Amendment 0006 BID ITEM - Replace Roofs Building 1 and 23.docx
DOCX document 13 KB Posted
- Solicitation number
- 0006
About this file
This amendment modifies bid items for a federal contract to replace roofs on two buildings for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. The solicitation seeks bids for four items: the base bid to replace roofs on Buildings 1 and 23 within 210 calendar days; Bid Deduct 1 omitting work on Building 1's bridge for 180 calendar days; Bid Deduct 2 substituting translucent fiberglass panels for insulated glass units on Building 1 without need for an aluminum box tube over 210 calendar days; and Bid Deduct 3 omitting Building 1's bridge work under the same specifications as Bid Deduct 2 over 180 calendar days. Bids are due by May 29, 2020. The amendment revises the period of performance and provides additional bridge details. All other terms remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25520R0060 0006.docx | DOCX document | |
| Amendment 0006-Bridge length.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Roofs Building 1 and 23 Bid Item
Bid item 1 Base Bid includes all work as documented in drawings dated 02-27-2019 as well as revised in this Addendum No: 3 dated 05-14-2020 and include the replacement of existing vertical translucent fiberglass wall panels with new on the bridge located between the east and west shed skylights. Period of Performance 210 calendar days.
Bid item 2 Bid Deduct 1; The same as Bid 1 except omit all work associated with Building 1 bridge replacement of existing vertical translucent fiberglass panels with new vertical translucent fiberglass panels. Period of Performance 180 calendar days.
Bid item 3 Bid Deduct 2; The same as Bid 1 except in lieu of the insulated glass unit GL-1 and added 4”x 8” aluminum box tube, provide translucent fiberglass panel TFG-01 in lieu of GL-1 without the use or need for an added aluminum box tube. Period of Performance 210 calendar days.
Bid item 4 Bid Deduct 3; The same as Bid 3 except omit all work associated with Building 1 bridge replacement of existing vertical translucent fiberglass panels with new vertical translucent fiberglass panels. Period of Performance 180 calendar days.
File details come from the government source that posted it. Updated .