Appendix_A_Inspection_Checklist.pdf
PDF 143 KB Posted
- Attached to
- USFS R1 HVAC Maintenance Services Federal contract opportunity
- Solicitation number
- 12034320Q0169
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| R1 Lolo NF HVAC Services solicitation (2).pdf | ||
| SF-30 sol amend 0002 (1).pdf | ||
| Q and A no. 2.pdf | ||
| SF-30 sol amend 0001 (1).pdf | ||
| Q and A sol. 20Q0169.pdf | ||
| Bldg24_HVAC_Control_Locations drawing.pdf | ||
| QASP.pdf | ||
| Schedule of Items.pdf | ||
| Experience Questionaire.docx | DOCX document | |
| Performance Work Statement R1 Lolo NF HVAC Services solicitation.pdf | ||
| SCA Wage Determination.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Missoula Bldg 24
HVAC PM INSPECTION LIST
LINE
No. FLR ROOM ITEM Quantity DESCRIPTION DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS LINE
No.
1. Basement Boiler room Gas Fired Boiler 2ea Peerless Model 211-11-5 X X X X 1
2. Hot Water Circ pumps & motors 2ea TACO- 7.5 HP X X X X 2.
3. Boiler Draft Fans 2ea X X X X 3.
4. Boiler Room Controls 1ea Johnson Controls X X X X 4.
5. Condensate Drain Sump 1ea X X X X 5.
6. Sump Pump 1ea X X X X 6.
7. Motorized Gas Shut Off Valves 2ea X X X X 7.
8. Motorized Hot Water Supply Line 1ea X X X X 8.
9. Domestic Type Water Heater 1ea 40 gallon X X X X 9.
10. Radon Systems 4ea X 10.
11. Chiller Room Hot Water Circ pumps & motors 2ea TACO- 7.5 HP X X X X 11.
12. Chiller controls 1ea X X X X 12.
13.
HVAC
Management System
1ea Johnson Controls Computer X 13.
14. Temperature Alarm 1ea Johnson Controls Computer X 14.
15. Outside Air Freeze Stats 1ea Johson Controls Computer X 15.
16. Commercial Water Heater 1ea 100 gallon X X X X 16.
17. Hallways and Offices Fin Tube Radiators various locations X 17.
18. Wall Mounted Thermostats various locations X 18.
19. Bathrooms Exhaust Fans 2ea X X X X 19.
20. Computer Room
(Cooling) coil, fan, and thermostat 1ea X X 20.
21. Computer Room
(Cooling) coil, fan, and thermostat 1ea X X 21.
22. First Floor Hallways and Offices Fin Tube Radiators various locations X 22.
23. Wall Mounted Thermostats various locations X 23.
24. Bathrooms Exhaust Fans 2ea X X X X 24.
25. First Floor Ceiling
Overhead Space Air Handler #1 1ea AAON, 5780 cfm, 5hp X X X X 25.
26. Filter Section #1 10ea 16 x 20 x 2 Filter X X X X 26.
27. Air Handler #2 1ea AAON, 2985 cfm, 2hp X X X X 27.
28. Filter Section #2 4ea 16 x 20 x 2 Filter X X X X 28.
29. Air Handler #4 1ea AAON, 2135 cfm, 2hp X X X X 29.
1st QUARTER October - December
2nd QUARTER January - March
3rd QUARTER April - June
4th QUARTER July - September
Fort Missoula Bldg 24
LINE
No. FLR ROOM ITEM Quantity DESCRIPTION DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS LINE
No.
1st QUARTER October - December
2nd QUARTER January - March
3rd QUARTER April - June
4th QUARTER July - September
30. Filter Section #4 2ea 16 x 20 x 2 Filter X X X X 30.
31. Air Handler #5 1ea AAON, 5780 cfm, 5hp X X X X 31.
32. Filter Section #5 10ea 16 x 20 x 2 Filter X X X X 32.
33. Bathroom Exhaust Fans 2ea X X X X 33.
34. Exterior Ground Mounted
AC mini split condenser #1 1ea EMI 7.5A, computer room, courtyard X X X X 34.
35. AC mini split condenser #2 1ea EMI 7.5A, telephone/comm room, front of building X X X X 35.
36. Chiller #1 1ea McQuay AGZ-085B, 75 ton, north side X X X X 36.
37. Second Floor
Hallways and Offices Fin Tube Radiators various locations X 37.
38. Wall Mounted Thermostats various locations X 38.
39. Bathrooms Exhaust Fan Timer 1ea X X X X 39.
40. Exhaust Fans 2ea X X X X 40.
41. Attic Attic Air Handler #3 1ea AAON, 9985 cfm, 7.5hp X X X X 41.
42. Filter Section #3 10ea 16 x 20 x 2 Filter X X X X 42.
43. Air Handler #6 1ea AAON, 9395 cfm, 7.5hp X X X X 43.
44. Filter Section #6 10ea 16 x 20 x 2 Filter X X X X 44.
45. Fresh Air Blower 2ea X X X X 45.
46. Bathroom Exhast Fan 1ea X X X X 46.
Verification of Completion 47.
