Appendix_A(South)_-_PIF_Drafts.pdf
PDF 1 MB Posted
- Attached to
- FY24_PSA_SOUTH Federal contract opportunity
- Solicitation number
- 140P4324Q0029
About this file
This document is a Project Scoping Assessment (PSA) for the National Park Service (NPS) Interior Region 1. The PSA is being conducted for three different National Park units: First State National Historic Park, Minute Man National Historic Park, and Shenandoah National Park.
For First State National Historic Park, the assessment will include a comprehensive rehabilitation assessment of the exterior envelope, interior, and site for the Ranger Station and Maintenance Complex. For Minute Man National Historic Park, the assessment will focus on evaluating the existing park-wide wireless structural fire/intrusion alarm and video mesh network system. For Shenandoah National Park, the assessment will examine the exterior and interior plumbing and electrical systems of 8 historic buildings in the Big Meadows Developed Area.
The PSA will define project scopes, develop cost estimates, and compile technical information for the parks to use in developing future Project Management Information System (PMIS) project submissions. The NPS has provided detailed scope statements, asset information, and other supporting details to guide the assessments. The results of the PSAs are expected to yield high priority, design-ready projects that can be quickly executed upon funding approval.
View the file
Other files for this federal contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix A
Interior Region 1
National Park Service (NPS)
US Department of the Interior
Project Scoping Assessment ‐ Project Information Form (PIF)
BACKGROUND INFORMATION
The goal of this program is to conduct Project Scoping Analyses (PSAs) for high priority National Park Service (NPS) facilities. The NPS Units chosen for this PSA effort have identified the need for assistance in developing sound facilities projects at specific locations within the NPS Unit. The locations were chosen based on previous review and assessment at the Unit‐level that yielded a solid understanding of the problem and possible solutions.
An Architecture and Engineering firm (A/E) contracted by NPS Region 1 will perform condition assessments, define/refine project scopes, develop cost estimates, and identify technical information to be compiled into a final report. This essential report will be used by the unit to develop Project Management Information System (PMIS) project submissions.
The PSA effort will yield high quality, high priority, design‐ready projects that will be able to be quickly executed upon authorization and funding identification. This work will support the NPS mission and reduce NPS’s deferred maintenance backlog.
This document will be used as a checklist for the region/park and A/E to coordinate throughout the lifecycle of the PSA. The information below will help all parties involved be successful.
A/E will submit PIF form with each level of effort/standard communication form to ensure alignment with agreed upon scope.
PARK INFORMATION
DOI Region: 1
Legacy Region: Northeast (NER)
Park: First State National Historic Park FRST
PROJECT INFORMATION
Project Title: Conduct comprehensive assessment of Ranger Station and Maintenance Complex.
Project Description: Provide full assessment of ranger station and Maintenance complex for complete rehabilitation to meet the current standard which includes, but not limited to building, parking, and site water erosion.
Problem Statement and Justification (How did the park identify the need for this work – assessment?) (Why does this work need to be done? Why is it priority? Why now?)
Ranger station and maintenance complex structures and site are in poor condition and requires extensive exterior envelope assessed for rehabilitation to address defer maintenance issues as well as safety concerns. Structures were built over the years by previous owner with various methods and materials and has been showing signs of poor craftsmanship and deterioration. Exterior envelope has been repaired multiple times to correct water intrusion over the years but wasn’t able to address as a permanent solution. The exterior equipment doors on the Maintenance Barn are past their life cycle. Both doors (the Hangar style and Overhead door) are failing and have been "piece‐meal" repaired, thus they require either complete restoration or replacement. Current parking and driveway conditions are poor and drainage concerns that causes safety issue. There are multiple cracks and potholes and due to settling, parking lot and driveway is not level which cause erosion issue and run off. Existing lighting over the parking area/maintenance yard is inadequate and does not provide sufficient illumination to all points of the parking area which causes safety and securing.
issue. Parking lot must accommodate large maintenance equipment parking load.
PSA Scope Statement (Park, Region, and A/E should discuss the limits of this work, what is included and not. Be as specific as possible/quantify as much as possible.
