Appendix A___Rainbow Gulch.pdf

PDF 140 KB Posted

Attached to
Rainbow Gulch IRSC Federal contract opportunity
Solicitation number
1282BH20R4002
Issued by
Department of Agriculture Forest Service R2-Rocky Mountain Region

About this file

This document outlines the requirements for a service contract to conduct forest management work on the Rainbow Gulch Integrated Resource Stewardship Contract project area. The contract involves six tasks: leave tree mark thinning in various units, decking of products in one unit, designation thinning by species and diameter in one unit, manual cutting in several units, and road maintenance. The work will reduce wildfire risk and move the forest landscape toward a more ecologically resilient condition by thinning stands, piling and burning slash, and utilizing timber products. The project is located on the Pike and San Isabel National Forests approximately six miles northeast of Woodland Park, Colorado, encompassing several sections within two townships and ranges.

View the file

Other files for this federal contract opportunity

Other files attached to Rainbow Gulch IRSC, newest first.
File Type Posted
A00002___Rainbow Gulch.pdf PDF
Solicitation - A00002 - 1282BH20R4002___Rainbow Gulch.docx DOCX document
Map 3 of 4___Rainbow Gulch.pdf PDF
A00001___Rainbow Gulch.pdf PDF
Map 4 of 4___Rainbow Gulch.pdf PDF
Map 2 of 4___Rainbow Gulch.pdf PDF
Map 1 of 4___Rainbow Gulch.pdf PDF
Solicitation - 1282BH20R4002___Rainbow Gulch.docx DOCX document
Appendix C___Rainbow Gulch.pdf PDF
Wage Determination - SCA - Forestry.pdf PDF
Appendix B___Rainbow Gulch.pdf PDF
Wage Determination - SCA - Laborer.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rainbow Gulch IRSC Page 1 of 3

Pike and San Isabel NF APPENDIX A Pikes Peak RD

Appendix A

TECHNICAL SPECIFICATIONS FOR SERVICE WORK ITEMS

ACTIVITY ITEMS – TASK DESCRIPTIONS:

Task 1 – Leave Tree Mark Units (LTM):

Trees not meeting the Utilization Standards in Appendix B, Division A.2, listed as LTM on the Contract Area Map and listed below, are designated for cutting, Trees to be left uncut are marked above and below stump height in orange paint.

Mechanized product removal units; may include the use of manual and/or ground-based equipment.

Applies to CLIN 0001

LEAVE TREE MARK (LTM) SPECIFICATIONS

UNIT TYPE REQUIREMENTS

1, 3, 4, 6, 8, 10, 16, 22

Non-Sawtimber Dead

5.0 to 7.9 inches DBH shall be cut, yarded, and piled;

Includes Aspen

Biomass Live

1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;

Excludes Ponderosa Pine and Aspen

Biomass Dead

1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;

Includes Aspen

Slash See Section H.23 in the contract

Task 2 – Leave Tree Mark Units (LTM):

Trees not meeting the Utilization Standards in Appendix B, Division A.2, listed as LTM on the Contract Area Map and listed below, are designated for cutting, Trees to be left uncut are marked above and below stump height in orange paint.

Mechanized product removal units; may include the use of manual and/or ground-based equipment.

Applies to CLIN 0002

LEAVE TREE MARK (LTM) SPECIFICATIONS

UNIT TYPE REQUIREMENTS

Non-Sawtimber Dead

5.0 to 7.9 inches DBH shall be cut, yarded, and decked;

Includes Aspen

Biomass Live

1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;

Excludes Ponderosa Pine and Aspen

Biomass Dead

1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;

Includes Aspen

Rainbow Gulch IRSC Page 2 of 3

Task 3 – Deck:

Applies to CLIN 0003

DECKING SPECIFICATIONS

UNIT TYPE REQUIREMENTS

Sawtimber and Non-Sawtimber

Deck all Sawtimber and Non-Sawtimber meeting the Utilization Standards in Appendix B, Division A.2

Task 4 – Designation by Species and Diameter Units (DxSD):

Mechanized product removal units; may include the use of manual and/or ground-based equipment.

Applies to CLIN 0004

DESIGNATION BY SPECIES AND DIAMETER (DxSD) SPECIFICATIONS

UNIT TYPE REQUIREMENTS

Biomass

Live

1.0 foot tall or 4.9 inches DBH (and anything in-between) shall be cut, yarded, and piled;

Excludes Aspen

Task 5 – Manual Cut Units:

Hand treatment product removal.

Applies to CLIN 0005.

MANUAL CUT UNIT SPECIFICATIONS

UNIT TYPE REQUIREMENTS

2, 4A, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 18, 20, 21

Non-Sawtimber Live

5.0 inches to 9.9 inches DBH for Douglas Fir, Ponderosa Pine, and Limber Pine;

5.0 inches to 6.9 inches DBH for Lodgepole Pine;

5.0 inches to 7.9 inches DBH for Englemann and Blue Spruce;

Excludes Aspen

2, 4a, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 19, 20, 21

Non-Sawtimber Dead

5.0 inches to 9.9 inches DBH;

Includes Aspen

2, 5, 7, 15, 17, 18 Biomass

Live

1.0 foot tall or 4.9 inches DBH (and anything in-between);

Excludes Ponderosa Pine and Aspen

4A, 9, 9A, 12, 14, 19, 20, 21

Biomass Live

1.0 foot tall or 4.9 inches DBH (and anything in-between);

Excludes Aspen

2, 4A, 5, 7, 9, 9A, 12, 14, 15, 17, 18, 19, 20, 21

Biomass Dead

1.0 foot tall or 4.9 inches DBH (and anything in-between);

Includes Aspen

2, 4a, 5, 7, 9, 9a, 12, 14, 15, 17, 18, 19, 20, 21

Task 6 – Road Maintenance:

Applies to CLIN 0006.

Road Maintenance in accordance with Appendix C.

Rainbow Gulch IRSC Page 3 of 3

UNIT REQUIREMENTS

UNIT ACRES TASK

1 21 Task 1 Leave Tree Mark (LTM), pile; Slash 2 6 Task 5 Hand Treatment; slash 3 3 Task 1 Leave Tree Mark (LTM), pile; Slash 4 9 Task 1 Leave Tree Mark (LTM), pile; Slash

4A 3 Task 5 Hand Treatment; slash 5 3 Task 5 Hand Treatment; slash 6 11 Task 1 Leave Tree Mark (LTM), pile; Slash 7 5 Task 5 Hand Treatment; slash 8 43 Task 1 Leave Tree Mark (LTM), pile; Slash 9 5 Task 5 Hand Treatment; slash

9A 7 Task 5 Hand Treatment; slash 10 12 Task 1 Leave Tree Mark (LTM), pile; Slash 11 36 Task 4 Designation by Species and Diameter; Slash 12 22 Task 5 Hand Treatment; slash 13 19 Task 2 and 3 Leave Tree Mark (LTM), deck; Slash 14 138 Task 5 Hand Treatment; slash 15 50 Task 5 Hand Treatment; slash 16 177 Task 1 Leave Tree Mark (LTM), pile; Slash 17 9 Task 5 Hand Treatment; slash 18 16 Task 5 Hand Treatment; slash 19 14 Task 5 Hand Treatment; slash 20 7 Task 5 Hand Treatment; slash 21 11 Task 5 Hand Treatment; slash 22 22 Task 1 Leave Tree Mark (LTM), pile; Slash

File details come from the government source that posted it. Updated .