG 12x10 STEEL DUCT MOUNT MILL 1, 2, 4
6S SUPPLY PRICE/SDG 18x10 STEEL DUCT MOUNT MILL 1, 2, 4
1R RETURN PRICE/530 6x6 STEEL FLAT FRAME WHITE 1, 2
2R RETURN PRICE/530 8x8 STEEL FLAT FRAME WHITE 1, 2
3R RETURN PRICE/510Z 24x14 STEEL FLAT FRAME MILL 1, 2
1E EXHAUST PRICE/530 8x8 STEEL FLAT FRAME WHITE 1, 2, 3
2E EXHAUST PRICE/530 12x12 STEEL FLAT FRAME WHITE 1, 2, 3
3E EXHAUST PRICE/510Z 18x18 STEEL DUCT MOUNT MILL 1, 2, 3
1. SEE FLOOR PLANS FOR CONNECTION SIZE.
2. PROVIDE WITH SINGLE DEFLECTION OPTION.
3. IN RESTROOMS AND MECHANICAL ROOMS 003-07, 003-03, 005-03, AND 005-05 USE ALUMINUM INSTEAD OF STEEL.
4. PROVIDE BALANCING DAMPER ON SPIRAL DUCT-MOUNTED GRILLES.
SEISMIC AND VIBRATION CONTROL SEISMIC RESTRAINT PROVISIONS
TAG EQUIPMENT LEVEL RESTRAINTS BASE
FLEXIBLE
CONNECTORS
VIBRATION
ISOLATORS
DEFLECTION
(IN)
SEISMIC SUPPORTS ARE REQUIRED FOR THIS PROJECT FOR ALL MECHANICAL AND ELECTRICAL EQUIPMENT AND DISTRIBUTION SYSTEMS. SEISMIC RESTRAINT CALCULATIONS MUST BE PROVIDED BY THE PRODUCT MANUFACTURER FOR ALL CONNECTIONS OF EQUIPMENT TO THE STRUCTURE. ALL RESTRAINING DEVICES SHALL HAVE TESTING DATA TO VALIDATE MAXIMUM RESTRAINT RATINGS. PREAPPROVALS BASED ON INDEPENDENT TESTING ARE PREFERRED TO PREAPPROVALS BASED ON CALCULATIONS. CALCULATIONS (INCLUDING THE COMBINING OF TENSILE AND SHEAR LOADING) TO SUPPORT SEISMIC RESTRAINT DESIGNS MUST BE STAMPED BY A REGISTERED PROFESSIONAL ENGINEER LICENSED IN IDAHO. THE ENGINEERING ANALYSIS MUST INDICATE CALCULATED DEAD LOADS, STATIC SEISMIC LOADS, AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS TO EQUIPMENT STRUCTURE. ANALYSIS MUST DETAIL ANCHORING
METHODS, BOLT DIAMETER, EMBEDMENT, AND/OR WELDED LENGTH.
AHU-03-01 INDOOR AIR HANDLING UNIT GRADE A NR YES NR NA
AHU-03-02 OUTDOOR AIR HANDLING UNIT GRADE A NR YES NR NA
AHU-05-01 OUTDOOR AIR HANDLING UNIT GRADE A NR YES NR NA
AHU-05-02 OUTDOOR AIR HANDLING UNIT GRADE A NR YES NR NA
AHU-05-03 INDOOR AIR HANDLING UNIT GRADE A NR YES NR NA
HP-03-01 OUTDOOR CONDENSING UNIT GRADE A NR NR NR NA
HP-05-01 OUTDOOR CONDENSING UNIT GRADE A NR NR NR NA
HP-05-02 OUTDOOR CONDENSING UNIT GRADE A NR NR NR NA ALL SEISMIC RESTRAINT DEVICES SHALL BE DESIGNED TO ACCEPT, WITHOUT FAILURE, THE FORCES PRESCRIBED PER THE ASCE 7 ACTING THROUGH THE EQUIPMENT CENTER OF GRAVITY. OVERTURNING MOMENTS MAY EXCEED FORCES AT GROUND LEVEL AND MAY BE RESISTED BY SEISMIC RESTRAINTS, SUPPORT, OR ANCHORAGE. ANCHORAGE TO CONCRETE MUST HAVE AN ICC TESTING REPORT THAT ADHERES TO THE REQUIREMENTS OF THE IBC AND MUST BE RATED FOR SEISMIC RESTRAINT IN CRACKED CONCRETE USING THE APPROPRIATE REDUCTION FACTORS PER ACI 318 APPENDIX D. ACCEPTABLE ANCHORS INCLUDE THE HILTI KWIK BOLT TZ AND SIMPSON STRONG BOLT WEDGE ANCHORS OR HILTI HIT-RE 500-SD AND SIMPSON SET XP EPOXY ANCHORS. EPOXIES ARE NOT ACCEPTABLE FOR USE IN OVERHEAD
APPLICATIONS.
