UNITED STATES COAST GUARD
AIR STATION SACRAMENTO
6037 PRICE AVENUE
MCCLELLAN, CA 95652
SCOPE OF WORK FOR
DRIVE-IN CONTAINMENT SYSTEM FOR 5,000 GALLON FUEL TRUCK
INTENT: PROCURE A CONTRACT TO BUILD A CUSTOM SPILL CONTAINMENT
SYSTEM FOR THE UNITS 5,000 GALLON FUEL TRUCK THAT EXCEEDS THE EPA
REQUIRMENTS.
1. GENERAL REQUIREMENTS: WORK CONSISTS OF DESIGNING AND BUILDING
STEEL MODULAR CONTAINMENT SYSTEM. PROVIDING ALL LABOR,
EQUIPMENT, MATERIALS, TRANSPORTATION, AND INCIDENTALS AS
REQUIRED FOR THE SHIPPING AND ASSEMBLING, TO AIR STATION
SACRAMENTO, 6037 PRICE AVE. MCCLELLAN CA, 95652.
2. EQUIPMENT SPECIFICATIONS AND FEATURES: THE EQUIPMENT
REQUESTED IS A CUSTOM BUILT STEEL DRIVE-IN/DRIVE-OUT CONTAINMENT
SYSTEM FOR OUR 5,000 GALLON FUEL TRUCK. WE NEED A SYSTEM THAT
WILL ACCOMMODATE OUR TRUCKS DIMENSIONS, 420” INCHES LONG BY 102”
INCHES WIDE. AND A SYSTEM THAT WILL MEET OR EXCEED THE CAPACITY
OF 5,500 GALLONS. A DURABLE FINISH TO PREVENT RUST, AND INCLUDE
MULTIPLE DRAIN FILTER BOXES WITH BALL-VALVES.
USEPA REQUIREMENTS FOR ONSHORE FACILITIES SPCC RULE 40 CFR PART
112.
EQUIPMENT FEATURES:
EXCEEDS CAPACITY OF 5,500 GALLONS.
DRIVE IN/DRIVE OUT RAMP SYSTEM ON BOTH SIDES OF SYSTEM.
AT LEAST QUARTER INCH STEEL PLATE CONSTRUCTION.
DURABLE FINISH TO WITHSTAND INCLIMATE WEATHER, AND HEAVY
TRAFFIC, AND TO PREVENT CORROSION.
ALLOW FITMENT OF TRUCK 420”INCHES LONG BY 102” INCHES WIDE.
MULTIPLE DRAIN BOXES WITH DRAIN-VALVES, THAT ALLOW USE OF
ABSORBENT PILLOWS.
MODULAR DESIGN.
3. JUSTIFICATION: THE USEPA SPCC PART 112 OIL POLLUTION PREVENTION
SUBPART A, DEFINITIONS AND GENERAL REQUIREMENTS FOR ALL FACILITIES
AND ALL TYPES OF OILS. REQUIRES US TO PROVIDE SECONDARY
CONTAINMENT FOR SPILL PROTECTION, PLUS 10 PERCENT OF THE TANKS
STORAGE CAPACITY. THE SYSTEMS WE HAVE USED IN THE PAST ARE
COSTLY, AND DO NOT LAST. THE CHEAPER SYSTEMS ON THE MARKET
CANNOT WITHSTAND OUR DAY TO DAY OPERATIONS. OUR LAST SYSTEM
BARELY LASTED ONE YEAR BEFORE REQUIRING REPAIRS, AND IS NOW
UNSERVICEABLE. WE ARE LOOKING FOR A SYSTEM THAT WILL WITHSTAND
DAILY USE, WHILE MEETING THE EPA GUIDELINES, AND PROVIDE A LONG
TERM USAGE.
4. ACCESS TO JOB SITE: COAST GUARD AIR STATION SACRAMENTO IS A
UNITED STATES GOVERNMENT FACILITY. ALL PERSONNEL ACCESSING CGAS
SACRAMENTO ARE SUBJECT TO ALL UNITED STATES FEDERAL LAWS AND
ENFORCE A PERSONNEL AND VEHICLE IDENTIFICATION OR SEARCH TO
ENSURE COMPLIANCE WITH UNITED STATES COAST GUARD SECURITY.
