Appendix C___Rainbow Gulch.pdf
PDF 220 KB Posted
- Attached to
- Rainbow Gulch IRSC Federal contract opportunity
- Solicitation number
- 1282BH20R4002
About this file
This document contains specifications for a stewardship contract to perform forest management services on the Pike and San Isabel National Forests in Colorado. The contract involves reducing wildfire risk through mechanical thinning, pile burning, and mastication to move forest stands closer to historical conditions. Additional work includes non-commercial thinning, piling and removal of fuels, removal and decking of sawtimber and non-sawtimber, and road maintenance. The project is located approximately 6 miles northeast of Woodland Park, Colorado, encompassing sections 27, 28, 29, 33, 34 and 34 in Township 11 South, Range 68 West. Specifications include requirements for ditch cleaning, surface blading, drainage structures, roadway vegetation removal, miscellaneous structures, and drainage excavation work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00002___Rainbow Gulch.pdf | ||
| Solicitation - A00002 - 1282BH20R4002___Rainbow Gulch.docx | DOCX document | |
| Map 3 of 4___Rainbow Gulch.pdf | ||
| Map 1 of 4___Rainbow Gulch.pdf | ||
| A00001___Rainbow Gulch.pdf | ||
| Map 4 of 4___Rainbow Gulch.pdf | ||
| Map 2 of 4___Rainbow Gulch.pdf | ||
| Wage Determination - SCA - Forestry.pdf | ||
| Appendix B___Rainbow Gulch.pdf | ||
| Wage Determination - SCA - Laborer.pdf | ||
| Solicitation - 1282BH20R4002___Rainbow Gulch.docx | DOCX document | |
| Appendix A___Rainbow Gulch.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rainbow Gulch IRSC Page 1 of 10
Pike and San Isabel NFs APPENDIX C Pikes Peak RD
Appendix C
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE-HAUL (if awarded)
Termini Applicable Road Maintenace Specifications
Road From To Miles T-800 T-802 T-803 T-805 T-807 T-808 T-814
NFSR 300
JCT w/the entrance to Springdale Campground
South to temporary road in Unit 1
2.80 C
O C O
C O
C O
C O
C O
POST-HAUL
Termini Applicable Road Maintenace Specifications
Road From To Miles T-800 T-802 T-803 T-805 T-808 T-814
NFSR 300
JCT w/the entrance to Springdale Campground
South to temporary road in Unit 1
2.80 C C C C C
C = Contractor Performance Item O = Optional Performance Item NFSR = National Forest Service Road JCT = Junction
T-SPECIFICATIONS
T-SPEC NUMBER SPECIFICATION TITLE PAGE
T-800 Definitions 2-4 T-802 Ditch Cleaning 5 T-803 Surfacing Blading 6 T-805 Drainage Structures 7 T-807 Roadway Vegetation (Pre-Haul only / if awarded) 8 T-808 Miscellaneous Structures 9 T-814 Drainage Excavation 10
Rainbow Gulch IRSC Page 2 of 10
T-800-1
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows:
800-1.1—Agreement—Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2—Annual Road Maintenance Plan—A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3—Base Course—Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4—Berm—Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5—Borrow—Select Material taken from designated borrow sites.
800-1.6—Clearing Limits—The limits of clearing as designated on the ground or on the drawings.
800-1.7—Crown, Inslope, and Outslope—The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.8—Culverts—A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.9—Drainage Dip—A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.10—Drainage Structures—Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts and the like.
800-1.11—Dust Abatement Plan—A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.12—Lead-off Ditches—A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.13 —Material—Any substances specified for use in the performance of the work.
800-1.14—Pre-haul Maintenance—Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Contractor's use, provided Contractor's operations do not damage improvements in Section H.21 of the contract/solicitation or National Forest resources and hauling can be done safely. This work will be shown in the above Road Maintenance Requirements.
Pre-haul Maintenance work the Contractor elects to perform will be in compliance with the Road Maintenance T- Specifications.