Assess existing conditions as indicated below, review and validate NPS‐provided scope, and provide a scope of work with a Class C cost estimate. The cost estimate should include design, permitting and compliance, purchase, and installation, as well as removal and appropriate disposal of old components or rehabilitation of disturbed areas. All quantities and scope provided here are preliminary and must be verified by the A/E team.
Assessments shall consider local environmental conditions and climate change projections to make recommendations to 1) reduce frequency of future maintenance, 2) increase the life expectancy of the assets/locations, and 3) increase overall sustainability and resilience of the assets/locations, including increased energy efficiency and reduction of greenhouse gas emissions.
Assessments should address deferred maintenance solutions while suggesting improvements that will reduce the costs associated with operating and maintaining the park.
Assessments should note physical barriers to accessibility and observed accessibility concerns. A complete ABAAS Accessibility Assessment is not included.
For roof system inspections, the A/E Contractor is required to coordinate with the Interior Region 1 Safety Officer so that a safety plan for roof access can be developed prior to the first site visit. The A/E Contractor will be required to always adhere to this safety plan.
All design recommendations must include, where applicable, historically appropriate, code‐compliant materials and design techniques. All renovations shall follow procedures set forth in the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
The scope of services for this project includes the assessments listed below (but not limited to):
Comprehensive rehabilitation assessment of exterior envelop.
- Windows and doors and it’s opening.
- Roofing system
- Exterior wall system
Comprehensive assessment of interior
- Interior structure, finishes, built‐in work surface, flooring.
- MEP
- Life Safety
Comprehensive site assessment
- Parking lot and driveway surface
- Water erosion control
- Site lighting
FMSS Locations for this PSA
Location
Location Description
Asset Code
OB API FCI CRV DM&R Ranking UM QTY YEAR
HISTORIC
STATUS
244528 Detached Garage
4100 3 25 0.419 108,536.62 45,512.70 POOR GSF 863.00 1900 N
248091 Barn 4100 1 40 1.050 646,054.15 678,354.73 SERIOUS GSF 1,380.00 1900 N
255932 Headquarters Parking Area
4100 2 90 .308 85,140.01 26,254.30 POOR GSF 5,164.00 1900 N
Existing PMIS Entries Related to this PSA for Reference
PMIS # Title & Description Status Budget Formulated Funded
252711
Rehabilitation of Ranger Station and
Maintenance facilities at 400 Ramsey Road
FY26
Requested $104,089.34 FY 26 N/A
Additional Data for Reference [Park Documents? eTic Documents?]
The Secretary of the Interior’s Standards—Technical Preservation Services, National Park Service (nps.gov)
Climate Change Vulnerability Assessment (if available)
NPS Cultural Resources Climate Change Strategy (2016)
List of Maintenance Backlog Work Categories to be Evaluated under this PSA (not all work categories will be needed for each PSA – use only the categories that are needed based on PSA Scope Statement) Buildings and Ancillary Structures
1. Roofing and Stormwater Shedding Systems: Roof system, flashing, gutters, downspouts, venting, roofing features
2. Building Exterior Envelope (all): Siding, windows, doors, facia, trim, soffits, finishes, foundations, basement
3. Masonry: Foundation, chimney, steps, exterior veneers, driveway, concrete floors/ walks, basements
4. Interior Finishes: Paint, Drywall/plaster walls and ceilings, paint, trim, flooring and floor coverings, interior fixtures
5. Mechanical and Utility Systems: Electrical, emergency power generation, potable water supply, plumbing and piping, wastewater/sanitary sewer, storm sewer, HVAC, communications and IT signaling, lightning protection, fuel storage and supply (underground heating fuel tank size and age determination for life cycle replacement 50% usable life)
6. Life Safety Fire Detection/ Fire Suppression Systems: Standpipe, fire pump, system type, detection equipment, intrusion systems, size, and age determination for life cycle replacement 50% usable life.
7. Accessibility: Observed physical barriers, walkways, clearances, entrances, grade, slope (PSA is not an Accessibility Assessment)
8. Potential hazardous materials remediation issues interior and exterior: Observed mold, asbestos, lead (PSA is not an environmental assessment).
9. Vertical transportation systems of all types, interior and exterior
Maintained Landscapes
10. Grounds: Grades, drainage and stormwater management, vegetation, turf grass, walkways, signage, fence/gates, transportation routes, ingress/egress and parking, site lighting, trails, pedestrian and vehicular bridges, site furnishings
SCOPE SIGN‐OFF (By typing your name, you are agreeing to the above scope.)