HP-05-03 OUTDOOR CONDENSING UNIT GRADE A NR NR NR NA
UH-05-01 UNIT HEATER CEILING Y A YES 3 0.75
UH-05-02 WALL HEATER CEILING A NR YES NR NA
DH-03-01 DUCT HEATER CEILING Y A YES 3 0.75
ASCE 7-16 SEISMIC DESIGN CRITERIA
SEISMIC DESIGN CATEGORY "C"
RISK CATEGORY II
SITE CLASS "D"
SEISMIC IMPORTANCE FACTOR FOR BUILDING, I = 1.0
COMPONENT RESPONSE MODIFICATION AND AMPLIFICATION FACTORS
SHALL BE DETERMINED IN ACCORDANCE WITH ASCE 7, TABLE 13.6-1.
DESIGN SPECTRAL RESPONSE ACCELERATION AT SHORT PERIODS (0.2 SECOND):
SDS = 0.275 G.
DESIGN SPECTRAL RESPONSE ACCELERATION AT 1-SECOND PERIOD:
RESTRAINTS BASE TYPE
SD1 = 0.154 G.
NOTESA = ANCHOR A = ISOLATOR ATTACHED TO EQUIPMENT DIRECTLY
AM = ANCHOR SPECIFIED BY EQUIPMENT MANUFACTURER B = STRUCTURAL STEEL RAILS OR BASE 1 CONCRETE PAD MASS TO EQUAL AT LEAST 75% OF EQUIPMENT
B = RESTRAINING BASE WITH SNUBBER C = CONCRETE INERTIA BASE 2 NR=NOT REQUIRED, NA=NOT APPLICABLE
Y = REQUIRED PER SPECIFICATION 23 05 40 D = CURB-MOUNTED BASE 3 PIPING TO BE BRACED LATERALLY A MINIMUM OF EVERY 40' AND LONGITUDINALLY EVERY 80' REGARDLESS
OF SEISMIC REQUIREMENTS.
ISOLATOR TYPE 4 SEE SPECIFICATION SECTION 23 05 40 FOR DESCRIPTION AND REQUIREMENTS OF BASES, ISOLATORS, AND
RESTRAINTS.1. PAD: RUBBER, GLASS FIBER 4. RESTRAINED SPRING ISOLATOR
2. RUBBER ISOLATOR, FLOOR OR HANGER 5. THRUST RESTRAINT 5 ALL PIPING GREATER THAN 1" MUST BE RESTRAINED
3. SPRING ISOLATOR, FLOOR OR HANGER 6. AIR SPRING 6 EQUIPMENT VENDOR TO DETERMINE DEFLECTION
PROPANE UNIT HEATER SCHEDULE
TAG LOCATION
MANUFACTURER/
MODEL
ORIENTATION
AIR
FLOW
(CFM)
FAN
MOTOR
HP
PROPANE HEAT INLET
PRESS.
(IN WC)
UNIT ELECTRICAL
REQUIREMENTS
UNIT
WT.
