Appendix A___Rainbow Gulch.pdf
PDF 140 KB Posted
- Attached to
- Rainbow Gulch IRSC Federal contract opportunity
- Solicitation number
- 1282BH20R4002
About this file
This document outlines the requirements for a service contract to conduct forest management work on the Rainbow Gulch Integrated Resource Stewardship Contract project area. The contract involves six tasks: leave tree mark thinning in various units, decking of products in one unit, designation thinning by species and diameter in one unit, manual cutting in several units, and road maintenance. The work will reduce wildfire risk and move the forest landscape toward a more ecologically resilient condition by thinning stands, piling and burning slash, and utilizing timber products. The project is located on the Pike and San Isabel National Forests approximately six miles northeast of Woodland Park, Colorado, encompassing several sections within two townships and ranges.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00002___Rainbow Gulch.pdf | ||
| Solicitation - A00002 - 1282BH20R4002___Rainbow Gulch.docx | DOCX document | |
| Map 3 of 4___Rainbow Gulch.pdf | ||
| A00001___Rainbow Gulch.pdf | ||
| Map 4 of 4___Rainbow Gulch.pdf | ||
| Map 2 of 4___Rainbow Gulch.pdf | ||
| Map 1 of 4___Rainbow Gulch.pdf | ||
| Solicitation - 1282BH20R4002___Rainbow Gulch.docx | DOCX document | |
| Appendix C___Rainbow Gulch.pdf | ||
| Wage Determination - SCA - Forestry.pdf | ||
| Appendix B___Rainbow Gulch.pdf | ||
| Wage Determination - SCA - Laborer.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rainbow Gulch IRSC Page 1 of 3
Pike and San Isabel NF APPENDIX A Pikes Peak RD
Appendix A
TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS
ACTIVITY ITEMS – TASK DESCRIPTIONS:
Task 1 – Leave Tree Mark Units (LTM):
Trees not meeting the Utilization Standards in Appendix B, Division A.2, listed as LTM on the Contract Area Map and listed below, are designated for cutting, Trees to be left uncut are marked above and below stump height in orange paint.
Mechanized product removal units; may include the use of manual and/or ground-based equipment.
Applies to CLIN 0001
LEAVE TREE MARK (LTM) SPECIFICATIONS
UNIT TYPE REQUIREMENTS
1, 3, 4, 6, 8, 10, 16, 22
Non-Sawtimber Dead
5.0 to 7.9 inches DBH shall be cut, yarded, and piled;
Includes Aspen
Biomass Live
1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;
Excludes Ponderosa Pine and Aspen
Biomass Dead
1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;
Includes Aspen
Slash See Section H.23 in the contract
Task 2 – Leave Tree Mark Units (LTM):
Trees not meeting the Utilization Standards in Appendix B, Division A.2, listed as LTM on the Contract Area Map and listed below, are designated for cutting, Trees to be left uncut are marked above and below stump height in orange paint.
Mechanized product removal units; may include the use of manual and/or ground-based equipment.
Applies to CLIN 0002
LEAVE TREE MARK (LTM) SPECIFICATIONS
UNIT TYPE REQUIREMENTS
Non-Sawtimber Dead
5.0 to 7.9 inches DBH shall be cut, yarded, and decked;
Includes Aspen
Biomass Live
1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;
Excludes Ponderosa Pine and Aspen
Biomass Dead
1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;
Includes Aspen
Rainbow Gulch IRSC Page 2 of 3
Task 3 – Deck:
Applies to CLIN 0003
DECKING SPECIFICATIONS
UNIT TYPE REQUIREMENTS
Sawtimber and Non-Sawtimber
Deck all Sawtimber and Non-Sawtimber meeting the Utilization Standards in Appendix B, Division A.2
Task 4 – Designation by Species and Diameter Units (DxSD):
Mechanized product removal units; may include the use of manual and/or ground-based equipment.
Applies to CLIN 0004
DESIGNATION BY SPECIES AND DIAMETER (DxSD) SPECIFICATIONS
UNIT TYPE REQUIREMENTS
Biomass
Live
1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;
Excludes Aspen
Task 5 – Manual Cut Units:
Hand treatment product removal.
Applies to CLIN 0005.
MANUAL CUT UNIT SPECIFICATIONS
UNIT TYPE REQUIREMENTS
2, 4A, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 18, 20, 21
Non-Sawtimber Live
5.0 inches to 9.9 inches DBH for Douglas Fir, Ponderosa Pine, and Limber Pine;
5.0 inches to 6.9 inches DBH for Lodgepole Pine;
5.0 inches to 7.9 inches DBH for Englemann and Blue Spruce;
Excludes Aspen
2, 4a, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 19, 20, 21
Non-Sawtimber Dead
5.0 inches to 9.9 inches DBH;
Includes Aspen
2, 5, 7, 15, 17, 18 Biomass
Live
1.0 foot tall or 4.9 inches DBH (and anything in-between);
Excludes Ponderosa Pine and Aspen
4A, 9, 9A, 12, 14, 19, 20, 21
Biomass Live
1.0 foot tall or 4.9 inches DBH (and anything in-between);
Excludes Aspen
2, 4A, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 19, 20, 21
Biomass Dead
1.0 foot tall or 4.9 inches DBH (and anything in-between);
Includes Aspen
2, 4a, 5, 7, 9, 9a, 12, 14, 15, 17, 18, 19, 20, 21
Task 6 – Road Maintenance:
Applies to CLIN 0006.
Road Maintenance in accordance with Appendix C.
Rainbow Gulch IRSC Page 3 of 3
UNIT REQUIREMENTS
UNIT ACRES TASK
1 21 Task 1 Leave Tree Mark (LTM), pile; Slash 2 6 Task 5 Hand Treatment; slash 3 3 Task 1 Leave Tree Mark (LTM), pile; Slash 4 9 Task 1 Leave Tree Mark (LTM), pile; Slash
4A 3 Task 5 Hand Treatment; slash 5 3 Task 5 Hand Treatment; slash 6 11 Task 1 Leave Tree Mark (LTM), pile; Slash 7 5 Task 5 Hand Treatment; slash 8 43 Task 1 Leave Tree Mark (LTM), pile; Slash 9 5 Task 5 Hand Treatment; slash
9A 7 Task 5 Hand Treatment; slash 10 12 Task 1 Leave Tree Mark (LTM), pile; Slash 11 36 Task 4 Designation by Species and Diameter; Slash 12 22 Task 5 Hand Treatment; slash 13 19 Task 2 and 3 Leave Tree Mark (LTM), deck; Slash 14 138 Task 5 Hand Treatment; slash 15 50 Task 5 Hand Treatment; slash 16 177 Task 1 Leave Tree Mark (LTM), pile; Slash 17 9 Task 5 Hand Treatment; slash 18 16 Task 5 Hand Treatment; slash 19 14 Task 5 Hand Treatment; slash 20 7 Task 5 Hand Treatment; slash 21 11 Task 5 Hand Treatment; slash 22 22 Task 1 Leave Tree Mark (LTM), pile; Slash
File details come from the government source that posted it. Updated .