Service Mechanic (sign & date) 48.
Supervisor (sign & date) 49.
COR (sign & date) 50.
Fort Missoula Bldg 26
LINE
No. FLR ROOM ITEM Quantity DESCRIPTION DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS LINE
No.
1. Basement Boiler room South
Gas Fired Boiler & Accessories 4ea Knight Model WH 55 - 399 X X 1
2. Hydronic Pumps 5ea Grundfos PACO X X 2.
3. Cooling Tower Controls 1ea X 3.
4. Daiken Master Controller 1ea X 4.
5. DDC Computer 1ea X 5.
6. Glycol Cooling Tower 1ea X 6.
7. Domestic Hot Water Heater 1ea 80 gal Bradford White X 7.
8. Circulation Pump 1ea X 8.
9. Water Softener 1ea North Star X 9.
10. Water Cooled Heat Pumps 8ea Daikin (Model #: RWEYQ) X X 10.
11. Boiler Room North
Water Cooled Heat Pumps 8ea Daikin (Model #: RWEYQ) X X 11.
12. HRV 3 1ea Venmar CES X X X X 12.
13. Central IT Room
Environmental Control Unit 1ea Liebert DS X X X X 13.
14. Sump Pump 2ea Zoeller X X X X 14.
15.
Cooling Tower Control
Cooling Tower Controls 1ea Advantage Controls X X 15.
16. Cooling Tower Chemicals 1ea 100 gallon X X 16.
17. Bathrooms Exhaust Fans 2ea X X X X
18. Offices &
Hallways Branch Selectors 9ea Various Locations X
19. External External Radon Systems 3ea X X 19.
20. Cooling Tower 1ea X X 20.
21. Condensing Unit 1ea Liebert X 21.
22. Condensing Unit 1ea Daikin X 22.
23. First Floor Bathrooms Exhaust Fans 2ea X 23.
24. Offices & Hallways Branch Selectors 12ea Various Locations X 24.
25. Second Floor
Offices & Hallways Branch Selectors 16ea Various Locations X 25.
26. Bathrooms Exhaust Fans 2ea X X X X 26.
27. IT Room Mini Split 1ea Daikin X X 27.
28. Attic Attic HRV 1 1ea Venmar CES X X X X 28.
1st QUARTER October - December
2nd QUARTER January - March
3rd QUARTER April - June
4th QUARTER
Fort Missoula Bldg 26
LINE
No. FLR ROOM ITEM Quantity DESCRIPTION DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS LINE
No.
1st QUARTER October - December
2nd QUARTER January - March
3rd QUARTER April - June
4th QUARTER July - September
29. HRV 2 1ea Venmar CES X X X X 29.
Verification of Completion 30.
Service Mechanic (sign & date) 31.
Supervisor (sign & date) 32.
COR (sign & date) 33.
Fort Missoula Bldg 46
LINE
No. FLR ROOM ITEM Quantity DESCRIPTION DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS DUE DATE
COMPLETED INITIALS LINE
No.
1. Basement Boiler room Gas Fired Boiler 1ea Weil McLain PFG-6-PIN, 305,000 BUT input X X X X 1.
2. Hot Water Circ pumps & motors 1ea TACO- 1/8 HP X X X X 2.
3.
Motorized Hot Water Supply Valves
Honeywell, 2" Valves X X X X 3.
4. Motorized Flue Damper 1ea X X X X 4.
5. Domestic Type Water Heater 1ea 40 gallon X X X 5.
6. First Floor Hallways and Offices Fin Tube Radiators various locations X 6.
7. Cast Iron Radiators various locations X 7.
8. Wall Mounted Thermostats various locations X 8.
9. First Floor Ceiling
Ovrhead Space Return Air Filter 21 x 24 x 1/4 X X X X 9.
10. Evaporator Coil 1ea Carrier 28HQ 018 X 10.
11. Fan Unit 1ea Carrier 40FS 075 X 11.
12. Exterior Ground Mounted AC Compressor 1ea Carrier 38EA 015 X X X X 12.
13. Second Floor
Hallways and Offices Fin Tube Radiators various locations X 13.
14. Cast Iron Radiators various locations X 14.
15. Lower Level Garage Hot Water Unit
Heater 1ea X X X X 15.
16. Cast Iron Radiators various locations X 16.
Verification of Completion 17.
Service Mechanic (sign & date) 18.
Supervisor (sign & date) 19.
COR (sign & date) 20.
1st QUARTER October - December
2nd QUARTER January - March
3rd QUARTER April - June
4th QUARTER
| Bldg24 |
| Bldg26 |
| Bldg46 |
File details come from the government source that posted it. Updated .