(LBS)
REMARKSINPUT
MBh
OUTPUT
MBh
RISE
(F) VOLTS Ø FLA
UH-05-01
RANGE
BUILDING
MODINE/
HDC75
HORIZONTAL 1389 1/3 75 62 46 11-14 115 1 7.1 60 1, 2, 3, 4
UH-05-02
RANGE
BUILDING
RINNAI/
EX38CTP
WALL MOUNTED - 117 W 36.5 15 - 8-13 120 1 - 88 1
1. ALL UNIT HEATERS SHALL BE SIZED FOR PROPANE USE, PROVIDE CONVERSION KIT AND/OR HIGH ALTITUDE KIT AS NECESSARY.
2. UNIT HEATER SHALL BE MOUNTED AT 10 FEET ABOVE FINISHED FLOOR.
3. PROVIDE 7-DAY PROGRAMMABLE THERMOSTAT. PROGRAM DEADBAND SUCH THAT HEATER DOES NOT OPERATE WHEN ZONE COOLING IS ACTIVE.
4. PROVIDE UNIT HEATER WITH
LOUVER SCHEDULE
TAG SERVES
MANUFACTURER/
MODEL
MATERIAL
FRAME
TYPE
AIRFLOW
(CFM)
LOUVER
SIZE, WxH
(IN)
FACE
AREA
(SF)
FACE
VELOCITY
(FPM)
FREE
AREA
(SF)
FREE AREA
VELOCITY
(FPM)
APD
(IN WC)
DRAINABLE
BLADE
(YES/NO)
FRAME
DEPTH (IN)
MOTOR ELECTRICAL
REQUIREMENTS WEIGHT
(LBS)
BOTTOM OF
LOUVER
ELEVATION
NOTES
VOLTS Ø FLA
LV-03-01
AHU-03-01
INTAKE
GREENHECK/
EAC-401
ALUMINUM CHANNEL 100 14 x 12 1.17 86 0.15 667 0.06 YES 4 24 - - 4 7' AFF 1,2,3
LV-03-02
AHU-03-01
EXHAUST
GREENHECK/
EAC-401
ALUMINUM CHANNEL 100 16 x 12 1.33 75 0.17 588 0.05 YES 4 24 - - 5 7' AFF 1,2,3
LV-05-01
AHU-05-03
INTAKE
GREENHECK/
EAC-401
ALUMINUM CHANNEL 255 16 x 14 1.56 164 0.39 654 0.05 YES 4 24 - - 6 9' AFF 1,2,3
LV-05-02
AHU-05-03
EXHAUST
GREENHECK/
EAC-401
ALUMINUM CHANNEL 255 16 x 14 1.56 164 0.38 671 0.07 YES 4 24 - - 6 9' AFF 1,2,3
1. PROVIDE W/ INTERNAL ALUMINUM BIRD SCREEN. COORDINATE FINAL LOUVER COLOR AND FINISH WITH OWNER PRIOR TO PURCHASE.
2. MOTORIZED 2-POSITION COMBINATION LOUVER SHALL BE CONNECTED VIA RELAY TO AHU SUPPLY FAN, THE LOUVER SHALL BE OPEN PRIOR TO FAN START AND CLOSE AFTER FAN SHUTDOWN.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING LOUVER TO INCLUDE ANY NECESSARY HEADER OR BLOCKING TO SUPPORT LOUVER. SLOPE DUCT TOWARD LOUVER. CAULK OR OTHERWISE SEAL WATER-TIGHT.
PROPANE-FIRED DUCT HEATER
TAG SERVES MANUFACTURER/ MODEL
AIRFLOW
INPUT
MBH
OUTPUT
MBH
DUCT DIMENSIONS (IN)
UNIT ELECTRICAL
REQUIREMENTS REMARKS
CFM EAT (F) LAT (F) WIDTH HEIGHT VOLTS Ø FLA
DH-03-01 AHU-03-02 SUPPLY
RENEWAIRE/
GH-INSI100PSSHT2N31N-ST--
2200 50 81 100 78 27 18 240 1 1.5 1,2,3
1. PROVIDE WITH A HIGH LIMIT SAFETY SHUT-OFF, COMBUSTION AIR PRESSURE SWITCH, AIR-PROVING SWITCH, COMBINATION GAS VALVE WITH SHUTOFF.