Region: (COR/Project Manager)
Park: (Supt. Or Chief of Maintenance)
KEYS TO SUCCESS
Scope must be signed‐off on by all parties prior to visit. The A/E will not scope additional projects outside of the originally agreed upon scope once on site.
Park specific documents will be key to visit success. Many documents are not housed in Electronic Technical Information Center (eTIC). Provide A/E with as much project relevant information as you can prior to the visit.
Project tour Point of Contact (POC) must be briefed or very knowledgeable about project.
Work with A/E to establish report deadlines at closeout meeting.
Adhere to deadlines. Once A/E delivers report, the region/park will have 15 days to review/comment.
Final report will be produced 15 days after comments are submitted to A/E firm.
Create/modify PMIS Statement using Approved Final Report.
KEY PROJECT PERSONNEL NAME PHONE EMAIL
Park POC: FACILITY MGR or SUPT
A/E POC:
Region Project Mgr:
Project Specialist POC:
SCHEDULE
Pre‐Site Visit Telecon Date:
Site Visit Dates:
Out Brief Meeting Date/Time:
SITE LOGISTICS
Project Tour POC:
Site Visit Schedule (provide a general schedule for A/E):
Special access or equipment needs:
PARK ACTION ITEMS
☐Confirm description of PMIS Project is still accurate/valid.
☐Supporting Documentation – As‐Builts, drawings, maps, photos, previous conditions assessments, relevant studies: asbestos, lead‐based‐paint, HazMat, Geotech, Historic Structure Report, Cultural Landscape Report, FMSS Data – Asset Locations, Asset Details, and Work Orders etc. Any type of plan that has already been developed for the park, what is the driving master plan for the park.
☐Project Site Walk‐through – Devote time/personnel to walk the facility/site and meet with PSA team during assigned week.
☐Meeting Space (Outdoor, open air meeting space with enough room for a minimal staff PSA team).
Conference room or workspace to meet as a team with Supt, FM, appropriate personnel during site visit. Kick off and close out will be done online.
☐Lodging recommendations
☐Lunch recommendations – Will the team need to bring in?
REPORTS
Draft Report Delivery date: Enter a date
Park Report Review Comments Deadline: Enter a date
Final Report Delivery Date: Enter a date
The goal of this program is to conduct Project Scoping Analyses (PSAs) for high priority National Park Service (NPS) facilities. The NPS Units chosen for this PSA effort have identified the need for assistance in developing sound facilities projects at specific locations within the NPS Unit. The locations were chosen based on previous review and assessment at the Unit‐level that yielded a solid understanding of the problem and possible solutions.
An Architecture and Engineering firm (A/E) contracted by NPS Region 1 will perform condition assessments, define/refine project scopes, develop cost estimates, and identify technical information to be compiled into a final report. This essential report will be used by the unit to develop Project Management Information System (PMIS) project submissions.
The PSA effort will yield high quality, high priority, design‐ready projects that will be able to be quickly executed upon authorization and funding identification. This work will support the NPS mission and reduce NPS’s deferred maintenance backlog.
This document will be used as a checklist for the region/park and A/E to coordinate throughout the lifecycle of the PSA. The information below will help all parties involved be successful.
Park: Minute Man National Historic Park MIMA
Project Title: Assess Park Wide Wireless Structural Fire/Intrusion Alarm/Video Mesh NetworkAlarm/Video Mesh Network.
Project Description: Provide assessment of existing wireless mesh network at the park for rehabilitation to meet the federal data security standard which allows for the transmission of security alarm, fire alarm and video data to central station monitoring location via internet protocols.
Rehabilitation of the park wide system will provide data access points at 24 structures, 10 employee/visitor parking lots and North Bridge area.
Problem Statement and Justification (How did the park identify the need for this work – assessment?) (Why does this work need to be done? Why is it priority? Why now?)
