This document is an amendment to an RFI (Request for Information) for PSA South - RFQ 140P4324Q0029. It addresses several questions from the vendor regarding the requirements for the proposal submission, including the availability of Attachment 1, the project schedule, proposed team member details, and resumes, as well as clarification on conflict of interest concerns and restrictions on aerial photography.
The key details are:
- Attachment 1, the Condition Assessment Firm Fixed Price Excel Form, is missing and the vendor requests it be provided.
- The 8-page limit applies to the technical proposal, not the project schedule, which can be submitted as an attachment.
- Proposed team member details, including qualifications and roles, are to be included within the 8-page limit. The vendor requests an increase to the page limit.
- Resumes for the proposed team are not required at this stage, except for the project manager. Subject matter expert resumes will be required if the contract is awarded.
- There are no conflict of interest concerns for potential future Construction Management Representative work.
- Aerial photography using drones is not allowed on National Park Service land, and only hand-taken landscape pictures are permitted.
View the file
Other files for this federal contract opportunity
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PSA South – RFQ 140P4324Q0029
Amendment 0001 RFI (1-8)
1. Page 7 of the RFQ document references Attachment 1; however, Attachment 1 appears to be missing. Could the NPS provide Attachment 1?
Attachment 1 is the Condition Assessment Firm Fixed Price Excel Form, attachment 10.
2. Regarding the project schedule, could the NPS please clarify if it should be included as an attachment or if the NPS intends for it to be within the 8-page limit?
The 8-page limit is for the technical proposal submitted with the quote.
3. Regarding the proposed team members, are the details of their qualifications and roles to be included within the 8-page limit? If so, can we request that the page limit be increased?
Yes, 8-page limit is for the proposed team members.
4. Are resumes required for the proposed team members, and should they be submitted as attachments?
A general qualification resume from the company with similar projects to PSA should suffice. Team member resumes are not required at this stage.
5. Which positions does the NPS specifically require details and resumes for?
For the quote bid document, project manager resumes are required at this stage. At the time of kick-off meeting once contract has been awarded, subject matter expert resumes will be required for approval.
6. Does the participation in this contract raise any conflict-of-interest concerns for potential future Construction Management Representative work if such contracts were to become available based on the assessments conducted under this contract?
No
7. Will the NPS provide permits for the necessary aerial photography as required by the Statement of Work?
Drones are not allowed on National Park Service Land. Landscape pictures, and photographs can be taken by hand only are allowed. No IT photographs are allowed by Federal Regulation.
8. Should the Overall Project Management costs for each PSA site be combined with the line item for remote assistance in the Project Cost Summary?
These need to be separate costs.