2. DUCT HEATER SHALL BE MINIMUM 2-STAGE AND PROVIDED WITH THERMOSTAT TO BE INSTALLED IN THE OCCUPIED ZONE.
3. DUCT HEATER SHALL BE PROVIDED WITH AHU-03-02 AND IS PART OF ALTERNATE 02 SCOPE.
GENERAL NOTES
A. WORK ASSOCIATED WITH THE RANGE BUILDING EAST SECTION IS
BASE BID. RANGE BUILDING WEST SECTION SCOPE IS ALTERNATE
01. ALL WORK ASSOCIATED WITH THE QUONSET BUILDING IS
ALTERNATE 02.
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-601
MECHANICAL
SCHEDULES
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
VFD
EA DAMPER
EA RA
DO
M
T AI RA TEMP
DP
DISUPPLY
FILTER
STATUS
OA
OA DAMPER
T
AI OA TEMP
DI FAULT
AO SPEED
DO START/STOP
DI STATUS
SA
D
X
R S
R L
NO, FC
NO, FC
T AI
SUPPLY AIR
TEMPERATURELP
AO COOLING/HEATING STAGING
AO MODULATING FURNACE
DI COMPRESSOR FAULT
EXHAUST LOUVER
INTAKE LOUVER
T
AI
ZONE
TEMPERATURE
DO
M
SUPPLY
FAN
M
DO
OA
DAMPER
OA FILTERS
DP
AI
EA FILTER
∆P
T
AI
EA TEMP
SD
DI
SMOKE
DETECTOR
OA
EA
M
ECM
AO DO DI AI
T
S E
T P
O
IN
T
S T
A R
T /S
T O
P
S T
A T
U S
C U
R R
E N
T
AI EA TEMP
AO
COMPRESSOR
FAULT
C
C
HEAT
EXCHANGER
T
AI
SA TEMP
EXHAUST AIR
CONDENSING UNIT
REFRIGERANT
PIPING
MAO
BY-PASS
DAMPER
M
AO
BY-PASS
DAMPER
T
AI
OA TEMP
M
DO
EA
DAMPER
DP
AI
M
ECM
AO DO DI AI
S E
T P
O
IN
T
S T
A R
T /S
T O
P
S T
A T
U S
C U
R R
E N
T
T
AI
ZONE
TEMPERATURE
DI
COOLING/HEATING
STAGING
SUPPLY AIR
GENERAL NOTES
A. WORK ASSOCIATED WITH THE RANGE BUILDING EAST SECTION IS
BASE BID. RANGE BUILDING WEST SECTION SCOPE IS ALTERNATE
01. ALL WORK ASSOCIATED WITH THE QUONSET BUILDING IS
ALTERNATE 02.
T SPACE THERMOSTAT
SHEET OF
DATE
CHECKED
DRAWN
PROJ. NO.
COFFMAN ENGINEERSC
A
B
C
D
54321
D
C
B
A
1 2 3 4 5
SHEET NO:
SHEET TITLE:
A 10-24-23 50% DESIGN SUBMITTAL
B 12-08-23 95% DESIGN SUBMITTAL
C 02-14-24 FINAL TURNOVER
/1
/2
:2
:2
P
M
02-14-2024
TAH
RKC
231232
M-701
MECHANICAL
CONTROL
DIAGRAMS
RCEW
BUILDING
REPAIRS
USDA ARS
FINAL
TURNOVER
20117 UPPER REYNOLDS
CREEK ROAD, MURPHY, ID
83650
NTS
CONTROL DIAGRAM AHU-03-01, AHU-05-03
NTS
CONTROL DIAGRAM AHU-05-01, AHU-05-02, AHU-03-02
DESCRIPTION OF OPERATION
BUILDING AUTOMATION SYSTEM:
THE FACILITY DOES NOT HAVE A BUILDING AUTOMATION SYSTEM AND ONE WILL NOT BE INSTALLED IN THIS PROJECT. ALL EQUIPMENT SHALL BE PROVIDED WITH PACKAGED CONTROLS AND WILL OPERATE STANDALONE. DEADBAND SETPOINTS WILL
PREVENT SIMULTANEOUS HEATING AND COOLING OF ANY SPACES.