The current System was installed in 2010 without proper engineering and installed by inadequate contractor with poor craftsmanship and used outdated equipment. Current outdated system is fragmented into 3 separate individual networks which causes frequent disruptions in service and not all location connections feeds back to a central location which is located at MIMA ranger station as well as OI network. Discontinue copper line support from Verizon and transfer of the lines to new smaller server have led to an increase in office system and increase in repair and troubleshooting house by MIMA staff. Park’s ultimate goal is to upgrade the system to a computer ‐controlled Mesh data network so that communicates through wireless and fiber optic technologies via internet protocols. New system must meet reliable and encompasses communication network that will allow remote security and fire alarm monitoring by Boston National Historic Park TOC and Centralized video monitoring, access, and storage.
PSA Scope Statement (Park, Region, and A/E should discuss the limits of this work, what is included and not. Be as specific as possible/quantify as much as possible.
Assess existing conditions as indicated below, review and validate NPS‐provided scope, and provide a scope of work with a Class C cost estimate. The cost estimate should include design, permitting and compliance, purchase, and installation, as well as removal and appropriate disposal of old components or rehabilitation of disturbed areas. All quantities and scope provided here are preliminary and must be verified by the A/E team.
Assessments shall consider local environmental conditions and climate change projections to make recommendations to 1) reduce frequency of future maintenance, 2) increase the life expectancy of the assets/locations, and 3) increase overall sustainability and resilience of the assets/locations, including increased energy efficiency and reduction of greenhouse gas emissions.
Assessments should address deferred maintenance solutions while suggesting improvements that will reduce the costs associated with operating and maintaining the park.
Assessments should note physical barriers to accessibility and observed accessibility concerns. A complete ABAAS Accessibility Assessment is not included.
For roof system inspections, the A/E Contractor is required to coordinate with the Interior Region 1 Safety Officer so that a safety plan for roof access can be developed prior to the first site visit. The A/E Contractor will be required to always adhere to this safety plan.
All design recommendations must include, where applicable, historically appropriate, code‐compliant materials and design techniques. All renovations shall follow procedures set forth in the Secretary of
Comprehensive assessment of park wide communication line o Communication line from main source to individual locations o Security alarm and video communication line.
o Fire alarm communication line
Location # Location
Description Asset Code
OB API FCI CRV DM&R Ranking UM QTY YEAR
HISTORIC
STATUS
104955 Maintenance Vehicle Parking
1300 3 38 .561 $46,300.88 $25,980.45 SERIOUS GSF 1,893 1959 Not Evaluated
107107 Minute Man Visitor Center
Service Parking
1300 3 38 .201 $119,534.91 $24,0177 POOR GSF 8,421 1935 Not Evaluated
107110 Noah Brooks Paved Parking
1300 3 21 .120 $78,559 $9,440 FAIR GSF 3,339 1974 Not Evaluated
63671 Major John Buttrick House
4100 1 93 .391 $571,870 $287.66 POOR GSF 3,179 1715 Y
63675 Stedman Buttrick House
(ME)
4100 1 78 .126 $11,688,454.45 $1,473730 FAIR GSF 15,600 1911 y
63676 Buttrick Caretakers
Cottage (MS)
4100 3 73 .355 $1,915,810 $679,342 POOR GSF 3,556 1911 y
63961 North Bridge Visitor s Center
Parking
1300 3 48 .114 $570,589 $65,259 FAIR GSF 22,905 1967 Not Evaluated
63963 North Bridge Parking
1300 2 42 .120 $763,844.31 $91,760 FAIR SF 32,157 1929 Y
63971 Elisha Jones House
4100 1 85 .310 $1,759,830 $611,541 POOR GSF 8,510 1644 Y
63979 Wayside House 4100 1 93 .197 $2,953,190 $581,182 POOR GSF 7,126 1716 Y
63984 Wayside Parking
1300 3 48 .284 $$387,980 $110,268 POOR GSF 13,767 1971 Not Evaluated
64056 John Meriam House