5. ACCEPTED FORMS OF IDENTIFICATION FOR CONTRACT PERSONNEL:
A) CONTRACT CONSTRUCTION PERSONNEL: A VALID CONTRACT EMPLOYEE
PICTURE IDENTIFICATION CARD. COMPANY/CONTRACTOR IDENTIFICATION
MUST BE WORN IN PLAIN SIGHT AT ALL TIMES WHILE ON COAST GUARD
PROPERTY.
B) CONTRACTOR WORK TRUCKS MUST BE MARKED.
C) ALL VEHICLES MUST BE CURRENTLY REGISTERED AND HAVE PROOF OF
INSURANCE.
D) EMERGENCIES: MUST BE IMMEDIATELY REPORTED TO THE OFFICER OF THE
DAY OR SENIOR DUTY OFFICER WHO CAN BE REACHED AT 643-7659.
6. SAFETY PROTECTIONS OF PERSONNEL AND PROPERTY: DURING THE
EXECUTION OF THIS CONTRACT, THE CONTRACTOR SHALL CONFORM TO THE
RULES AND REGULATIONS SET FORTH BY OSHA SAFETY AND HEALTH
STANDARDS, 29 CFR PART 1926- SAFETY AND HEALTH REGULATIONS FOR
CONSTRUCTION AND TITLE 8, CALIFORNIA ADMINISTRATIVE CODE –
CONSTRUCTION STANDARDS. WHEN THE STANDARDS DIFFER, THE MORE
RESTRICTIVE STANDARD WILL APPLY.
THE CONTRACTOR WILL BE RESPONSIBLE FOR INITIATING, MAINTAINING, AND
SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH
THE PERFORMANCE OF THIS CONTRACT.
THE CONTRACTOR SHALL MAINTAIN CURRENT APHIS CERTIFICATION FOR
TRANSPORTATION AND TREATMENT OF REGULATED GARBAGE.
THE CONTRACTOR SHALL TAKE REASONABLE PRECAUTIONS FOR SAFETY OF
AND SHALL PROVIDE REASONABLE PROTECTION TO PREVENT DAMAGE, INJURY,
OR LOSS TO:
A) EMPLOYEES AT THE WORK SITE AND OTHER UNRELATED PEDESTRIANS
B) THE CONTRACTOR SHALL ERECT AND MAINTAIN, AS REQUIRED BY EXISTING
CONDITIONS AND PERFORMANCE OF THE CONTRACT, REASONABLE
SAFEGUARDS FOR PEDESTRIAN AND OR VEHICLE SAFETY, INCLUDING THE
POSTING OF DANGER AREA, HAZARDOUS CONDITIONS SIGNS, OR OTHER SAFETY
RELATED APPLIANCES.
C) THE WORK AND THE MATERIALS AND THE EQUIPMENT TO BE INCORPORATED
THEREIN, WHETHER IN STORAGE ON OR OFF THE JOB SITE, UNDER CARE,
CUSTODY, OR CONTROL OF THE CONTRACTOR.
D) OTHER COLLATERAL PROPERTY SUCH AS LANDSCAPE, LANDSCAPE UTILITIES
NOT DESIGNATED FOR REMOVAL, RELOCATION, OR REPLACEMENT.
E) THE CONTRACTOR SHALL PROMPTLY REMEDY ANY DAMAGES AND LOSS TO
COLLATERAL PROPERTY AS REFERRED TO IN THE ABOVE POINT.
7. CONTINUITY OF FACILITIES OPERATION: NOTIFY THE CONTRACTING
OFFICER TECHNICAL REPRESENTATIVE IN ADVANCE OF ANY SHUTDOWNS AT
LEAST SEVENTY-TWO HOURS PRIOR TO THE DISRUPTION. PERFORM ALL ON-
SITE WORK BETWEEN THE HOURS OF 7:30 AM AND 9:00 PM, MONDAY
THROUGH SUNDAY.
