AM9377768 - servomechanism traverse May 2010.pdf

PDF 107 KB Posted

Attached to
DDAA SPI CONTAINERS COMBINED SYNOPSIS SOLICITATION Federal contract opportunity
Solicitation number
SP330023Q0202
Issued by
Defense Logistics Agency Distribution

About this file

This document provides special packaging instructions for a servomechanism traverse. It specifies that the item is to be cleaned, dried, wrapped in MIL-PRF-121 tape and MIL-A-3174 wrap. It then requires the item be placed in two layers of MIL-A-3174 liner within a foam-filled MS27684-8 drum, with a MIL-A-59136 bottom pad. The drum is to be marked as a reusable container according to MIL-STD-129. Additional details are provided on cleaning methods, foam application techniques, and acceptable cushioning materials for filed returns if the split-pack foam is damaged. The related federal contract opportunity is a combined synopsis/solicitation from the Defense Logistics Agency Distribution seeking SPI containers, with a solicitation number of SP330023Q0202.

View the file

Other files for this federal contract opportunity

Other files attached to DDAA SPI CONTAINERS COMBINED SYNOPSIS SOLICITATION, newest first.
File Type Posted
Amendment SP3300-23-Q-0202-P0001.pdf PDF
AK16918076 Display July 2023.pdf PDF
AK14068167 Aug 2022.pdf PDF
AK99658029- dischargergrenade Nov 2019.pdf PDF
AK14631438 - panel vehicular ope June 2010.pdf PDF
Tab 10 - CSS SP3300-23-Q-0202.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIAL PACKAGING INSTRUCTION

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 30 days per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information

Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, Va 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subjected to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THIS ADDRESS.

1. PART OR DRAWING NO. NOMENCLATURE 2. CODE INDENT 3. SPI NO.

9377768 SERVOMECHANISM, TRAVERSE 19200 AM9377768

4. NATIONAL STOCK NO. 5.DATE OF

DRAWING/SPI(YYMMDD)

6. REVISION / ERR NO.

4810-01-391-8454 05-11-10 A/H05K2008

7. QUP / UNIT OF ISSUE 8. ICQ 9. UNIT PACK WT. (LB) (0.0) 10. UNIT PACK CU (CU.

FT.)(0.000)

11. UNIT PACK SIZE (INCHES)(00.0)

1/EA - 75.0 2.495 22.0 X 14.0 X 14.0

12. MILITARY PRESERVATION 18.

STEPS

19.

REQD

20.

DESCRIPTION

MIL-STD-2073-1, METHOD 45 1 AR WRAP,MIL-PRF-121, TY-I

13. CLEANING 2 AR TAPE, A-A-883

* 3 AR WRAP, A-A-3174, TYPE-II SEE NOTE (A)

14. DRYING 4 1 BOTTOM PAD, A-A-59136, TYPE-I, CLASS-2 (B)

* 5 AR LINER, A-A-3174, TYPE-II, SEE NOTES (C) AND (D)

6 FOAM-IN-PLACE, MIL-HDBK-775, SEE NOTE (D) 15. PACKING

7 1 DRUM MS27684-8 SEE NOTES (E) AND (F)

a. LEVEL A

MIL-STD-2073-1

b. LEVEL B

MIL-STD-2073-1

16. MARKING

MIL-STD-129 AND NOTE (E)

17. NOTES/DRAWINGS

* UNLESS OTHERWISE SPECIFIED, CLEANING AND DRYING SHALL BE IN ACCORDANCE WITH PARAGRAPH

5.2.1 OF MIL-STD-2073-1. THE INTERNAL CLEANLINESS OF THE ITEM SHALL CONFORM TO MIL-STD-1249, LEVEL 200, REQUIREMENTS. WEIGHTS AND SIZES ARE ESTIMATED AND MAY VARY SLIGHTLY.

INTERMEDIATE PACKAGING AND PACKING WILL BE IN ACCORDANCE WITH SPECIFICATION MIL-STD-2073-1

OR AS OTHERWISE SPECIFIED HEREON.

(A) ENCAPSULATE ENTIRE ITEM IN MATERIAL PRIOR TO PROCEEDING WITH FOAM-IN-PLACE OPERATIONS.

(B) CUT ONE 2 INCH THICK PAD FOR THE BOTTOM OF THE DRUM AND INSERT. SIDE OF PAD SHOULD BE A

“SLIDE FIT” INTO THE DRUM.

(C) TWO LINERS ARE REQUIRED. PLACE THE FIRST OF THE TWO LINERS LOOSELY INTO THE DRUM. COVER

THE BOTTOM PAD AND BRING THE ENDS OF THE LINER UP OVER THE SIDES OF THE DRUM.

(D) FOLLOW THE FOAM-IN-PLACE PROCEDURES FOR TECHNIQUE II. AFTER FOAMING THE DRUM HALF FULL, FOLD THE LINER INWARD OVER THE FOAM. THIS IS THE FIRST PART OF THE SPLIT PACK. IMMEDIATELY PLACE THE WRAPPED ITEM ON TOP OF THE PLASTIC LINED FOAM WITH THE “TRANDUCER END” FACING THE TOP OF THE DRUM. HOLD THE ITEM IN PLACE UNTIL THE FOAMHAS RISEN TO APPROXIMATELY THE MIDDLE OF THE ITEM AND HAS SET ENOUGH TO SUPPORT THE ITEM. DRAPE THE SECOND LINER LOOSELY INSIDE THE COTNAINER COVERING THE TOP OF THE ITEM. DISPENSE A SUFFICIENT AMOUNT OF FOAM MIX INTOT HE CONTAINER TO SURROUND THE ITEM AND FILL THE CONTAINER WITH EXPANDED FOAM. THIS IS THE SECOND PART OF THE SPLIT PACK. FOLD THE RISING FOAM INWARD WHEN CERTAIN THAT THE RISING FOAM WILL FILL THE CONTAINER. IF THE DRUM BECOMES OVERFILLED, TRIM OFF EXCESS. APPLY APPROPRIATE CLOSURE FOLLOWING COMPLETION OF NOTE F BELOW. ALLOW TIME FOR FOAM TO SET

BEFORE MOVING DRUM.

(E) THE UNIT CONTAINER IS ALSO THE SHIPPING CONTAINER. MARK THE CONTAINER “REUSABLE CONTAINER—DO NOT DESTROY”. SELECT APPROPRIATE DOWN PARTS TO DRUM TO ENSURE PROPER

ASSEMBLY.

(F) TAPE A COPY OF THIS SPECIAL PACKAGING INSTRUCTION TO THE UNDERSIDE OF THE LID PRIOR TO

SEALING DRUM.

(G) FOR FILED RETURNS: IF THE TOP PART OF THE SPLIT-PACK FOAM IS DAMAGED BEOND REUSE OR IS LOST, THE FOLLOWING CUSHIONING MATERIALS MAY BE USED TO FORM A TIGHT PACK: A-A-1898; PPP-C-

1120; PPP-C-1797; A-A-59136.

WSC: JE ITEM SIZE: 13.38 X 9.00 X 6.75 ITEM WEIGHT: 56.00 APPROVED: Vishwa N. Khanna

DISTRIBUTION STATEMENT A, UNLIMITED

DD Form 2169, JUN 1997 Previous editions are obsolete Page 1 of 1 Pages

File details come from the government source that posted it. Updated .