4100 1 87 .137 $2,076,212 $284,445 FAIR GSF 4,978 1705 Y
64069 Meriam s Corner Parking
1300 3 35 .113 $308,142 $34,948 FAIR GSF 12,270 1998 Not Evaluated
64084 Farwell Jones House
4100 2 65 .559 $994,720 $556,297 SERIOUS GSF 4,662 1686 y
64102 Samuel Brooks House
4100 1 85 .362 $2,888,895 $1,046,270 POOR GSF 6,093 1692 y
64105 Noah Brooks Tavern
4100 2 75 .461 $3,577,511 $1,648,542 POOR GSF 7,606 1798 y
64108 Rogers Barn 4100 2 70 .367 2,217,739 814,105 POOR GSF 7,028 1937 y
64133 Joshua Brooks Jr. House
4100 2 83 .522 1,064,689 55,770 SERIOUS GSF 2,073 1780 y
64145 Rego House 4100 2 70 .373 2,191,113 817,649 POOR GSF 4,067 1890 y
64153 Ephraim Hartwell Tavern
4100 1 93 .318 2,847,735 905,424 POOR GSF 5,902 1733 Y
64172 Hartwell Parking
1300 4 48 .489 575,501 281,580 POOR SF 51,989 1999 Not Evaluated
64211 Captain William Smith
House
4100 1 87 .358 1,720,149 615,811 POOR GSF 3,562 1693 Y
64228 Minute Man Visitor Center
Parking
1300 3 42 .157 924,671 145,094 POOR SF 50,891 2006 Not Evaluated
64230 Minute Man Visitor Center
(ME)
4100 2 48 .412 3,406,933 1,403,365 POOR GSF 7,024 1976 Not Evaluated
64231 Jacob Whittemore
House
4100 1 93 .568 1,668,522 947,332 SERIOUS GSF 3,455 1717 Y
81641 Noah Brooks Unpaved Parking
1300 3 21 .209 245,989 51,331 POOR SF 49,548 2003 Not Evaluated
PMIS # Title & Description Status Budget Formulated Funded
321120
Rehabilitate Park wide Wireless Structural
Fire/intrusion alarm/video mesh network Completed $488,680 FY 20
FY19 (only for fire suppression)
(nps.gov)
Statement) Buildings and Ancillary Structures
1. Roofing and Stormwater Shedding Systems: Roof system, flashing, gutters, downspouts, venting, roofing features
2. Building Exterior Envelope (all): Siding, windows, doors, facia, trim, soffits, finishes, foundations, basement
3. Masonry: Foundation, chimney, steps, exterior veneers, driveway, concrete floors/ walks, basements
4. Interior Finishes: Paint, Drywall/plaster walls and ceilings, paint, trim, flooring and floor coverings, interior fixtures
5. Mechanical and Utility Systems: Electrical, emergency power generation, potable water supply, plumbing and piping, wastewater/sanitary sewer, storm sewer, HVAC, communications and IT signaling, lightning protection, fuel storage and supply (underground heating fuel tank size and age determination for life cycle replacement 50% usable life)
6. Life Safety Fire Detection/ Fire Suppression Systems: Standpipe, fire pump, system type, detection equipment, intrusion systems, size, and age determination for life cycle replacement 50% usable life.
7. Accessibility: Observed physical barriers, walkways, clearances, entrances, grade, slope (PSA is not an Accessibility Assessment)
8. Potential hazardous materials remediation issues interior and exterior: Observed mold, asbestos, lead (PSA is not an environmental assessment).
9. Vertical transportation systems of all types, interior and exterior
Maintained Landscapes
10. Grounds: Grades, drainage and stormwater management, vegetation, turf grass, walkways, Scope must be signed‐off on by all parties prior to visit. The A/E will not scope additional projects outside of the originally agreed upon scope once on site.
Park specific documents will be key to visit success. Many documents are not housed in Electronic Technical Information Center (eTIC). Provide A/E with as much project relevant information as you can prior to the visit.
Project tour Point of Contact (POC) must be briefed or very knowledgeable about project.
Work with A/E to establish report deadlines at closeout meeting.
Adhere to deadlines. Once A/E delivers report, the region/park will have 15 days to review/comment.
A/E POC:
Site Visit Dates:
☐Supporting Documentation – As‐Builts, drawings, maps, photos, previous conditions assessments, relevant studies: asbestos, lead‐based‐paint, HazMat, Geotech, Historic Structure Report, Cultural Landscape Report, FMSS Data – Asset Locations, Asset Details, and Work Orders etc. Any type of plan that has already been developed for the park, what is the driving master plan for the park.
☐Project Site Walk‐through – Devote time/personnel to walk the facility/site and meet with PSA team during assigned week.
☐Meeting Space (Outdoor, open air meeting space with enough room for a minimal staff PSA team).
Conference room or workspace to meet as a team with Supt, FM, appropriate personnel during site visit. Kick off and close out will be done online.
The goal of this program is to conduct Project Scoping Analyses (PSAs) for high priority National Park Service (NPS) facilities. The NPS Units chosen for this PSA effort have identified the need for assistance in developing sound facilities projects at specific locations within the NPS Unit. The locations were chosen based on previous review and assessment at the Unit‐level that yielded a solid understanding of the problem and possible solutions.
An Architecture and Engineering firm (A/E) contracted by NPS Region 1 will perform condition assessments, define/refine project scopes, develop cost estimates, and identify technical information to be compiled into a final report. This essential report will be used by the unit to develop Project Management Information System (PMIS) project submissions.
The PSA effort will yield high quality, high priority, design‐ready projects that will be able to be quickly executed upon authorization and funding identification. This work will support the NPS mission and reduce NPS’s deferred maintenance backlog.
This document will be used as a checklist for the region/park and A/E to coordinate throughout the lifecycle of the PSA. The information below will help all parties involved be successful.
Park: Shenandoah National Park SHEN
Project Title: Conduct exterior and interior plumbing and electrical assessment of 8 historic Buildings in the Big Meadows Developed Area
Project Description: Provide comprehensive exterior assessment of 8 historic buildings well as electrical and plumbing upgrades to meet current building code. Assessment shall include exterior envelope, loading docks and ramps, porch, plumbing fixtures and electrical panel and circuits upgrade.
Problem Statement and Justification (How did the park identify the need for this work – assessment?) (Why does this work need to be done? Why is it priority? Why now?)
All the buildings in Big Meadow development area are historic and is in poor conditions. Exterior envelope such as sidings and roof are failing, porch, and loading docks are deteriorating where it’s causing safety issues. Windows, louvers, and doors are also deteriorating due to it’s end of life cycle.
Electrical panels and circuits are outdated and needs replace to meet the current standard. Plumbing fixtures are also outdated needs to be upgraded to ABAAS compliance fixtures.
PSA Scope Statement (Park, Region, and A/E should discuss the limits of this work, what is included and not. Be as specific as possible/quantify as much as possible.
Assess existing conditions as indicated below, review and validate NPS‐provided scope, and provide a scope of work with a Class C cost estimate. The cost estimate should include design, permitting and compliance, purchase, and installation, as well as removal and appropriate disposal of old components or rehabilitation of disturbed areas. All quantities and scope provided here are preliminary and must be verified by the A/E team.
Assessments shall consider local environmental conditions and climate change projections to make recommendations to 1) reduce frequency of future maintenance, 2) increase the life expectancy of the assets/locations, and 3) increase overall sustainability and resilience of the assets/locations, including increased energy efficiency and reduction of greenhouse gas emissions.
Assessments should address deferred maintenance solutions while suggesting improvements that will reduce the costs associated with operating and maintaining the park.
Assessments should note physical barriers to accessibility and observed accessibility concerns. A complete ABAAS Accessibility Assessment is not included.
For roof system inspections, the A/E Contractor is required to coordinate with the Interior Region 1 Safety Officer so that a safety plan for roof access can be developed prior to the first site visit. The A/E Contractor will be required to always adhere to this safety plan.
All design recommendations must include, where applicable, historically appropriate, code‐compliant materials and design techniques. All renovations shall follow procedures set forth in the Secretary of
Comprehensive rehabilitation assessment of exterior envelop.
Windows and doors and it’s opening.
Roofing system
Porch and railings, docks.
Plumbing fixtures
Electrical panels and circuits
Location # Location Description Asset Code
OB API FCI CRV DM&R Ranking UM QTY YEAR
HISTORIC
STATUS
002272 BM Vehicle/Equipment Storage bldg
4100 3 58 .313 1,154,971.94 361,937.04 POOR GSF 4,004.00 1939 Y
002274 BM Physical Fitness bldg 4100 4 52 .201 987,244.62 198,542.58 POOR GSF 2,220.00 1939 Y
002276 BM maintenance office 4100 3 55 0.703 1,600,937.22 212,410.45 FAIR GSF 3,600.00 1939 Y
002293 BM Meadows Campground Registration
Station
4100 2 75 .056 267,946.23 15,036.94 GOOD GSF 284 1937 Y
002296 BM Fire Cache bldg 4100 3 42 .062 853,833.18 52,975.29 GOOD GSF 2,134 1966 Not evaluated
002297 BM Pumphouse @ Lewis spring
4100 2 78 .034 71,152.77 2,441.34 GOOD GSF 160 1938 Not evaluated
PMIS # Title & Description Status Budget Formulated Funding Source
314557 B20‐PSA‐Exterior Enclosure Battery Storage Building Completed
313107 B20‐PSA‐Exterior Enclosure Pumphouse FY24 $43,822,695 FY24
188011
Paint Exterior Critical Components of
Buildings in the Central District FY23 $117,751 FY23 Cyclic
175057
Rehabilitate 8 Historic Buildings in the Big
Meadows Developed Area for Visitor
Enjoyment FY20 Request $214,501.29 ReRe
336339
Rehabilitation of Big Meadows
Campground Historic Registration Station FY26 Request $208099.84 No Cyclic
(nps.gov)
Statement) Buildings and Ancillary Structures
1. Roofing and Stormwater Shedding Systems: Roof system, flashing, gutters, downspouts, venting, roofing features
2. Building Exterior Envelope (all): Siding, windows, doors, facia, trim, soffits, finishes, foundations, basement
3. Masonry: Foundation, chimney, steps, exterior veneers, driveway, concrete floors/ walks, basements
4. Interior Finishes: Paint, Drywall/plaster walls and ceilings, paint, trim, flooring and floor coverings, interior fixtures
5. Mechanical and Utility Systems: Electrical, emergency power generation, potable water supply, plumbing and piping, wastewater/sanitary sewer, storm sewer, HVAC, communications and IT signaling, lightning protection, fuel storage and supply (underground heating fuel tank size and age determination for life cycle replacement 50% usable life)
6. Life Safety Fire Detection/ Fire Suppression Systems: Standpipe, fire pump, system type, detection equipment, intrusion systems, size, and age determination for life cycle replacement 50% usable life.
7. Accessibility: Observed physical barriers, walkways, clearances, entrances, grade, slope (PSA is not an Accessibility Assessment)
8. Potential hazardous materials remediation issues interior and exterior: Observed mold, asbestos, lead (PSA is not an environmental assessment).
9. Vertical transportation systems of all types, interior and exterior
Maintained Landscapes
10. Grounds: Grades, drainage and stormwater management, vegetation, turf grass, walkways, Scope must be signed‐off on by all parties prior to visit. The A/E will not scope additional projects outside of the originally agreed upon scope once on site.
Park specific documents will be key to visit success. Many documents are not housed in Electronic Technical Information Center (eTIC). Provide A/E with as much project relevant information as you can prior to the visit.
Project tour Point of Contact (POC) must be briefed or very knowledgeable about project.
Work with A/E to establish report deadlines at closeout meeting.
Adhere to deadlines. Once A/E delivers report, the region/park will have 15 days to review/comment.
A/E POC:
Site Visit Dates:
☐Supporting Documentation – As‐Builts, drawings, maps, photos, previous conditions assessments, relevant studies: asbestos, lead‐based‐paint, HazMat, Geotech, Historic Structure Report, Cultural Landscape Report, FMSS Data – Asset Locations, Asset Details, and Work Orders etc. Any type of plan that has already been developed for the park, what is the driving master plan for the park.
☐Project Site Walk‐through – Devote time/personnel to walk the facility/site and meet with PSA team during assigned week.
☐Meeting Space (Outdoor, open air meeting space with enough room for a minimal staff PSA team).
Conference room or workspace to meet as a team with Supt, FM, appropriate personnel during site visit. Kick off and close out will be done online.
| Appendix B1-GOIS - PIF - |
| Appendix B3-HAGR - PIF |
| Appendix B2-STLI - PIF - |
| THRB_PIF |
| Appendix G -NPS Directors' Order #36 Housing - Copy.pdf |
| Title sheet - Copy (2) |
| Appendix H - DO#36_Housing_8-5-2009 |
File details come from the government source that posted it. Updated .