Rainbow Gulch IRSC Page 3 of 10
T-800-2
800-1.15—Right-of-Way—A general term denoting:
(1) The privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or
(2) Land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway.
800-1.16—Roadbed—The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.17—Road Maintenance Requirements—A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.
800-1.18—Roadside—A general term denoting the area adjoining the outer edge of the Roadway.
800-1.19—Roadway—The portion of a road within the limits of excavation and embankment.
800-1.20—Shoulder—That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.21—Slide—A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated ravelling.
800-1.22—Slough—Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.23—Slump—A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.24—Special Project Specifications—Specifications which detail conditions and requirements peculiar to the individual project.
800-1.25—Subgrade—Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.26—Surface Course—The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.27—Surface Treatment Plan—A table which lists the roads and surface treatments to be applied.
800-1.28—Traveled Way—That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.29—Turnouts—That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.30—Water Source—A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.31—Waterbar—A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway.
A Waterbar is not designed to be traversable by logging trucks.
Rainbow Gulch IRSC Page 4 of 10
T-800-3
ILLUSTRATION OF ROAD STRUCTURE TERMS
Rainbow Gulch IRSC Page 5 of 10
T-802
SPECIFICATION T-802 DITCH CLEANING
DESCRIPTION:
1.1— Ditch cleaning is removing and disposing of all Slough Material and other debris from Roadway ditches, including outlet and lead-off ditches, to provide a free-draining waterway.
REQUIREMENTS:
3.1— Ditch cleaning to facilitate proper drainage.
3.2— All Slough Material or other debris which might obstruct water flow in the Roadway ditch shall be removed.
Material removed from the ditch, if suitable, may be blended into existing native road surface or Shoulder or placed in designated Berms in conjunction with Surface Blading T-803 operations.
Material removed from ditches that is not by Agreement blended into existing roads or placed in Berms shall be loaded and hauled to the disposal site designated by the Forest Service.
3.3— Roadway backslope or Berm shall not be undercut.
Rainbow Gulch IRSC Page 6 of 10
T-803
SPECIFICATION T-803 SURFACE BLADING
DESCRIPTION:
1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes returning the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder;
repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
REQUIREMENTS:
3.1—Surface blading shall be performed before (if awarded), and after Contractor's use as often as necessary to facilitate traffic and proper drainage.
3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3—Water, taken from Water Sources designated on Contract Area Map, shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.
3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.
3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.
3.6—Drainage Dips and Lead-off Ditches shall be cleaned to reasonably blend with existing line, grade, and cross-section.
3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 —Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way.
Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting.
Sidecasting into streams, lakes, or water courses will not be permitted.
3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance (if awarded).
Rainbow Gulch IRSC Page 7 of 10
T-805
SPECIFICATION T-805 DRAINAGE STRUCTURES
DESCRIPTION:
1.1—This work consists of preserving Drainage Structures and related items such as conveyor belt water deflectors, inlet and outlet channels, existing riprap, trash racks, and drop inlets.
MATERIALS:
2.1—All Materials used to preserve Drainage Structures shall conform by type and specification to the Material in the structure being maintained.
REQUIREMENTS:
3.1—Drainage Structures and related items shall be cleared of all foreign Material which has been deposited above the bottom of the structure and all vegetative growth which interferes with the flow pattern. Material removed that cannot be incorporated into surface blading shall be hauled to a disposal site designated by the Forest Service.
3.2—If outlet or inlet riprap was installed by Contractor, or existed prior to Contractor’s haul, it shall be preserved in good condition including the replacement of riprap if necessary to previous line, grade and cross-section.
3.3—Insure the proper functioning of the head walls, aprons, inlet assemblies, overside drains, riprap, trash racks, and other facilities related to the Drainage Structure.
Rainbow Gulch IRSC Page 8 of 10
T-807
SPECIFICATION T-807 ROADWAY VEGETATION
Applies only to pre-haul, if awarded
DESCRIPTION:
1.1—This work consists of cutting vegetative matter including brush and trees from within the Roadway limits.
