This document is a Unit Price Quotation from the University of Nebraska for a construction project at the Lincoln Campus. The project, identified as STDF-2026-10, involves the University of Nebraska (NU) in the Southeast region, with the contractor being Arrowhead Construction located in Seward, Nebraska. The document is dated 7/22/2025 and references RFP No. 3900-24-7200.

The scope of work involves painting Memorial Stadium stairs and railing, estimated at 143 man hours. The total quotation is $14,900.00, broken down into $1,100.00 for direct labor costs, $0.00 for equipment and material costs, and $12,000.00 for subcontractor costs (specifically for PAXTON). The quotation includes overhead and profit margins, with the subcontractor costs including a 15.00% markup. The document indicates an anticipated completion date, though specific details are partially obscured, and was submitted on 7/24/2025 at 12:06 CDT.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .