ARROWHEADCONSTRUCTION_STDF-2026-9.pdf

PDF 103 KB Posted

Attached to
CN NE|45773
Contract number
45773
Issued by
Nebraska

About this file

This is a Unit Price Quotation document from the University of Nebraska for a project at the Lincoln Campus in the Southeast region. The document involves Arrowhead Construction, located at 1267 280th Rd, Seward, NE 58434, as the contractor for a General Construction & Maintenance project with the project number STDF-2026-9.

The scope of work involves painting interior offices, with a total of 143 man hours. The quotation breaks down costs into direct labor ($1,100.00), equipment and materials ($0.00), and subcontractor costs ($13,800.00), resulting in a total quotation of $14,900.00. The project is for UNL Stadium Inside Paint, with the contractor's quote dated 7/22/2025. The quotation includes overhead and profit percentages, and no additional equipment or material costs are specified. The document is prepared as an exhibit for a project addendum, with the contractor's signature and date of 07/24/2025.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .