4. AL-1685-4169A_SR Bifurcated Chamber ACL (reference only).pdf
PDF 1 MB Posted
- Attached to
- LBNL RFP HW-03292024 SR Bifurcated Chambers
- Solicitation number
- Not on record
- Issued by
-
Department of Energy
About this file
This document is an Acceptance Criteria List (ACL) that describes the acceptance criteria for SR VC02 & VC03 and VC11-IR vacuum chambers as part of the Advanced Light Source Upgrade (ALS-U) project at Lawrence Berkeley National Laboratory (LBNL).
The ACL outlines the visual, mechanical, vacuum, NEG coating, and shipping inspection requirements for the vacuum chambers. Key details include dimensional tolerances, cleanliness requirements, leak testing parameters, pressure testing, and required documentation. The chambers must meet specific criteria for factors such as surface finish, part markings, flange condition, vacuum quality, and NEG coating thickness. The document also includes provisions for nonconformance reporting and inspection data recording. This ACL will be completed for each vacuum chamber delivered as part of the ALS-U project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advanced Light Source Upgrade Project Lawrence Berkeley National Laboratory
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
Printed hard copies of this document are for reference only.
SR Bifurcated Chamber ACL
Release Date: Feb 2 2024 1:07:00 PM PST
Document Number: AL-1685-4169 Revision: A
Document Status: Released
Document Type: ACCEPTANCE CRITERIA LIST (ACL)
Category Code: AL7531
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
W
Downloaded by: Olusola Omolayo at February 09, 2024 12:06:51
AL-1685-4169 Rev. A Doc. Status: Released Page 2 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
TABLE OF CONTENTS
1 Revision History
2 Approvals
3 Abbreviations and Acronyms
4 Authorizing Document
5 Scope
6 Acceptance Criteria Listing Form
6.1 Visual Inspection
6.1 Mechanical Inspection
6.2 Vacuum Inspection
6.3 NEG Coating Inspection
6.4 Mechanical Inspection
6.5 Shipping inspection
6.6 Documentation
6.7 Observations / Comments
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 3 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
1 REVISION HISTORY
Rev. CM Number Description of Change A Baseline B Modification of the title, VC11-IR added
2 APPROVALS
The following individual(s) shall approve this document:
Approver Project Role Jiani Niu Project QA manager Olusola Omolayo Vacuum CAM Windchill Approved / Concurred By oomolayo ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 4 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
3 ABBREVIATIONS AND ACRONYMS
ALS-U Advanced Light Source Upgrade SR Storage Ring HE Helium HPN2 High purity Nitrogen QA Quality Assurance
4 AUTHORIZING DOCUMENT
LBNL QA Plan PUB 3111: https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
LBNL ALS-U Quality Assurance Plan, AL-1024-3173, https://dcc.lbl.gov/download.php?filename=AL-
1024-3173A.pdf
5 SCOPE
This document describes the acceptance criteria for SR VC02 & VC03 and VC11-IR vacuum chamber. This document shall be filled out for each SR VC02 & VC03 and VC11- IR vacuum chamber.
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
W https://commons.lbl.gov/display/rpm2/Quality+Assurance+Policy
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6 ACCEPTANCE CRITERIA LISTING FORM
Level of Care : ☐ Very High ☐ High ☐ Medium ☐ Low
Prepared by: Group:
Email: Location:
Phone: Date:
Part Name: Quantity:
Part Number: S/N (if applicable)
NCR Reviewers
Additional Remarks:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 6 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.1 Visual Inspection
Verification and Testing Requirements
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
1.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
No visual damage on the outside of the vacuum chamber
NCR #: PASS ☐ FAIL ☐
N/A ☐
INITIALS DATE
2.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
LBNL Part and serial number are inscribed on chamber
3.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Flange knife-edges are completely smooth and interruption-free when examined by lightly running an ethanol-wetted rubber cleanroom gloved finger around them.
4.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Cleanroom wipes wetted with electronic grade ethanol do not yield debris or particles, or discoloration of the wipes
5.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Presence of all fitting for cooling channel on the vacuum chamber ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
Downloaded by: Olusola Omolayo at February 09, 2024 12:06:52
AL-1685-4169 Rev. A Doc. Status: Released Page 7 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
6.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
Threaded holes inspected with an electronic grade alcohol-soaked cleanroom swab do not yield particles or discoloration.
7.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Presence of Helicoils on the BPM housing
8.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Presence of Pin (Round and Diamond) on the Obround flange
9.
4167_SR
Bifurcated
Chamber
Engineering
Specification
No deformed or punched heater groove all around the vacuum chamber
10.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Presence of fiducial nests on the chamber ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 8 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.1 Mechanical Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
11.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
CMM measurement verification before bakeout:
Tolerancing of agreed dimension are verified.
6.2 Vacuum Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
12.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
RGA scan:
Check all RGA scans reach the required criteria:
o With the chamber baked and at room temperature, the Sum of all peaks higher than Mass
44 shall be lower than
1/1,000th of total pressure o Partial pressure of Mass 18 shall be less than Mass 2 o Partial pressure of Mass 69 shall be less than 1/2,000th of total pressure o Partial pressure of Mass 14 shall be less than Mass 18.
NCR #:
PASS ☐ FAIL ☐
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 9 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
13.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
Final He Leak Test:
The chamber was pumped down below 1.0x10-4 Torr before leak checking
Verify that the maximum leak rate is below 1x10-10 torr-liters/sec
NCR #:
6.3 NEG Coating Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
14.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
NEG coating visual inspection:
The NEG coating coverage on the internal surface of the chamber along the electron beam path channel shall be greater than 99%
NCR #:
15.
4167_SR
Bifurcated
Chamber
Engineering
Specification
NEG coating thickness verification:
The thickness of the NEG coated copper ribbon shall be in between 0.3 to 1.5 micron.
The measurement shall be taken in at least 3 locations of the ribbon.
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 10 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.4 Mechanical Inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
16.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
CMM measurement verification
After bakeout:
Tolerancing of agreed dimension are verified.
NCR #:
17.
4167_SR
Bifurcated
Chamber
Engineering
Specification
Pressure test:
Pressure: 120 Psi
Duration: 10 min
NCR #:
6.5 Shipping inspection
ITEM
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
18.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
HPN2 backfill:
The chamber shall be filled with HPN2 at or near atmospheric pressure
The chamber is shipped in sealed condition
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 11 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.6 Documentation
ITE
M
NO.
REQ ID /
DCC doc #
CHARACTERISTIC OR TEST TO BE
CONDUCTED, VERIFIED or
WITNESSED
VERIFYING
VENDOR
ENTITY
NonConformance
Report # if NCR exists
PASS / FAIL
DATE
VERIFICATION REPORT/
INSPECTION DATA
19.
AL-1685-
4167_SR
Bifurcated
Chamber
Engineering
Specification
Documentations:
All documentation related to the vacuum chamber are provided such as :
He leak test report
CMM measurement report
Certification of conformance
Etc…
NCR #:
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
AL-1685-4169 Rev. A Doc. Status: Released Page 12 of 12
All officially released LBNL documents are watermarked and contain LBNL Document Control Center release information in the lower-left corner of the document's pages.
6.7 Observations / Comments
Use the following table to make observations on the previous tests conducted if needed.
ITEM NO. Observation / Comments ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: F eb ru ar y 2n d, D C
C A ut h
K ey
: K 9U
H N
7J
BI
File details come from the government source that posted it. Updated .