AHU-03-01 AND AHU-05-03:
PROVIDE SINGLE-ZONE HEATING, VENTILATION, AND COOLING FOR THEIR RESPECTIVE ZONES. THE OCCUPANCY MODE SHALL BE DETERMINED THROUGH A USER-ADJUSTABLE, GRAPHICAL, SEVEN-DAY SCHEDULE WITH HOLIDAY SCHEDULE.
OCCUPIED MODE:
1. THE SUPPLY FAN SHALL BE ENERGIZED AND RUN WITH OUTSIDE AIR DAMPER OPEN AT LOW SPEED.
2. THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE LINEARLY RESET FROM T-MIN (55°F ADJ) WHEN THE OUTSIDE AIR
TEMPERATURE IS 70°F AND ABOVE TO T-MAX (75-90°F) WHEN THE OUTSIDE AIR TEMPERATURE IS 65°F AND BELOW.
3. UPON CALL FOR HEATING, INITIATE HEAT PUMP HEATING MODE AND MAINTAIN HEATING AIR SUPPLY TEMPERATURE
SETPOINT OF 85°F (ADJ). IF SPACE SETPOINT IS STILL NOT MET, INCREASE SUPPLY FAN SPEED TO HIGH. IF DISCHARGE AIR SETPOINT CANNOT BE MET, OR THE HEAT PUMP ENTERS DEFROST, ENGAGE PROPANE HEATING COIL
TO MAINTAIN SUPPLY TEMPERATURE SETPOINT.
4. UPON CALL FOR COOLING, INITIATE FIRST STAGE COOLING AND MAINTAIN COOLING AIR SUPPLY TEMPERATURE SETPOINT. IF UNABLE TO MAINTAIN SETPOINT, ACTIVATE SECOND STAGE COOLING AND INCREASE SUPPLY FAN SPEED. SEPARATE THE TWO STAGES BY AN ADJUSTABLE TEMPERATURE DEAD BAND TO ACHIEVE NO MORE THAN 4
COMPRESSOR STARTS PER HOUR.
UNOCCUPIED MODE:
1. THE SUPPLY FAN SHALL BE DE-ENERGIZED, OUTSIDE AIR AND EXHAUST AIR DAMPERS CLOSED.
2. WHEN THE SPACE TEMPERATURE DROPS BELOW THE UNOCCUPIED SETPOINT, THE SUPPLY FAN WILL ENERGIZE AND
RUN AT LOW SPEED BUT OUTSIDE AIR DAMPERS WILL REMAIN CLOSED. HEATING WILL ACTIVATE UNTIL SETPOINT IS
REACHED.
AHU-05-01, AHU-05-02
PROVIDE SINGLE-ZONE HEATING, VENTILATION, AND COOLING FOR THEIR RESPECTIVE ZONES. THE OCCUPANCY MODE SHALL BE DETERMINED THROUGH A USER-ADJUSTABLE, GRAPHICAL, SEVEN-DAY SCHEDULE WITH HOLIDAY SCHEDULE.
OCCUPIED MODE:
1. THE SUPPLY AND EXHAUST FANS SHALL BE ENERGIZED AND RUN WITH DAMPERS OPEN.
2. THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET FROM T-MIN (55°F ADJ) WHEN THE OUTSIDE AIR
TEMPERATURE IS 70°F AND ABOVE TO T-MAX (75-90°F) WHEN THE OUTSIDE AIR TEMPERATURE IS 65°F AND BELOW.
3. UPON CALL FOR HEATING, INITIATE HEAT PUMP HEATING MODE AND MAINTAIN HEATING AIR SUPPLY TEMPERATURE
SETPOINT OF 85°F (ADJ). IF SPACE SETPOINT IS STILL NOT MET, DECREASE SUPPLY FAN SPEED TO LOW TO REDUCE THE AMOUNT OF OUTSIDE AIR ENTERING THE ZONE. SPACE PROPANE HEATING WILL MAINTAIN SUPPLY
TEMPERATURE SETPOINT.
4. WHEN…