REQUIREMENTS:
3.1—Remove all vegetative matter from Roadbed and ditch for a minimum Roadbed width of 12 feet and ditch with of 3 feet. Roadbed width includes extra width for curve widening and turnouts. Cut trees and brush parallel to a maximum height of 1 inch above the ground. All limbs which extend over the Roadbed or ditch within 14 feet above the road elevation shall be removed. Tree limbs shall be trimmed as near flush with the trunk as practicable or to within 12 inches from the tree.
3.2—Remove all vegetative matter less than 4 inches in diameter for 2 feet from road shoulder on each side of the road, including ditch section. Cut trees and brush outside the Roadbed and ditch to a maximum height of 6 inches above the ground surface.
3.3—Remove all vegetative matter from Roadway which interferes with rolling dip or culvert drainage, road maintenance operations such as surface blading and ditch cleaning, and on curves and intersections where sight distance is impeded.
3.4—Vegetative matter removed from the Roadway in excess of 1 foot in length or 3 inches in diameter shall be scattered outside the Roadway to a depth less than 18 inches above the ground.
3.5—Vegetative matter shall not be placed in live streams or drainages.
Rainbow Gulch IRSC Page 9 of 10
T-814
SPECIFICATION T-808 MISCELLANEOUS STRUCTURES
DESCRIPTION:
1.1—Preservation of miscellaneous structures includes cattleguards, gates, and other similar structures that have been previously installed to insure safe and efficient operation of the road.
MATERIALS:
2.1—Any materials needed in the preservation of miscellaneous structures shall be similar in type and quality to the material in the structure being preserved.
REQUIREMENTS:
3.1—Cattleguards. Loose rails shall be welded or bolted back in place.
Excess material carried into the cattleguard shall be removed when drainage is blocked or when it reaches 6 inches from the bottom of the cattleguard frame. Drainage into and from the cattleguard shall be kept open.
3.2—Gates. Gates shall be kept in good repair and made to swing easily. Hinges or latches shall be repaired if not operating properly.
Brush and debris shall be removed from within the swinging radius.
Rainbow Gulch IRSC Page 10 of 10
T-814
SPECIFICATION T-814 DRAINAGE EXCAVATION
DESCRIPTION:
1.1—This work shall consist of excavation and shaping of roadway drainage structures to drain freely including rolling dips, grade dips, roadway ditches, lead-off ditches, and catch basins.
Any clearing or grubbing necessary to accomplish the drainage excavation is consicidered incidental to the pay item.
REQUIRMENTS:
3.1—Cleaning and Grubbing. All trees, stumps, roots, and other protruding vegetative material shall be cleared from drainage. Trees shall be cut into lengths not to exceed 5 feet and all limbs removed. Logs, slash, and stumps shall be scattered outside the drainage or as directed by the Forest Service.
3.2—Excavation. Drainage structures shall be excavated and shaped to a depth and width to provide drainage in conformity with the line grades and cross sections as shown on the Illustration of Road Structure Terms drawing (page 4) at locations designated on the ground.
Hand work may be necessary to obtain a smooth surface and uniforn cross section.
Lead-off ditches shall be provided for a distance necessary to drain unless otherwise approved by the Forest Service.
roadside ditches shall be free draining.
Material removed if suitable, shall be blended into the existing native road surface or shoulders. Unsuitable material shall be spread evenly and not heaped against existing vegetation.
Large rocks encountered during during excavation of drainage structures that inerfere with the lines and grades of the structure shall be removed, when practical and placed so that they will not roll or obstruct the use and maintenance of the roadway or moved to locations approved by the Forest Service.
MEASUREMENT:
1.1—Drainage dip and catch basin measurement will be the number of each item completed and accepted.
Roadside ditches and lead-off ditches will be measured by linear measurement, horizontally along the centerline of the ditch.
File details come from the government source that posted it. Updated .