8. NOTIFICATION OF START AND COMPLETION OF WORK: THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER AT A MINIMUM OF TWENTY
FOUR HOURS IN ADVANCE OF THE DATE AND TIME HE/SHE INTENDS TO
COMMENCE WORK UNLESS OTHERWISE AGREED UPON. THE SCHEDULE
SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT
DOCUMENTS UNLESS REVISED JOINTLY BY BOTH THE OWNER AND THE
CONTRACTOR DUE TO CONDITIONS OF THE WORK AND PROJECT. ONCE THE
WORK HAS BEEN COMPLETED, THE CONTRACTOR WILL NOTIFY THE
CONTRACTING OFFICER TO SET A DATE FOR FINAL INSPECTION.
9. CHANGES IN WORK: CHANGES IN THE WORK MAY BE ACCOMPLISHED
AFTER THE EXECUTION OF THE CONTRACT, AND WITHOUT INVALIDATING
THE CONTRACT BY A CHANGE ORDER. THE FEDERAL GOVERNMENT DEFINES
THE CHANGE ORDER AS A MODIFICATION TO THE CONTRACT. THE
MODIFICATION TO THE CONTRACT SHALL BE BASED UPON THE AGREEMENT
OF THE CHANGE IN WORK BY THE CONTRACTOR, CONTRACTING OFFICER’S
TECHNICAL REPRESENTATIVE, AND THE CONTRACTING OFFICER. THE
MODIFICATION TO THE CONTRACT IS A WRITTEN INSTRUMENT DESCRIBING
THE CHANGE IN THE WORK, APPROPRIATE COST ADJUSTMENTS, AND ANY
EXTENSION TO THE CONTRACT SCHEDULE TIME REQUIRED DUE TO THE
CHANGE IN THE WORK. THIS DOCUMENT IS PREPARED BY THE
CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE AND SUBMITTED TO
THE CONTRACTING OFFICER FOR APPROVAL AND PROCESSING.
10. NOISE: MAKE THE MAXIMUM USE OF “LOW-NOISE-EMISSION-PRODUCTS” AS
CERTIFIED BY THE EPA AND DESCRIBED AT 40 CFR PART 204. COMPLY WITH
APPLICABLE PORTIONS OF THE NOISE CONTROL ACT (NCA). THE
CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL OTHER FEDERAL,
STATE, AND LOCAL NOISE CONTROL LAWS AND REGULATIONS.
11. POLLUTION: COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS AND
REGULATIONS PERTAINING TO WATER, AIR, SOIL, AND POLLUTION.
PERIODIC SITE INSPECTIONS
12. THE COR WILL BE THE POINT OF CONTACT (POC) AND WILL QA THE
CONTRACT BY INSPECTING AND REPORTING TO THE CONTRACTING OFFICER
ON THE QUALITY AND QUANTITY OF WORK, MATERIALS, AND EQUIPMENT
USED FOR THE CONTRACT. THE COR WILL ALSO MONITOR JOB-SITE SAFETY,
AND MATERIAL JOB-SITE STORAGE.
13. AFTER THE CONTRACT IS AWARDED THE CONTRACTOR IS TO MAKE
CONTACT WITH THE COR.
QUALITY CONTROL
14. QUALITY CONTROL AND ENFORCEMENT IS THE CONTRACTOR’S SITE-
SUPERVISOR’S RESPONSIBILITY. THE QA WILL COORDINATE WITH THE
GOVERNMENT’S COR ON ALL CONSTRUCTION RELATED ISSUES.
15. CONTRACTOR’S ON SITE REPRESENTATIVE/SUPERVISOR: THE
CONTRACTOR WILL EMPLOY A COMPETENT SITE SUPERVISOR WHO WILL BE
AT THE JOB SITE DURING THE PERFORMANCE OF ALL WORK. THE
SUPERVISOR SHALL REPRESENT THE CONTRACTOR AND COMMUNICATIONS
GIVEN TO THE SUPERVISOR SHALL BE AS BINDING AS IF GIVEN TO THE
CONTRACTOR. IMPORTANT COMMUNICATIONS WILL BE PRESENTED AND
CONFIRMED IN WRITING.
16. ALL VEHICLES ARE NOT PERMITTED AT ANYTIME TO DRIVE OR PARK ON THE
EDGE OF THE GRASS DUE TO THE POSSIBLITY OF DAMAGING THE POP-UP
LAWN SPRINKLERS. ANY DAMAGED SPRINKLER HEADS SHALL BE REPORTED
AND THEN REPLACED AT THE CONTRACTOR’S EXPENSE.